Shortest job next
Shortest job next (SJN), also known as Shortest Job First (SJF) or Shortest Process Next (SPN), is a scheduling policy that selects the waiting process with the smallest execution time to execute next.[1] SJN is a non-preemptive algorithm. Shortest remaining time is a preemptive variant of SJN.
Shortest job next is advantageous because of its simplicity and because it minimizes the average amount of time each process has to wait until its execution is complete. However, it has the potential for process starvation for processes which will require a long time to complete if short processes are continually added. Highest response ratio next is similar but provides a solution to this problem using a technique called aging.[2]
Another disadvantage of using shortest job next is that the total execution time of a job must be known before execution. While it is not possible to perfectly predict execution time, several methods can be used to estimate the execution time for a job, such as a weighted average of previous execution times.[3]
Shortest job next can be effectively used with interactive processes which generally follow a pattern of alternating between waiting for a command and executing it. If the execution burst of a process is regarded as a separate "job", past behaviour can indicate which process to run next, based on an estimate of its running time.
Shortest job next is used in specialized environments where accurate estimates of running time are available.
Weighted shortest job first
Weighted shortest job first (WSJF) is a modification of the concept used in agile development where the jobs get weighted with the cost of delay so that the most costly jobs get done sooner.[4]
Value-Flow Rate (VFR) is an alternate, more intuitive name given to WSJF which expresses cost of delay and duration using unitless relative "points" rather than actual units of time or money.[5]
See also
References
- ↑ Arpaci-Dusseau, Remzi H.; Arpaci-Dusseau, Andrea C. (2014), Operating Systems: Three Easy Pieces [Chapter Scheduling Introduction] (PDF), Arpaci-Dusseau Books
- ↑ Tanenbaum, A. S. (2008). Modern Operating Systems (3rd ed.). Pearson Education, Inc. p. 156. ISBN 0-13-600663-9.
- ↑ Silberschatz, A.; Galvin, P.B.; Gagne, G. (2005). Operating Systems Concepts (7th ed.). Wiley. p. 161. ISBN 0-471-69466-5.
- ↑ Reinertsen, Donald (2008). Principles of Product Development Flow: Second Generation Lean Product Development. Celeritas Publishing. p. 193. ISBN 978-1-935401-00-1.
- ↑ Knesek, Doug. "'Value-Flow Rate': A Better Name for a Great Measure". Retrieved April 8, 2016.
External links
|