Tambar oil field

Tambar

Location of Tambar

Country Norway
Region South North Sea
Block 1/3, 2/1
Offshore/onshore Offshore
Coordinates 56°58′57.92″N 2°57′31.61″E / 56.9827556°N 2.9587806°E / 56.9827556; 2.9587806Coordinates: 56°58′57.92″N 2°57′31.61″E / 56.9827556°N 2.9587806°E / 56.9827556; 2.9587806
Operator BP Norge AS
Partners BP Norge AS (55%)
Dong Norge AS (45%)
Field history
Discovery 1983
Start of production July 2001
Abandonment 2021
Production
Current production of oil 8,800 barrels per day (~4.4×10^5 t/a)
Estimated oil in place 295 million barrels (~4.02×10^7 t)
Producing formations Upper Jurassic Ula Formation

Tambar (Norwegian: Tambarfeltet) is an offshore oil field located in the southern Norwegian section of North Sea along with Ula and Gyda fields making up the UGT area, usually attributed to DONG Energy's main areas of exploration and production activity.[1] The Ula field was discovered in 1983 and came online in 2001.[2] Tambar was discovered in 1983 and became operational in July 2001. It contains confirmed 46.9 million m3 of oil.[3]

Ownership

BP is the operator of the field with 55% of interest in the project. BP's partner DONG Energy holds 45% of interest.[3]

Production

The sea depth at Tambar is approximately 68 m (223 ft). The main reservoir stands at 4,200 m (13,800 ft) in the Upper Jurassic Ula Formation.[2] Tambar has 4 production wells and 6 slots. The field has one unmanned wellhead facility without the processing equipment. It is remotely controlled from the facility at the Ula field which is located 16 km (9.9 mi) southeast of Tambar. However, the facility does have conditions to accommodate 12 people. Current production at Tambar field is 8,800 barrels per day (1,400 m3/d). Gas injection is used at Tambar and the produced oil is pumped to Ula facilities via Tambar-Ula pipeline which came online in 2007 and is then transported by a pipeline to Ekofisk oil field and on to Teesside for refining.[3] The gas produced at Tambar field is injected into Ula field to increase oil production.[4] The field is expected to produce until 2021.[3]

Tambar WHP Platform

Tambar WHP Platform was designed by Aker Solutions Engineering in 2000-2001.


Tambar Øst

Tambar Øst (East) is located just a few kilometers away from Tambar. It was discovered in 2007 and lies 4,200 m (13,800 ft) deep in the Late Jurassic Formation. It has been developed with a production well from Tambar's main facility. Production started on October 2, 2007. The produced oil is pumped to Tambar and then onto Ula field.[5]

Ownership

Tambar Øst is also operated by BP. BP holds 46.2%, while DONG Energyholds 43.24%, Talisman Energy - 9.76%, Norske AEDC AS (NAEDC) - 0.8%.[5][6]