Tymień Wind Farm
Tymień Wind Farm | |
---|---|
Location of Tymień Wind Farm in Poland | |
Official name | Park Wiatrowy Tymień |
Country | Poland |
Location | Tymień, West Pomeranian Voivodeship |
Coordinates | 54°12′02″N 15°51′08″E / 54.20056°N 15.85222°ECoordinates: 54°12′02″N 15°51′08″E / 54.20056°N 15.85222°E |
Status | Operational |
Commission date | 2005 |
Owner(s) | Energa |
Operator(s) | Koszalin Power Plant |
Tymień Wind Farm a group of wind turbines located in the vicinity of Tymień, West Pomeranian Voivodeship near Kołobrzeg, in the district of Koszalin.
The investment cost amounted to PLN 235 million zł. The recipient of energy is Koszalin Power Plant forming part of the group Energa. Built in 2006, by 2008 it was the largest wind farm in the country, with power up to 50 MW, higher than the open in 2003 wind farm in Zagórze near Wolin 30 MW. Currently, the largest wind park in Poland is the Margonin wind farm of 120 MW (60 wind turbines, each with a capacity of 2.0 MW), developed by the company Neolica Poland Sp. z oo owned by Energias de Portugal (EdP).
Specifications
- Number of wind turbines: 25
- Capacity of 50 MW
- Turbines: Vestas V80 with a capacity of 2.0 MW each
- Column height of 100 m
- Rotor diameter of 80 m
- Reception: Energa by a transformer station 20/110 kV Tymien and 110 kV line Tymień- Dunowo
See also
References
- Strona EEZ Technical data, live cameras
- Jerzy Bojanowicz, Wiatr w turbinach Przegląd Techniczny
- Elektrownia wiatrowa w Tymieniu koło Koszalina
This article is issued from Wikipedia - version of the Wednesday, July 08, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.