Swift Bus Rapid Transit

Swift

A southbound Swift bus at Wetmore Avenue Station in downtown Everett
Overview
Locale State Route 99, Snohomish County
Transit type Bus rapid transit
Number of lines 1 (1 more planned)
Number of stations 33 (31 more planned)
Annual ridership 1,557,404 (2014)[1]:37
Website www.communitytransit.org/swift/
Operation
Began operation November 29, 2009
Operator(s) Community Transit
Number of vehicles 15 diesel-electric hybrid buses
Headway 12–20 minutes
Technical
System length 16.7 mi (26.9 km)

Swift Bus Rapid Transit is a bus rapid transit system operated by Community Transit in Snohomish County, Washington, part of the Seattle metropolitan area. As of 2016, Swift has a single, 16.7-mile-long (26.9 km) line that runs on the State Route 99 corridor, serving the cities of Everett, Lynnwood, Edmonds, and Shoreline, with 33 stations organized into roughly 16 pairs. The line terminates at Everett Station to the north, connecting with Sound Transit's commuter rail and express bus services, and at the Aurora Village Transit Center in Shoreline to the south, connecting with King County Metro and the RapidRide E Line.

Swift has the highest ridership of any Community Transit route, carrying over 1.5 million total passengers in 2014.[1]:37–38 The service also has the highest frequency out of all Community Transit routes, running at 12-minute headways on weekdays from 6:00 a.m. to 7:00 p.m., and 20-minute headways during early mornings, late nights, and weekends.

Swift and its original 28 stations were opened on November 29, 2009 at a cost of $29 million. Four infill stations in Everett were opened in 2011, and a southbound infill station serving Edmonds Community College opened in 2016. A second line, from the Boeing Everett Factory to Mill Creek and Bothell via State Route 527, is in development, and is expected to open sometime after 2018. Long-range plans adopted by Community Transit include Swift trunk lines replacing its most popular corridors by 2030, feeding into future Link Light Rail stations at Lynnwood Transit Center and Everett Station.

Route

The southbound platform at Pecks Drive Station along Evergreen Way in Everett

Swift, designated internally as Community Transit Route 701,[2] begins at Bays G and H at the south end of Everett Station.[3]:72 Buses travel north on Smith Avenue, passing the station building and parking lots, and turn west onto Pacific Avenue towards Downtown Everett. The line continues west on Pacific, stopping at a station split between Wetmore and Colby avenues near the Snohomish County Government Campus, before turning south onto Rucker Avenue. The next station pair, split between 40th and 41st streets, serves The Everett Clinic and the Everett Memorial Stadium complex, as well as the northern terminus of the Interurban Trail.[4] Buses travel south in general purpose lanes on Evergreen Way, passing over State Route 526 north of Casino Road Station.[5] The road continues southwest as State Route 99 into the unincorporated community of Lake Stickney, where Swift stops at Airport Road Station, a future transfer station with the proposed Swift II line to the Boeing Everett Factory and Mill Creek,[6] and Lincoln Way Station north of an interchange with State Route 525.[7] The line enters the city of Lynnwood and moves into business access and transit (BAT) lanes at 148th Street Station,[8] where a queue jump signal for northbound buses was installed in 2012.[9][10] Swift continues south on State Route 99 through Lynnwood, serving the Lynnwood Crossroads area at 196th and 200th streets and the Edmonds Community College with a southbound-only stop at 204th Street, and continues into Edmonds to stop at the Edmonds Swedish Medical Center.[11] The line crosses over State Route 104 and enters the city of Shoreline in King County, before it turns east onto North 200th Street and reaches its southern terminus at Aurora Village Transit Center Bay 9.[12][13][14][15]

Stations

Swift serves 33 stations, grouped into 16 pairs, on its 16.7-mile-long (27 km) route,[16]:3 spaced approximately one mile (1.6 km) apart from each other.[16]:4 Swift stations consist of a 40-foot-long (12 m), 10-foot-wide (3.0 m) covered shelter on a 60-to-70-foot-long (18 to 21 m), 10-inch-high (25 cm) platform that allows for level boarding onto buses.[16]:4[17] The platform and shelter also include a roadside beacon that is lit at night, graffiti-resistant weather barriers, two Parkeon ticket vending machines,[18] two ORCA card readers, and a next bus arrival sign. Buses stop at all stations,[19] are allowed a dwell time of 10 seconds, and use curb bumpers to guide them closer to the platform.[9][17]

Transfers from Swift to other bus routes are possible at every station, served by shadow service running on the State Route 99 and Evergreen Way corridor between Swift stations and frequently-spaced stops. Community Transit route 101 runs from Aurora Village Transit Center to the Everett city limit at Airport Road Station, and Everett Transit routes 7 and 8 run on the Swift corridor within Everett.[3]:35–50[20] There are several intersecting routes that connect Swift to Sound Transit Express service on Interstate 5 in Lynnwood: three routes on 200th Street near Crossroads and Heron stations travel east to Lynnwood Transit Center;[11] and two routes on 148th Street travel to Ash Way Park and Ride.[21][22] Swift's termini also connect to regional services that run south to Seattle: Everett Station has Sounder commuter rail and Sound Transit Express bus routes to Seattle, and Aurora Village Transit Center is the terminus for the RapidRide E Line, a bus rapid transit route on Aurora Avenue that runs through Shoreline to Downtown Seattle.[13][14][23]

List of stations

Station ID[16]:4–5[24] Location City Connections[14][25] Opened References
Everett Station 2837, 2838 3201 Smith Avenue Everett Amtrak, Sounder commuter rail, ST Express, Community Transit, Everett Transit November 29, 2009 [4]
Colby Avenue/Wetmore Avenue 2835, 2836 Pacific Avenue & Colby/Wetmore avenues Everett Community Transit, Everett Transit November 29, 2009 [4]
40th Street/41st Street 2819, 2820 Evergreen Way & 40th/41st streets Everett Everett Transit routes 3, 7 and 18 November 29, 2009 [4]
50th Street 2815, 2816 Evergreen Way & 50th Street Everett Everett Transit route 7 November 29, 2009 [26]
Madison Street/Pecks Drive 2807, 2810 Evergreen Way & Madison Street/Pecks Drive Everett Everett Transit routes 7 and 8 December 21, 2010 (Northbound)[27]
January 25, 2011 (Southbound)[28]
Casino Road 2795, 2796 Evergreen Way & Casino Road Everett Everett Transit routes 3, 7, 8 and 12 November 29, 2009 [5]
4th Avenue 2787, 2788 Evergreen Way & 4th Avenue Everett Everett Transit routes 7 and 8 November 29, 2009 [5]
112th Street 2783, 2784 State Route 99 & 112th Street Everett Everett Transit routes 2 and 8 January 4, 2011 (Northbound)[29]
January 25, 2011 (Southbound)[28]
Airport Road 2781, 2782 State Route 99 & Airport Road Everett Community Transit route 101, Everett Transit routes 2 and 8 November 29, 2009 [7]
Lincoln Way 2779, 2780 State Route 99 & Lincoln Way Lynnwood Community Transit routes 101 and 417 November 29, 2009 [7]
148th Street 2777, 2778 State Route 99 & 148th Street Lynnwood Community Transit routes 101, 113, 119, 415 and 880 November 29, 2009 [21]
International/Cherry Hill 2767, 2770 State Route 99 & 174th/176th streets Lynnwood Community Transit routes 101 and 112 November 29, 2009 [30]
Crossroads/Heron 2761, 2764 State Route 99 & 196th/200th streets Lynnwood Community Transit routes 101, 115, 116, 120 and 196 November 29, 2009 [11]
College[n 1] 2760 State Route 99 & 204th Street Lynnwood Community Transit routes 101, 115, 116 and 120 February 3, 2016 [31]
Gateway/216th Street 2753, 2754 State Route 99 & 216th Street Edmonds Community Transit routes 101, 119, 405 and 871 November 29, 2009 [11]
238th Street 2747, 2748 State Route 99 & 238th Street Edmonds Community Transit routes 101, 115 and 416 November 29, 2009 [12]
Aurora Village Transit Center 2742, 2877 1524 N 200th Street Shoreline RapidRide E Line, Community Transit, King County Metro November 29, 2009 [12]
     Timepoint or terminus[14]  ·       Future station
Notes
  1. College Station (204th Street) is a southbound-only station with no matching northbound station.[31]

Service

Swift BRT frequency[14]
Type Frequency Span of service
Days Times
Weekdays 12 minutes Monday–Friday 6:00 a.m.  7:00 pm
Mornings 20 minutes Monday–Friday 5:00 a.m.  6:00 am
Evenings 20 minutes Monday–Friday 7:00 p.m.  10:00 pm
Saturday 20 minutes Saturday 6:00 a.m.  10:00 pm
Sunday 20 minutes Sunday 7:00 a.m.  8:20 pm

Swift runs at a headway of 12 minutes from 6:00 a.m. to 7:00 pm on weekdays, its highest level of service with five buses per hour per direction. Weekday service begins with a headway of 20 minutes from 5:00 a.m. to 6:00 am, and ends with the same frequency during the evening from 7:00 p.m. to 10:00 pm. During Saturdays, buses run every 20 minutes from 6:00 a.m. to 10:00 pm. Sunday service, which was suspended from 2010 until 2015,[32][33] runs from 7:00 a.m. to 8:20 pm every 20 minutes.[9][14] Swift initially ran at a 10-minute headway, and had evening service end at midnight, until a major system-wide service reduction in February 2012 reduced its weekday headway to the current 12 minutes.[34][35]

Swift carried a total of 1,557,404 riders in 2014, making it the most popular route operated by Community Transit, and accounting for 16% of the agency's total ridership.[1]:37

Fares and enforcement

Swift BRT fares
Type Fare
Adult $2.25
Youth $1.50
Reduced $1.00
As of July 1, 2015[36]

Fares on Swift are equivalent to Community Transit's local service fares, divided into three groups: adult at $2.25, youth at $1.50, and reduced at $1.00. Adult fare is charged for passengers between the ages of 19 and 64, youth fare is charged for passengers between the ages of 6 and 18, and the reduced fare is charged for passengers over the age of 65, or those with disabilities or Medicare card holders.[36][37] At the time of Swift's launch in 2009, adult fares were set at $1.50;[38] since then, fares have since increased to the present $2.25 for adults effective July 1, 2015.[39]

Swift uses off-board payment at its stations, made possible by the placement of two ORCA card readers and two ticket vending machines at each shelter. The ticket vending machines only accept $1 bills (without giving change) and credit cards from Visa and MasterCard, printing out a paper ticket.[40] The system uses proof-of-payment to verify fares, enforced by "Swift Ambassadors", who conduct random checks and can issue a $124 citation to riders who fail to pay.[41]

Fleet

A Swift bus deadheading to Everett Station to begin its route

Swift uses a fleet of 15 specially-branded New Flyer DE60LFA articulated hybrid buses,[42] measuring 62 feet (19 m) long and carrying 43 seated passengers and up to 80 standing passengers.[43][44] The buses, ordered in 2007 with the option of purchasing 34 additional coaches,[45] have three doors (of which two are plug doors)[35] that allow for all-door boarding at all stations; the front door has a wheelchair ramp, and is located closest to the two wheelchair bays secured by a passive restraint system, which doesn't require assistance from the driver; bicyclists are directed to the rear door of the coach, where three interior bike racks are located.[40] The coaches deadhead to and from their overnight storage space at the Merrill Creek bus base in Everett, where a mock station used for driver training was unveiled in May 2009.[46]

History

Former services

Swift bus rapid transit service on the State Route 99 corridor was preceded by decades of transit services traveling through southwestern Snohomish County, which ranged from an interurban railway to local buses. The Seattle–Everett Interurban Railway ran interurban service from 1910 to 1939 along the Pacific Highway, later U.S. Route 99 and State Route 99.[47] During its heyday, the interurban ran at 30-minute headways throughout the day, and only made automatic stops at its terminals in Everett and Seattle.[48][49] The railway was dismantled and later used as right of way for overhead power lines,[50] until it was converted into a rail trail in the 1990s and 2000s, named the Interurban Trail.[51]

Community Transit was founded in 1976 as the public transit agency for Snohomish County,[52] and introduced local service from Everett to Aurora Village via State Route 99 on route 750.[53] Route 750 was later renumbered to route 610,[54] which was later upgraded to 15-minute headways in the 1990s, and itself split into two routes, 100 and 101, in 2003.[55][56] Community Transit route 100 ran during peak hours along the full length of the corridor from Aurora Village to Everett, while route 101 only ran the southern portion of the route to South Everett, with all-day service that required a transfer to Everett Transit to complete trips to downtown Everett.[57]

BAT lanes and BRT studies

Planning for limited-stop bus service, which later evolved into bus rapid transit, began in the 1990s, with proposals to build bus lanes on State Route 99 between 145th Street NE in Shoreline and Casino Road (near State Route 526) in Everett.[58] Sound Transit was established in 1996 as a regional transit authority, and selected the State Route 99 corridor as a route for its express bus system,[59] but later replaced it, before service began, with an express route on Interstate 5 from Everett to Northgate, while leaving SR 99 to Community Transit.[55][60] Sound Transit funded the construction of business access and transit lanes on State Route 99 through Lynnwood from 244th Street to 148th Street in 2002, converting former parking lanes, and widening the highway in some areas, improving existing bus service, and laying the ground for a future bus rapid transit line.[61]

Community Transit's Strategic Planning Group published a recommendation in 2004, calling for bus rapid transit service on the State Route 99 corridor between Everett Station and Aurora Village Transit Center, featuring off-board fare collection, limited stops, and transit signal priority. The route alternatives proposed included express service from Aurora Village to Downtown Seattle via Aurora Avenue North or Interstate 5, as well as express service on Interstate 5 in Everett, if a partnership to share costs with Everett Transit for the Evergreen Way segment was not viable.[62] In December 2005, the CT Board of Directors approved an accelerated planning schedule for a bus rapid transit project, to cost an estimated $15–20 million, and to begin service as the first such system in the Puget Sound region in 2008.[63]

Planning, design and construction

August 2009
April 2014
The Swift terminal at Everett Station before and after completion

Community Transit unveiled detailed plans for its bus rapid transit system, including the "Swift" name and logo, on July 26, 2006. The first line, located on State Route 99 between Everett and Aurora Village, would begin operating in 2008, with 10-minute headways and limited stops. The agency envisioned real-time arrival signs at stations, and transit signal priority, among other improvements over existing bus service.[64][65]

The following year, CT purchased its fleet of 15 hybrid diesel-electric buses from New Flyer, at a cost of $879,028 per vehicle, to be paid for with state and federal subsidies.[66]

Community Transit signed an agreement on December 5, 2007 with Everett Transit, which allowed for Swift to operate within Everett city limits with sales tax revenue from Everett funding stations, and transit signal priority within Everett. In exchange, Everett Transit would be allowed to expand its services into neighboring unincorporated areas that do not have CT service.[67][68]

A groundbreaking ceremony for the first Swift station, located at Airport Road in south Everett, was held on December 3, 2008, and was attended by Community Transit CEO Joyce Eleanor, U.S. Senator Patty Murray, and the mayors of Everett and Marysville.[69] Stations were constructed in two phases: the first consisting of utility relocation and pouring of the concrete shelter pad; the second being the installation of the shelters, beacons, and other amenities beginning in June 2009.[70] The first station to be completed, a training facility at the Merrill Creek bus base, was opened during a media event on May 5, 2009;[46] in September 2009, the first station on the line was completed at 196th Street in Lynnwood.[71]

The project cost a total of $29 million (equivalent to $32 million in 2016[72]), of which $15 million was paid for by grants from the Federal Transit Administration, Washington State Department of Transportation, as well as the partnership with Everett Transit. The grants also paid for the majority of the cost to operate Swift for its first three years of service, estimated at $5 million annually, allowing it to maintain 10-minute headways, while the rest of Community Transit service was reduced in 2010.[32][73]

Launch and additional stations

Swift launched on November 29, 2009 with a ribbon-cutting ceremony at Crossroads Station, and a day of free rides from 4:00 p.m. to midnight.[74] The following day marked the beginning of regular service, with the first runs departing their termini at 5:00 am, and the new service attracted more than 1,500 riders, with end-to-end trips taking 20 minutes less compared to local buses on the same corridor.[75][76][77] Swift debuted as the first bus rapid transit line in the state of Washington, ahead of King County's RapidRide, opening a year later in 2010,[78] and one of the longest lines in the country when it opened.[73]

Existing local service on the State Route 99 was reduced on November 29 to accommodate the introduction of Swift. Community Transit eliminated route 100, a peak only service on the corridor, and reduced weekday headways on route 101 from 15 minutes to 20 minutes.[79] Everett Transit reduced weekday headways on route 9, running from Airport Road Station to the Everett Community College, from 20 minutes to 30 minutes.[80]

The successful launch of Swift, which saw ridership grow to 3,000 daily boardings in its first five months of service, earned Community Transit a Vision 2040 Award from the Puget Sound Regional Council in May 2010.[81] The agency also received two bronze Summit Creative Awards for the launch of Swift, as well as instructional videos on riding Swift that were published on YouTube.[82]

Four infill stations located in Everett were added to Swift in December 2010 and January 2011: a split pair at Madison Street and Pecks Drive, filling a nearly 2-mile-long (3.2 km) gap between Casino Road and 50th Street,[27] and a pair at 112th Street.[28][29] The stations were paid for by $1.6 million in regional mobility grants from the Washington State Department of Transportation to Everett Transit, awarded in May 2009.[46][83]

The final Swift station, College Station at 204th Street SW in Lynnwood, was opened on February 3, 2016. The southbound-only station is without a matching northbound one, serves the Edmonds Community College. It was originally proposed with the rest of the Lynnwood stations, but was delayed while waiting for the City of Lynnwood to extend 204th Street and build a traffic signal at its intersection with State Route 99.[31]

Later developments

Swift stations were given a number of small improvements after the line opened. Curb bumpers were installed in June 2010 to help guide buses closer to the raised platform, and reduce the gap at the door.[17] In 2012, a queue jump signal was installed northbound at the north end of the BAT lanes at 148th Street, allow Swift buses to merge into traffic.[10] Real-time arrival signs debuted at Swift stations in 2013, featuring a countdown to the arrival of the next bus that is estimated using GPS units on coaches.[84][85] In June 2015, the Washington State Department of Transportation removed part of the refuge island at the intersection of State Route 99 and Airport Road to create a through lane exclusively for Swift buses.[86][87]

Bus service on Aurora Avenue North, the continuation of State Route 99 in Shoreline and Seattle, was upgraded to bus rapid transit with the introduction of the RapidRide E Line in February 2014.[88] The line terminates at Aurora Village Transit Center, allowing for transfers to Swift.[13][89]

Future plans

In its draft transit development plan published in 2016, a Community Transit service concept proposed the restoration of 10-minute weekday frequencies on Swift by March 2018.[90]

Community Transit has also proposed extending the current line on State Route 99 through Shoreline to Link Light Rail at NE 185th Street Station when it opens as part of the Lynnwood Link Extension in 2023.[91][92]

Future lines

In 2005, Community Transit approved a long range plan, which extended Swift into a full network, and which comprised the core of Community Transit service on "Transit Emphasis Corridors". The corridors identified served the cities of Everett, Lynnwood, Edmonds, Mill Creek, Bothell, Marysville, and Arlington, using existing arterial streets that already have bus service.[93]

Community Transit announced plans for a second Swift line in November 2013.[94] The 12.5-mile-long (20.1 km) line, tentatively named "Swift II", was created out of two Transit Emphasis Corridors, and would travel from the Boeing Everett Factory to Mill Creek via Airport Road and State Route 527.[1]:55–56 A study, prepared by Parsons Brinckerhoff, and partially funded by the state legislature in 2012, estimated that the project would cost $42–48 million to construct, and attract 3,300 riders when it opened.[95][96] The Federal Transit Administration approved project development in December 2014, a prerequisite to federal grants for capital construction and vehicle acquisition.[97] During the 2015 session of the Washington State Legislature, Community Transit was granted the authority to increase sales taxes to fund operation of Swift II, pending voter approval via a ballot measure;[98] the Washington State Department of Transportation also gave $6.8 million in funding to build the line's northern terminus at Seaway Transit Center.[97] The ballot measure was approved by voters in November 2015, and CT expects the line to open as early as 2018.[97][99]

See also

References

  1. 1 2 3 4 2015–2020 Transit Development Plan (PDF) (Report). Community Transit. May 7, 2015. Retrieved July 3, 2015.
  2. "Swift Schedule: Aurora Village to Everett Swift Station". Community Transit. Archived from the original on May 21, 2015. Retrieved July 3, 2015.
  3. 1 2 "Everett Transit Bus Schedule & Service Guide" (PDF). Everett Transit. February 21, 2016. Archived from the original on March 4, 2016. Retrieved March 4, 2016.
  4. 1 2 3 4 Swift Kiosk Map 1: Downtown Everett (PDF) (Map). Community Transit. 2009. Retrieved July 3, 2015.
  5. 1 2 3 Swift Kiosk Map 3: Casino Road and 4th Avenue (PDF) (Map). Community Transit. 2009. Retrieved July 3, 2015.
  6. "2nd Line of Swift BRT". Community Transit. 2015. Retrieved July 3, 2015.
  7. 1 2 3 Swift Kiosk Map 4: Airport Road and Lincoln Way (PDF) (Map). Community Transit. 2009. Retrieved July 3, 2015.
  8. Sheets, Bill (May 27, 2011). "No right-turn lanes in Everett on Highway 99, yet". The Everett Herald. Retrieved July 3, 2015.
  9. 1 2 3 "About Swift". Community Transit. Retrieved July 3, 2015.
  10. 1 2 "Queue Jump Light Gives Swift a Head Start on Hwy 99" (Press release). Everett, Washington: Community Transit. November 5, 2012. Retrieved July 3, 2015.
  11. 1 2 3 4 Swift Kiosk Map 7: Crossroads/Heron and Gateway/216th Street (PDF) (Map). Community Transit. 2009. Retrieved July 3, 2015.
  12. 1 2 3 Swift Kiosk Map 8: 238th Street and Aurora Village Transit Center (PDF) (Map). Community Transit. 2009. Retrieved July 3, 2015.
  13. 1 2 3 "Aurora Village Transit Center Boarding Locations". King County Metro. Retrieved July 3, 2015.
  14. 1 2 3 4 5 6 "Swift bus rapid transit" (PDF) (Map). Community Transit Bus Plus: Schedules & Route Maps (PDF). Community Transit. March 2016. p. 47. Retrieved March 4, 2016.
  15. Google (March 4, 2016). "Swift bus rapid transit" (Map). Google Maps. Google. Retrieved March 4, 2016.
  16. 1 2 3 4 Otak (May 27, 2008). Swift Bus Rapid Transit Project SEPA Environmental Checklist (PDF) (Report). Community Transit. Retrieved July 3, 2015.
  17. 1 2 3 "Swift Stations Will Get Curb Bumpers" (Press release). Everett, Washington: Community Transit. June 21, 2010. Retrieved July 3, 2015.
  18. "Board of Directors' Public Hearing and Meeting Minutes, July 3, 2008" (DOC). Community Transit. July 3, 2008. Retrieved July 9, 2015. Councilmember Deanna Dawson moved to approve this off-board fare collection strategy for the Swift BRT stations and authorize the CEO to purchase 62 ticket vending machines, supplies, spares, and management system, with contingency and taxes not-to-exceed $1,175,860, using the City of Seattle contract with Parkeon. Councilmember Michelle Angrick seconded the motion and it carried unanimously.
  19. "Swift Bus Rapid Transit Turns 5!" (Press release). Everett, Washington: Community Transit. December 1, 2014. Retrieved July 13, 2015.
  20. "Route 101: Aurora Village to Mariner Park & Ride". Community Transit. June 7, 2015. Retrieved July 8, 2015.
  21. 1 2 Swift Kiosk Map 5: Lincoln Way and 148th Street (PDF) (Map). Community Transit. 2009. Retrieved July 8, 2015.
  22. Community Transit System Map: Snohomish County (PDF) (Map). Community Transit. June 2015. Retrieved July 8, 2015.
  23. "RapidRide E Line overview". King County Metro. Retrieved July 8, 2015.
  24. "Bus Stop List: Swift". Community Transit. June 7, 2015. Retrieved July 8, 2015.
  25. Everett Transit System Map (PDF) (Map). Everett Transit. August 23, 2015. Retrieved March 5, 2016.
  26. Swift Kiosk Map 2: 40th/41st Street and 50th Street (PDF) (Map). Community Transit. 2009. Retrieved July 9, 2015.
  27. 1 2 "New Swift Bus Rapid Transit Station Opens Dec. 21" (Press release). Everett, Washington: Community Transit. December 14, 2010. Retrieved July 8, 2015.
  28. 1 2 3 "Final Two Swift Stations Open Jan. 25" (Press release). Everett, Washington: Community Transit. January 24, 2011. Retrieved July 8, 2015.
  29. 1 2 "New Northbound 112th St. Swift Station Opens Jan. 4" (Press release). Everett, Washington: Community Transit. January 3, 2011. Retrieved July 8, 2015.
  30. Swift Kiosk Map 6: International/Cherry Hill and Crossroads/Heron (PDF) (Map). Community Transit. 2009. Retrieved July 9, 2015.
  31. 1 2 3 "Swift College Station Opens Near Edmonds Community College" (Press release). Everett, Washington: Community Transit. February 3, 2016. Retrieved February 3, 2016.
  32. 1 2 "Agency Prepares for Sunday Service Suspension, Other Cuts, Effective June 13" (Press release). Everett, Washington: Community Transit. May 27, 2010. Retrieved July 8, 2015.
  33. "June 2015 Service Expansion & Fare Increase". Community Transit. June 7, 2015. Archived from the original on September 8, 2015. Retrieved July 8, 2015.
  34. "Major Service Changes Start Feb. 20". Community Transit. February 2012. Archived from the original on February 17, 2012. Retrieved July 9, 2015.
  35. 1 2 "Community Transit to launch hybrid BRT service". Metro Magazine. November 10, 2009. Retrieved July 9, 2015.
  36. 1 2 "Fares & Passes". Community Transit. July 1, 2015. Retrieved July 11, 2015.
  37. "Reduced Fare Permit: Senior 65+, Disabled, Medicare". Community Transit. Retrieved March 4, 2016.
  38. "Fare Increase June 1; Memorial Day on Sunday Schedule" (Press release). Everett, Washington: Community Transit. May 17, 2010. Retrieved March 4, 2016.
  39. "Adult Bus Fares, DART Fares Go Up 25 Cents" (Press release). Everett, Washington: Community Transit. June 30, 2015. Retrieved July 11, 2015.
  40. 1 2 "How to Ride Swift". Community Transit. Retrieved July 9, 2015.
  41. "Agency Emphasizes Fare Enforcement" (Press release). Everett, Washington: Community Transit. September 28, 2011. Retrieved July 11, 2015.
  42. Snohomish County Public Transportation Benefit Area Corporation (April 29, 2011). "ITB #03-11: Supply and Delivery of Bus Parts" (PDF). Community Transit. p. 14. Retrieved July 9, 2015.
  43. "Swift bus rapid transit". Community Transit. Archived from the original on February 25, 2012. Retrieved July 3, 2015.
  44. Kinnamon, Kristin (April 15, 2010). "Does Size Matter?". Community Transit Blog (Community Transit). Retrieved July 8, 2015.
  45. "New Flyer Announces Recent Bus Orders for 1,180 Buses Valued at Over US$624 Million" (Press release). Winnipeg, Manitoba: New Flyer Industries Inc. October 22, 2007. Retrieved July 9, 2015.
  46. 1 2 3 "First Look at Swift Bus Rapid Transit" (Press release). Everett, Washington: Community Transit. May 5, 2009. Retrieved July 9, 2015.
  47. Crowley, Walt (March 2, 2003). "Interurban rail service between Everett and Seattle begins on April 30, 1910.". HistoryLink. Retrieved July 18, 2015.
  48. Bird, Frederick (May 2000). "The Seattle-Everett Interurban Railway, 1910–1939" (PDF). Snohomish County. Retrieved July 18, 2015.
  49. Moriarty, Leslie (July 31, 1997). "Ex-motorman recalls the age of the trolley". The Everett Herald.
  50. "Interurban Trail". City of Lynnwood. Retrieved March 4, 2016.
  51. Lobos, Ignacio (September 9, 1994). "Lynnwood First To Finish Portion Of Interurban Trail – City To Unveil Link In Bicycle, Pedestrian Path Running From Everett To Seattle". The Seattle Times. Retrieved July 18, 2015.
  52. "Community Transit Marks 35th Anniversary" (Press release). Everett, Washington: Community Transit. October 3, 2011. Retrieved March 4, 2016.
  53. Aerodrome Press & Maps To Go (November 1988). "Community Transit SW Snohomish County Routes" (Map). Metro Transit Map. King County Metro. Retrieved July 18, 2015 via Flickr.
  54. Murakami, Kery (February 3, 2002). "Community Transit up to speed". Seattle Post-Intelligencer (Hearst Corporation). Retrieved July 18, 2015.
  55. 1 2 Manuel Padron and Associates (October 1998). "XI. Regional Express Bus Route Summary". Sound Transit Regional Express Bus System Implementation Plan (PDF) (Report). Sound Transit. p. 20. Retrieved July 18, 2015.
  56. "Bus-service expansion OK'd; Alderwood Mall to see boost". The Seattle Times. November 13, 2002. Retrieved July 18, 2015.
  57. "Route 100/101: Aurora Village / Mariner P&R or Everett Station". Community Transit. June 2009. Archived from the original on November 27, 2009. Retrieved March 4, 2016.
  58. Bergsman, Jerry (July 27, 1990). "Bus Lanes Considered For Highway 99". The Seattle Times. Retrieved July 18, 2015.
  59. "Sound Move: Launching a Rapid Transit System for the Puget Sound Region" (PDF). Sound Transit. May 31, 1996. pp. 16–17. Retrieved July 18, 2015.
  60. Schaefer, David (November 9, 1998). "Sound Transit Picking Up Speed – Three-County Web Of Express-Bus Routes Nears Approval". The Seattle Times. Retrieved July 18, 2015.
  61. "Lynnwood State Route 99 Transit Lanes Project". Sound Transit. October 31, 2003. Archived from the original on December 13, 2003. Retrieved July 18, 2015.
  62. Community Transit Strategic Planning Group (April 1, 2004). "Section 8: We've Only Just Begun". Transit First: Transit Development Plan, 2004–2009 (PDF) (Report). Community Transit. pp. 82–90. Retrieved July 18, 2015.
  63. "Agency to Launch Region's First Bus Rapid Transit System" (Press release). Everett, Washington: Community Transit. December 1, 2005. Retrieved July 18, 2015.
  64. "New Bus Rapid Transit Route Called "Swift"" (Press release). Everett, Washington: Community Transit. July 26, 2006. Retrieved July 18, 2015.
  65. Alexander, Bryan (August 2, 2006). "Community Transit plans rapid bus service along 99". The Seattle Times. Retrieved July 18, 2015.
  66. "Agency Chooses Hybrid Buses for Swift" (Press release). Everett, Washington: Community Transit. October 4, 2007. Retrieved July 18, 2015.
  67. "Community Transit, Everett Transit Become Partners" (Press release). Everett, Washington: Community Transit. December 5, 2007. Retrieved July 18, 2015.
  68. Brooks, Diane (December 12, 2007). "Community Transit, Everett form 17-mile partnership". The Seattle Times. Retrieved July 18, 2015.
  69. "Construction Begins on Swift Bus Rapid Transit" (Press release). Everett, Washington: Community Transit. December 3, 2008. Retrieved July 18, 2015.
  70. "First Swift Shelter Being Constructed at 196th St. Southbound" (PDF). Swift Messenger (14) (Community Transit). June 24, 2009. Retrieved July 18, 2015.
  71. "First Swift Station Completed" (Press release). Everett, Washington: Community Transit. September 22, 2009. Retrieved July 18, 2015.
  72. "Consumer Price Index (estimate) 1800–". Federal Reserve Bank of Minneapolis. Retrieved November 10, 2015.
  73. 1 2 Gutierrez, Scott (November 25, 2009). "Community Transit debuts 'Swift' line". Seattle Post-Intelligencer (Hearst Corporation). Retrieved November 26, 2009.
  74. "Swift Bus Rapid Transit to Fly on Nov. 29" (Press release). Everett, Washington: Community Transit. November 16, 2009. Retrieved July 20, 2015.
  75. Lindblom, Mike (November 30, 2009). "Bus rapid transit launches today from Everett to Shoreline". The Seattle Times. Retrieved July 20, 2015.
  76. "Riders See Time Savings on Swift" (Press release). Everett, Washington: Community Transit. December 2, 2009. Retrieved July 20, 2015.
  77. Sheets, Bill (December 12, 2009). "Early raves roll in from first Swift bus riders". The Everett Herald (The Washington Post Company). Retrieved November 26, 2009.
  78. "Metro’s new RapidRide "A" Line to connect Tukwila and Federal Way launches Oct. 2" (Press release). King County Metro. October 1, 2010. Retrieved November 25, 2015.
  79. "Service Changes Include Swift, Other Route Adjustments" (Press release). Everett, Washington: Community Transit. November 16, 2009. Retrieved July 20, 2015.
  80. Sheets, Bill (November 21, 2009). "Everett Transit reorganizing bus routes for new Swift service starting late November". The Everett Herald (The Washington Post Company). Retrieved July 20, 2015.
  81. "Congratulations 2010 VISION 2040 Award Winners". Puget Sound Regional Council. 2010. Retrieved July 20, 2015.
  82. "Swift Earns Vision 2040 Award" (Press release). Everett, Washington: Community Transit. May 24, 2010. Retrieved July 20, 2015.
  83. Sheets, Bill (December 21, 2010). "New Everett Swift bus stop opens". The Everett Herald (The Washington Post Company). Retrieved July 21, 2015.
  84. Munguia, Martin (September 5, 2013). "Next Bus Signs Live on Swift!". Community Transit Blog (Community Transit). Retrieved July 21, 2015.
  85. "Transit Technologies Project Launched" (Press release). Everett, Washington: Community Transit. October 23, 2012. Retrieved July 21, 2015.
  86. "SR 99 – Airport Rd. Intersection Transit Queue Bypass Safety Improvements". Washington State Department of Transportation. July 2015. Retrieved July 21, 2015.
  87. Slager, Melissa (April 9, 2015). "New bus lane to ease flow on Highway 99 at Airport Road". The Everett Herald (Sound Publishing). Retrieved July 21, 2015.
  88. "Metro’s RapidRide E Line debuts Feb. 15" (Press release). Seattle, Washington: King County Metro. February 10, 2014. Retrieved July 21, 2015.
  89. Lindblom, Mike (February 15, 2014). "Aurora Avenue North bus now RapidRide". The Seattle Times. Retrieved July 21, 2015.
  90. "Chapter 9: Service Plan". 2016–2021 Draft Transit Development Plan (PDF) (Report). Community Transit. March 3, 2016. p. 57. Retrieved March 5, 2016.
  91. "Existing Conditions and Population Forecasts". 185th Street Station Subarea Plan (PDF) (Report). City of Shoreline. March 2015. p. 3-21. Retrieved July 21, 2015.
  92. "Chapter 5.2.2: Long Term Impacts on Local and Sub-Regional Bus Transit". Lynnwood Link Final Environmental Impact Statement: Transportation Technical Report (PDF) (Report). Sound Transit. April 2015. p. 5-29. Retrieved July 21, 2015.
  93. "Chapter 2: Transit Emphasis Corridors". Community Transit Long Range Transit Plan: Thinking Transit First (PDF) (Report). Community Transit. February 4, 2011. pp. 9–13. Retrieved July 21, 2015.
  94. Munguia, Martin (November 8, 2013). "Special session: Don't forget Community Transit". Community Transit Blog (Community Transit). Retrieved July 21, 2015.
  95. Parsons Brinckerhoff (August 2014). "Executive Summary". Community Transit BRT Corridor Planning and Route Definition Study: Boeing to Canyon Park (PDF) (Report). Community Transit. p. 1-5. Retrieved July 21, 2015.
  96. "Swift Bus Rapid Transit Turns 5!" (Press release). Everett, Washington: Community Transit. December 1, 2014. Retrieved July 21, 2015.
  97. 1 2 3 "FTA Approves Project Development for Swift II" (Press release). Everett, Washington: Community Transit. December 23, 2014. Retrieved July 21, 2015.
  98. "Community Transit Board Sends Sales Tax Measure to November Ballot" (Press release). Everett, Washington: Community Transit. July 16, 2015. Retrieved July 21, 2015.
  99. "CEO Outlines "New Transit Legacy" for Snohomish County" (Press release). Everett, Washington: Community Transit. November 10, 2015. Retrieved November 25, 2015.

External links

Wikimedia Commons has media related to Swift Bus Rapid Transit.

Route map: Bing / Google

This article is issued from Wikipedia - version of the Thursday, May 05, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.