USS Samar (ARG-11)

For other ships of the same name, see USS Samar.
USS Samar (ARG-11) at anchor, circa 1945, location unknown.
History
United States
Name: USS Samar
Namesake: Samar Island
Builder: Bethlehem Shipbuilding Corporation
Laid down: 21 September 1944
Launched: 19 October 1944
Sponsored by: Mrs. Elsie M. Alexander
Acquired: 31 October 1944
Commissioned: 5 June 1945
Decommissioned: 24 July 1947
Struck: 1 September 1962
Fate: sold, 10 December 1973, to Zidell Explorations Corporation, physically delivered for scrapping, 25 January 1974
General characteristics
Class & type: Luzon
Type: Internal combustion engine repair ship
Displacement: 4,023 long tons (4,088 t)
Length: 441 ft 6 in (134.57 m)
Beam: 56 ft 11 in (17.35 m)
Draft: 23 ft 0 in (7.01 m)
Propulsion: Triple Expansion Machinery, Single Propeller, 2,500 hp (1,864 kW)
Speed: 12.5 knots (23.2 km/h; 14.4 mph)
Complement: 583
Armament: 1 x single 5"/38 dual purpose gun mount, 1 x 3"/50 gun mount, 2 x twin 40mm AA gun mounts, 12 x single 20mm AA gun mounts

USS Samar (ARG-11) was a Luzon class internal combustion engine repair ship that saw service in the United States Navy during the final days of World War II, and in the post-war period. Named for the Samar Island in the Philippines, it was the second U.S. Naval vessel to bear the name.

Construction and final days of World War II

Samar was laid down on 21 September 1944 by Bethlehem-Fairfield, Sparrow's Point, MD, under a Maritime Commission contract (MC hull 2683); launched on 19 October 1944, sponsored by Mrs. Elsie M. Alexander, delivered to the Navy on 31 October 1944, converted to an internal combustion engine repair ship (ARG) by the Bethlehem Steel Co., Key Highway Plant, Baltimore, MD and commissioned on 5 June 1945, Comdr. Andrew M. Harvey in command.

Following shakedown, Samar sailed for the Panama Canal Zone, arriving at Coco Solo on 28 July. She transited the canal on the 29th and, while en route to Hawaii, received word of the Surrender of Japan. At Pearl Harbor on 16 August, the crew serviced ship for four days while awaiting orders. Underway 21 August, the repair ship sailed to Okinawa via Eniwetok and Saipan, arriving in Hagushi Bay on 22 September. Reporting for duty to Commander Service Division 101 and Task Unit (TU) 70.2.3, she proceeded to China six days later, stood up the Yangtze River on the 28th and moored to buoys in the Hwangpu River off Shanghai on 1 October. Within hours of her arrival, she had six small craft alongside for engine repairs. Samar remained at Shanghai for five months, racing against time as demobilization of sailors stripped her crew of trained repair technicians. At one point, 26 ships and boats were simultaneously assigned to Samar for repairs.

Fate

Assigned to Task Unit 70.2.2 (the North China Service Unit), Samar continued the grinding work of repair services on the China station until 5 May, when the repair ship got underway to return to the United States. Arriving at San Pedro on 27 May Samar later shifted to San Diego and decommissioned there on 24 July 1947. Berthed with the Pacific Reserve Fleet, she remained there until struck from the Navy list and officially transferred to the Maritime Administration's National Defense Reserve Fleet at Suisun Bay, CA, on 1 September 1962. Samar remained laid up in the Suisun Bay Reserve Fleet until her sale and delivery to Zidell Explorations Corporation for scrapping on 25 January 1974.[1]

References

  1. Priolo, Gary P. "USS Samar (ARG-11)". NavSource Online: Service Ship Photo Archive. Retrieved 1 February 2012.
This article is issued from Wikipedia - version of the Tuesday, December 29, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.