Soroti Solar Power Station
Soroti Solar Power Station | |
---|---|
Location of Soroti Solar Power Station | |
Country | Uganda |
Location | Soroti, Tororo District |
Coordinates | 01°42′48″N 33°38′12″E / 1.71333°N 33.63667°ECoordinates: 01°42′48″N 33°38′12″E / 1.71333°N 33.63667°E |
Status | In development |
Construction began | 2016 |
Commission date | 2016 Expected |
Owner(s) | Access Power MEA (Access) & TSK Electronica |
Solar field | |
Type | Flat-panel PV |
Power generation | |
Nameplate capacity | 10 MW |
Soroti Power Station is a 10 megawatt solar power plant under construction in Uganda,[1][2] the third-largest economy in the East African Community.
Location
The power station will be located in Soroti District east of the town of Soroti in the Eastern Region of Uganda, approximately 300 kilometres (190 mi) by road, northeast of Kampala, the country's capital and largest city.[3]
Overview
The power station will have a 10 megawatt capacity, which will be sold directly to the Uganda Electricity Transmission Company Limited for integration into the national electricity grid. The power will be evacuated via a substation near the station. It is estimated that the energy generated will power approximately 40,000 homes located near the station, thereby keeping transmission losses to a minimum.[4]
Developers
The power station is being developed by a consortium of Access Power MEA (Access), a company based in the United Arab Emirates,[5][6] and TSK Electronica, a company based in Spain. They won the competitive bidding and were awarded the development contract at the same time as the developers of the Tororo Solar Power Station.[7]
Construction timeline, costs, and funding
The budgeted construction costs are US$17 million.[8] The project will receive partial funding from the European Union Infrastructure Trust Fund through KfW.[9] As of February 2016, construction is ongoing, with completion expected in the second half of 2016.[1][2][10]
See also
References
- 1 2 Graves, LeAnne (17 February 2016). "Dubai’s Access Power to build 10MW solar plant in Uganda". The National (Abu Dhabi). Retrieved 23 February 2016.
- 1 2 ERA (29 January 2016). "Access Uganda Solar Limited achieves Financial Close". Kampala: Electricity Regulatory Authority (ERA). Retrieved 29 February 2016.
- ↑ GFC (24 January 2016). "Distance between Kampala, Central Region, Uganda and Soroti, Eastern Region, Uganda". Globefeed.com (GFC). Retrieved 24 January 2016.
- ↑ Martin, Miguel (15 December 2014). "Two Teams Selected for Ugandan Solar Power Plants". IPPJournal.Com. Retrieved 30 December 2014.
- ↑ Smith, Matt (9 June 2015). "Access Infra To Launch In Uganda, Grow Across Africa". Business Daily Africa. Nairobi. Retrieved 9 June 2015.
- ↑ Sambo, John (18 January 2015). "$500m set for African renewable power". East African Business Week. Kampala. Retrieved 6 January 2016.
- ↑ Utilities ME Staff (11 December 2014). "Access Power To Build First Solar Plant In Uganda". Utilities-ME.Com. Retrieved 30 December 2014.
- ↑ Graves, LeAnne (11 December 2015). "Dubai power provider signs $17m Uganda solar deal". The National Newspaper. Abu Dhabi. Retrieved 21 January 2016.
- ↑ Marks, Jon (15 December 2014). "ERA and GET FiT announce the first 20 MW of Solar Photovoltaic (PV) projects to be developed In Uganda". Africa Investment Exchange. Retrieved 30 December 2014.
- ↑ Tajuba, Paul (21 March 2016). "10MW solar power plant to boost national grid". Daily Monitor. Kampala. Retrieved 21 March 2016.
External links
- Uganda Secures Funding for Key Solar PV Projects
- Uganda To Increase Power Generation
- 20MW of solar energy to be added to national grid
|