USS Milton Lewis (DE-772)
History | |
---|---|
Name: | USS Milton Lewis |
Namesake: |
|
Builder: | Tampa Shipbuilding Company, Tampa, Florida |
Laid down: | 23 August 1943 |
Launched: | 6 August 1944 |
Sponsored by: | Mrs. William F. Lewis |
Completed: | Never |
Commissioned: | Never |
In service: | 25 October 1944 (to be towed for scrapping) |
Renamed: | USS Milton Lewis 18 July 1944 (formerly USS Rogers) |
Fate: | Construction contract cancelled 11 September 1944; scrapped incomplete |
General characteristics | |
Class & type: | Cannon-class destroyer escort |
Displacement: | 1,240 tons |
Length: | 306 ft (93 m) |
Beam: | 36 ft 8 in (11.18 m) |
Draft: | 8 ft 9 in (2.67 m) |
Speed: | 21 knots |
Complement: | 186 |
Armament: |
|
USS Milton Lewis (DE-772), ex-USS Rogers (DE-772), was a United States Navy Cannon-class destroyer escort proposed during World War II but never completed.
Milton Lewis was laid down as USS Rogers (DE-772) by the Tampa Shipbuilding Company at Tampa, Florida, on 23 August 1943. While under construction, Rogers was renamed USS Milton Lewis on 18 July 1943, and the name Rogers was reassigned to the destroyer USS Rogers (DD-876). Milton Lewis was launched on 6 August 1944, sponsored by Mrs. William F. Lewis.
Before Milton Lewis could be completed, her construction contract was canceled on 11 September 1944. The incomplete ship was placed in non-commissioned service on 25 October 1944 for towing to Charleston, South Carolina, where she was scrapped.
References
- This article incorporates text from the public domain Dictionary of American Naval Fighting Ships. The entry can be found here.
- Navsource Online: Destroyer Escort Photo Archive USS Milton Lewis (ex-Rogers) (DE772)