Tororo Thermal Power Station

Tororo Thermal Power Station
Location of Tororo Thermal Power Station in Uganda
Country Uganda
Location Tororo
Coordinates 00°38′14″N 34°07′00″E / 0.63722°N 34.11667°E / 0.63722; 34.11667Coordinates: 00°38′14″N 34°07′00″E / 0.63722°N 34.11667°E / 0.63722; 34.11667
Status Operational
Commission date 2010
Owner(s) Electro-Maxx Limited
Thermal power station
Primary fuel heavy fuel oil
Secondary fuel biodiesel
Tertiary fuel crude oil
Power generation
Nameplate capacity 70 megawatts (94,000 hp)

Tororo Thermal Power Station is a 70 megawatts (94,000 hp) heavy fuel oil-fired thermal power plant located in the town of Tororo in Tororo District in the Eastern Region of Uganda.[1]

Location

The power station is located in Tororo, approximately 8 kilometres (5.0 mi) southwest of downtown, along the Tororo–Bugiri road. The station is approximately 230 kilometres (140 mi), by road, east of Kampala, the capital and largest city of Uganda.[2] The coordinates of the station are 0°38'14.0"N, 34°07'00.0"E (Latitude:0.637222; Longitude:34.116667).[3]

Overview

The power station is owned and operated by Electro-Maxx Limited, a private energy provider in Uganda, who built the power plant at an estimated cost of US$60 million.[4] The plant uses heavy fuel oil (HFO), a byproduct of petroleum distillation.[5] The plant currently imports HFO but in the future, it will leverage the country's natural assets and obtain domestically produced HFO or crude oil. The initial power station was fully commissioned in September 2010.[6]

Upgrade

In August 2012, Ugandan print media reported that the power station was in the process of upgrading the plant's capacity to 80 megawatts, at an estimated cost of US$60 million. The upgrade was expected to be complete by September 2012.[7] The actual upgrade, however, was to 70 megawatts. The upgrade was completed in October 2012 and the plant's maximum rated capacity is 70 megawatts (16.4 megawatts from the old plant running Niigata engines and a further 53 megawatts from the new plant with Sulzer engines). Upon commissioning of the plant, Electro-Maxx became the first indigenous independent power producer in Africa for power plants with capacity greater than 20 megawatts.[1]

Operation

The power station resumed operations in February 2014 with consistent dispatch. During 2013, the plant was on standby, producing power only when needed, such as a maintenance issue at a hydropower station. The standby period in 2013 resulted from a temporary high supply versus demand for power following the commissioning of the 250 megawatt Bujagali Power Station. With only twelve percent electrification and large industrial growth, demand is rising consistently, which increases the power required from the station.[8]

See also

References

  1. 1 2 Kasita, Ibrahim (28 November 2012). "Electro-Maxx Switches On US$60 Million Power Plant". New Vision. Kampala. Retrieved 24 December 2014.
  2. "Map Showing Kampala and Tororo with Distance Marker". Globefeed.com. Retrieved 13 July 2014.
  3. Google. "Location of Tororo Thermal Power Station At Google Maps". Google Maps. Retrieved 13 July 2014.
  4. Kasita, Ibrahim (23 June 2009). "Thermal Power Firm Lights Up Tororo". New Vision (Kampala). Archived from the original on December 29, 2014. Retrieved 19 February 2010.
  5. David Ssempijja, and Ibrahim Kasita (21 December 2009). "Tororo Thermal Plant To Be Commissioned In August". New Vision (Kampala). Retrieved 19 February 2010.
  6. Kasita, Ibrahim (29 December 2009). "Electromaxx Tests 20MW Power Plant". New Vision (Kampala). Retrieved 19 February 2010.
  7. Kalyango, Ronald (2 August 2012). "80MW More For The Grid". New Vision (Kampala). Retrieved 13 July 2014.
  8. Muhumuza, Mark Keith (22 January 2014). "Heavy Fuel Electricity Could Return In 2014 As Demand Hits 12%". Uganda Radio Network. Retrieved 24 December 2014.

External links

This article is issued from Wikipedia - version of the Tuesday, March 01, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.