Tangerang–Merak Toll Road

Coordinates: 06°10′56.84″S 106°47′35.01″E / 6.1824556°S 106.7930583°E / -6.1824556; 106.7930583

Tangerang-Merak Toll Road
Banten Highway
Route information
Maintained by PT Marga Mandala Sakti, a subsidiary of PT. Astratel Nusantara (an Astra Int'l company)
Length: 72 km (45 mi)
Major junctions
East end: Cikupa IC
  Jakarta-Tangerang Toll Road
Jakarta Outer Ring Road 2
Serpong-Balaraja Toll Road (Planned)
West end: Merak
Location
Major cities: Tangerang Regency, Lebak Regency, Serang, Cilegon
Highway system
Roads and Highways in Indonesia

The Tangerang–Merak Toll Road () - also known as the Banten highway - as a part of Trans-Java toll road is the second toll road to have been constructed in Indonesia, following the Jagorawi Toll Road in 1981. This highway connects Tangerang and the port of Merak on the north-western tip of Java, which further connects by ferry to Sumatra island. The road passes through Cikupa, Balaraja, Kragilan, Ciujung, Serang, Cilegon, and Merak.

Further investment is underway. In mid-2012 the toll road operator, PT Marga Mandala Sakti, recently acquired by Astra International Tbk, said that construction of all parts of the road to connect with the port of Merak was almost complete.[1]

Payment

The fee for this road can be paid cash or using e-toll

Fee

Route Gol. 1 Gol. 2 Gol. 3 Gol. 4 Gol. 5
Cikupa - Cikupa
Serang Timur - Serang Barat
2,50 4,00 4,50 6,00 7,00
Cilegon Timur - Cilegon Barat 4,00 5,50 6,50 8,50 10,50
Serang Barat - Cilegon Timur 5,00 6,50 8,00 10,50 12,50
Cikupa - Balaraja Timur 5,00 7,00 8,50 11,00 13,00
Cilegon Timur - Merak 5,50 8,00 9,50 12,50 15,00
Ciujung - Serang Timur 6,00 8,50 10,00 13,00 16,00
Cikupa - Balaraja Barat 6,50 9,00 10,50 14,00 16,50
Serang Timur - Cilegon Timur 7,50 10,50 12,50 16,50 19,50
Ciujung - Serang Barat
Serang Barat - Cilegon Barat
9,00 12,00 14,50 19,00 23,00
Balaraja Barat - Ciujung 10,50 14,50 17,00 22,50 27,00
Serang Barat - Merak 11,50 14,50 17,50 23,00 27,50
Serang Timur - Cilegon Barat 11,50 16,00 19,00 25,00 30,00
Serang Timur - Merak 13,00 18,50 21,50 28,50 34,50
Ciujung - Cilegon Timur 13,50 19,00 22,50 29,50 35,50
Balaraja Barat - Serang Timur 16,50 23,00 27,00 35,50 43,00
Cikupa - Ciujung 16,50 23,00 27,50 36,00 43,50
Ciujung - Cilegon Barat 17,50 24,50 29,00 38,00 46,00
Balaraja Barat - Serang Barat 19,00 26,50 31,50 41,50 50,00
Ciujung - Merak 19,50 27,00 32,00 42,00 50,50
Cikupa - Serang Timur 23,00 31,50 37,50 49,50 59,50
Balaraja Barat - Cilegon Timur 24,00 33,50 39,50 52,00 62,50
Cikupa - Serang Barat 25,00 35,50 42,00 55,00 66,50
Balaraja Barat - Cilegon Barat 28,00 38,50 46,00 60,50 73,00
Balaraja Barat - Merak 29,50 41,00 49,00 64,00 77,50
Cikupa - Cilegon Timur 30,50 42,00 50,00 65,50 79,00
Cikupa - Cilegon Barat 34,50 47,50 56,50 74,50 89,50
Cikupa - Merak 36,00 50,00 59,50 78,00 94,00

Exits

Toll Gate KM Destination
Cikupa31Cikupa, Pasar Kemis
Balaraja Timur36Balaraja Timur, Cikupa, Tigaraksa
Balaraja Barat38Balaraja Barat, Rangkasbitung, Serpong-Balaraja Toll Road (planned)
Cikande (planned) 52Cikande, Industrial Site (Planned)
Ciujung60Ciujung, Kragilan
Serang Timur72Serang Timur, Banten Lama, Pandeglang
Serang Barat78Serang Barat, Kramatwatu
Cilegon Timur87Cilegon Timur, Bojonegara
Cilegon Barat95Cilegon Barat, Anyer, Carita
Merak98Merak Harbour

Elevated toll road section

To overcome floods of Ciujung River in kilometer 57 to 59 which happened in 2012 and 2013, the operator has planned to elevated the toll road certain section by 2.7 meter height above the existing toll road with prediction cost Rp.300 billion ($25 million) for 2.5 kilometer elevated toll road as Prof. Dr. Sedyatmo Toll Road (Soekarno-Hatta Toll Road).[2]

See also

References

External links