Shahid Abbaspour Dam

Shahid Abbaspour Dam
(Karun-1 Dam)
Location Khuzestan, Iran
Coordinates 32°07′00″N 49°37′00″E / 32.11667°N 49.61667°E / 32.11667; 49.61667Coordinates: 32°07′00″N 49°37′00″E / 32.11667°N 49.61667°E / 32.11667; 49.61667
Opening date 1976
Operator(s) IWPRDC
Dam and spillways
Type of dam Arch dam
Impounds Karun River
Height 200 m (660 ft)
Length 380 m (1,250 ft)
Reservoir
Total capacity 3.139 km3 (2,545,000 acre·ft)
Surface area 54.8 km2 (21.2 sq mi)
Power station
Commission date 1976 - 2006[1]
Turbines 8 × 250 MW (340,000 hp) Francis-type
Installed capacity 2,000 MW (2,700,000 hp)

The Shahid Abbaspour Dam (also known as Karun-1 Dam) is a large arch dam providing hydroelectricity from the Karun River; it is located about 50 kilometres (31 mi) northeast of Masjed Soleiman, in the province of Khuzestan, Iran, and originally completed in 1976,[2] and formerly named "Reza Shah Kabir Dam".[3] The dam was the first of a series of dams planned for development on the Karun River.[4]

The dam is a double-curvature concrete arch dam, 200 metres (660 ft) high from the foundation rock. Its crest width is 6 metres (20 ft).[5] The arch dam design was chosen for the narrow, rocky gorge where it is located. The double-curvature arch design withstands the pressure created by the reservoir with a minimum of concrete, because the shape transmits the force of the reservoir downward and laterally, against the rock foundation; this has the effect of strengthening the dam concrete and its foundation by keeping it in compression.[6]

The dam site houses two power stations, one built in 1976 and another built in 1995. Each contains four water turbines connected to electric generators of 250 megawatts (340,000 hp), for a combined generating capacity of 2,000 megawatts (2,700,000 hp). The dam's electrical output is connected to the national electrical grid, with most generation occurring during periods of peak demand for electricity.

References

  1. "Hydroelectric Power Plants in Iran". IndustCards. Retrieved 21 February 2013.
  2. Shahid Abbaspour dam, translation from German.
  3. Peter Beaumont, Water Resource Development in Iran, in The Geographical Journal, Vol. 140, No. 3 (Oct., 1974), pp. 418-431
  4. P.T. Shourijed, A Soroush, N. Nemati, A.H Izad-doustdar, Karun River hydropower cascade development and its socio- environmental impacts in L. Berga, et al. (eds), Dams and Reservoirs, Societies and Environment in the 21st Century ..., Volume 1, (2006)
  5. Iran Ministry of Energy News
  6. "Dam basics". Retrieved 2008-06-11.
This article is issued from Wikipedia - version of the Saturday, September 26, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.