Tangerang–Merak Toll Road
Coordinates: 06°10′56.84″S 106°47′35.01″E / 6.1824556°S 106.7930583°E
Tangerang-Merak Toll Road | |
---|---|
Banten Highway | |
Route information | |
Maintained by PT Marga Mandala Sakti, a subsidiary of PT. Astratel Nusantara (an Astra Int'l company) | |
Length: | 72 km (45 mi) |
Major junctions | |
East end: | Cikupa IC |
Jakarta-Tangerang Toll Road Jakarta Outer Ring Road 2 Serpong-Balaraja Toll Road (Planned) | |
West end: | Merak |
Location | |
Major cities: | Tangerang Regency, Lebak Regency, Serang, Cilegon |
Highway system | |
Roads and Highways in Indonesia |
The Tangerang–Merak Toll Road () - also known as the Banten highway - as a part of Trans-Java toll road is the second toll road to have been constructed in Indonesia, following the Jagorawi Toll Road in 1981. This highway connects Tangerang and the port of Merak on the north-western tip of Java, which further connects by ferry to Sumatra island. The road passes through Cikupa, Balaraja, Kragilan, Ciujung, Serang, Cilegon, and Merak.
Further investment is underway. In mid-2012 the toll road operator, PT Marga Mandala Sakti, recently acquired by Astra International Tbk, said that construction of all parts of the road to connect with the port of Merak was almost complete.[1]
Payment
The fee for this road can be paid cash or using e-toll
Fee
Route | Gol. 1 | Gol. 2 | Gol. 3 | Gol. 4 | Gol. 5 |
---|---|---|---|---|---|
Cikupa - Cikupa Serang Timur - Serang Barat | 2,50 | 4,00 | 4,50 | 6,00 | 7,00 |
Cilegon Timur - Cilegon Barat | 4,00 | 5,50 | 6,50 | 8,50 | 10,50 |
Serang Barat - Cilegon Timur | 5,00 | 6,50 | 8,00 | 10,50 | 12,50 |
Cikupa - Balaraja Timur | 5,00 | 7,00 | 8,50 | 11,00 | 13,00 |
Cilegon Timur - Merak | 5,50 | 8,00 | 9,50 | 12,50 | 15,00 |
Ciujung - Serang Timur | 6,00 | 8,50 | 10,00 | 13,00 | 16,00 |
Cikupa - Balaraja Barat | 6,50 | 9,00 | 10,50 | 14,00 | 16,50 |
Serang Timur - Cilegon Timur | 7,50 | 10,50 | 12,50 | 16,50 | 19,50 |
Ciujung - Serang Barat Serang Barat - Cilegon Barat | 9,00 | 12,00 | 14,50 | 19,00 | 23,00 |
Balaraja Barat - Ciujung | 10,50 | 14,50 | 17,00 | 22,50 | 27,00 |
Serang Barat - Merak | 11,50 | 14,50 | 17,50 | 23,00 | 27,50 |
Serang Timur - Cilegon Barat | 11,50 | 16,00 | 19,00 | 25,00 | 30,00 |
Serang Timur - Merak | 13,00 | 18,50 | 21,50 | 28,50 | 34,50 |
Ciujung - Cilegon Timur | 13,50 | 19,00 | 22,50 | 29,50 | 35,50 |
Balaraja Barat - Serang Timur | 16,50 | 23,00 | 27,00 | 35,50 | 43,00 |
Cikupa - Ciujung | 16,50 | 23,00 | 27,50 | 36,00 | 43,50 |
Ciujung - Cilegon Barat | 17,50 | 24,50 | 29,00 | 38,00 | 46,00 |
Balaraja Barat - Serang Barat | 19,00 | 26,50 | 31,50 | 41,50 | 50,00 |
Ciujung - Merak | 19,50 | 27,00 | 32,00 | 42,00 | 50,50 |
Cikupa - Serang Timur | 23,00 | 31,50 | 37,50 | 49,50 | 59,50 |
Balaraja Barat - Cilegon Timur | 24,00 | 33,50 | 39,50 | 52,00 | 62,50 |
Cikupa - Serang Barat | 25,00 | 35,50 | 42,00 | 55,00 | 66,50 |
Balaraja Barat - Cilegon Barat | 28,00 | 38,50 | 46,00 | 60,50 | 73,00 |
Balaraja Barat - Merak | 29,50 | 41,00 | 49,00 | 64,00 | 77,50 |
Cikupa - Cilegon Timur | 30,50 | 42,00 | 50,00 | 65,50 | 79,00 |
Cikupa - Cilegon Barat | 34,50 | 47,50 | 56,50 | 74,50 | 89,50 |
Cikupa - Merak | 36,00 | 50,00 | 59,50 | 78,00 | 94,00 |
Exits
Toll Gate | KM | Destination |
---|---|---|
Cikupa | 31 | Cikupa, Pasar Kemis |
Balaraja Timur | 36 | Balaraja Timur, Cikupa, Tigaraksa |
Balaraja Barat | 38 | Balaraja Barat, Rangkasbitung, Serpong-Balaraja Toll Road (planned) |
Cikande (planned) | 52 | Cikande, Industrial Site (Planned) |
Ciujung | 60 | Ciujung, Kragilan |
Serang Timur | 72 | Serang Timur, Banten Lama, Pandeglang |
Serang Barat | 78 | Serang Barat, Kramatwatu |
Cilegon Timur | 87 | Cilegon Timur, Bojonegara |
Cilegon Barat | 95 | Cilegon Barat, Anyer, Carita |
Merak | 98 | Merak Harbour |
Elevated toll road section
To overcome floods of Ciujung River in kilometer 57 to 59 which happened in 2012 and 2013, the operator has planned to elevated the toll road certain section by 2.7 meter height above the existing toll road with prediction cost Rp.300 billion ($25 million) for 2.5 kilometer elevated toll road as Prof. Dr. Sedyatmo Toll Road (Soekarno-Hatta Toll Road).[2]
See also
References
- ↑ 'Tengerang-Merak toll road nears completion.', The Jakarta Post, 16 June 2012.
- ↑ "Merak toll road to get new, elevated section". March 26, 2014.
External links
|