Tennessee State Route 107

State Route 107 primary marker State Route 107 secondary marker

State Route 107
Route information
Length: 78.77 mi (126.77 km)
Major junctions
West end: Round Mountain Road south of Del Rio
  US 25 / US 70 in Del Rio
US 11E / US 321 in Tusculum
I-26 / US 19W in Erwin
East end: NC 226 east of Unicoi
Location
Counties: Cocke, Greene, Washington, Unicoi
Highway system

State Route 107 (SR 107) is a 78.77-mile (126.77 km) state highway in eastern Tennessee, United States. It begins at an intersection with Round Mountain Road south of Del Rio and ends at the North Carolina state line east of Unicoi, where it becomes NC 226.

It travels through the incorporated municipalities of Greeneville, Tusculum, Erwin and Unicoi, and the communities of Del Rio, South Greene, Horse Creek, South Central, Lamar, Embreeville and Limestone Cove.

Alternate names

State Route 107 bares the following names:

History

In Greene County, SR-107 formerly went through downtown Tusculum along Erwin Highway, it has since been rerouted along US Route 11E/US Route 321 and the "Tusculum Bypass" a five lane (four lanes and center turn lane) road on the east side of Tusculum, it becomes Erwin Highway on the southeast side of the city. The former alignment is now an Unsigned Business Route.

It Begins on the east side of Greeneville at US-11E / US-321 and travels through downtown Tusculum past Tusculum College and ends at mainline SR-107 on the southeast side of Tusculum.

Beginning in 2010 Improvements were made to 107's intersection with State Route 107 Cutoff just south of the city of Tusculum in Greene County and a traffic signal was installed. The work was completed the following year.[1]

In 2010, the City of Tusculum and the Tennessee Department of Transportation approved improvements to the Tusculum Bypass and Edens Road intersection. The work is said to start in 2014.[2] The work was completed in late September 2014, with added guardrails and flashing beacons.[3]

As of May 21, 2015, SR-107 was rerouted in Erwin from Jonesborough Road to an overpass that bypasses the railroad crossings on that road, in order to increase accessibility to Downtown Erwin.[4]

State Route 107 Cutoff

State Route 107 Cutoff is a portion of Tennessee State Route 351 and a cutoff route of State Route 107.

It begins at Tennessee State Routes 70 and 107 in the South Greene community and goes northeasterly and junctions with Tennessee State Route 350 about halfway through. It continues northeasterly to State Route 107 and ends.

Junction list

CountyLocationmikmDestinationsNotes
Cocke 00Round Mountain Road and Ground Squirrel RoadWestern terminus
Del Rio US 25 north / US 70 west / SR 9 north NewportWestern end of US-25/US-70/SR-9 concurrency
US 25 south / US 70 east / SR 9 south Hot SpringsEastern end of US-25/US-70/SR-9 overlap
GreeneSouth Greene SR 70 south (Asheville Highway) Marshall, AshevilleWestern end of SR-70 overlap
SR 351 north (SR-107 Cutoff) Erwin, TusculumSouthern terminus of SR-351
Greeneville US 321 south / SR 35 south (West Main Street) / SR 70 north (70 Bypass) Newport, MorristownEastern end of overlap with SR-70; Western end of overlap with US-321/SR-35
SR 350 south (East McKee Street) Camp CreekWestern end of overlap with SR-350

US 11E Bus. south / SR 350 north (West Summer Street) Mosheim, Morristown
Eastern end of overlap with SR-350; Western end of overlap with US-11E Business
US 321 north / SR 35 north (North Main Street)Eastern end of first overlap with US-321; Eastern end of overlap with SR-35
US 11E / US 321 / SR 34 (East Andrew Johnson Highway) Morristown, MosheimNorthern terminus of and end overlap with US-11E Business, Western end of overlap with US-11E/US-321/SR-34
Erwin Highway – Tusculum, Tusculum CollegeFormer SR-107
Tusculum US 11E north / US 321 north / SR 34 north (East Andrew Johnson Highway) Limestone, Jonesborough, Johnson CityEastern end of overlap with US-11E/321/SR-34
Erwin Highway – Tusculum, Tusculum CollegeFormer SR-107; At this intersection SR-107 becomes Erwin Highway
SR 351 south (SR-107 Cutoff) South GreeneWestern end of overlap with SR-351
  SR 351 north (Chuckey Pike) ChuckeyEastern end of overlap with SR-351
WashingtonSouth Central SR 353 north (Bailey Bridge Road) JonesboroughSouthern terminus of SR-353
Lamar SR 81 north Jonesborough, Fall BranchBegin overlap with SR-81
UnicoiErwin I-26 / US 23 / US 19W / SR 36 Johnson City, AshevilleSouthern terminus of SR-81; end overlap with SR-81. I-26/US 19W/US 23 exit 37.
Main Avenue – Downtown ErwinAt this intersection SR 107 becomes Main Avenue
SR 395 east (Rock Creek Road) – Rock CreekNorthern terminus of SR-395
Harris Hollow Road To I-26 / US 23 / US 19W / SR 36 Johnson City, Asheville
Unicoi SR 173 west (Unicoi Drive) Milligan College, Johnson CityWestern end of overlap with SR-173
Limestone Cove SR 173 east (Simerly Creek Road) HamptonEastern of End overlap with SR-173
  NC 226 – Buladean, Burnsville, BakersvilleEastern terminus of SR-107 at North Carolina State-line
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

  1. "Erwin Highway/107 Cutoff Project Progressing". The Greeneville Sun.
  2. "Intersection Upgrades Approved By Tusculum". The Greeneville Sun.
  3. "2 Tusculum Road Projects Are Complete". The Greeneville Sun.
  4. Legg, Sue (22 May 2015). "Traffic finally flows on Erwin's long-awaited railroad overpass". Johnson City Press. Retrieved 27 May 2015.

This article is issued from Wikipedia - version of the Thursday, May 05, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.