United Streetcar

United Streetcar, LLC
Private (subsidiary of Oregon Iron Works)
Industry Transportation
Founded 2005
Defunct 2015
Headquarters Clackamas, Oregon, United States
Products Streetcars (trams)
Website www.unitedstreetcar.com

United Streetcar, LLC, was an American manufacturer of modern streetcars, located in the Clackamas area in the southeastern suburbs of Portland, Oregon, founded in 2005. It was the only U.S. company building modern streetcars[1][2][3]—as distinct from light rail cars[3][4] or new replicas of historic streetcars—until 2013, when Brookville received its first order for a modern (as opposed to faux historic) streetcar, for the Dallas Streetcar.[5]

United Streetcar was a limited liability company and was a wholly owned subsidiary of Oregon Iron Works, Inc. (OIW), which has been in business since 1944. It was originally reported to have been established in early 2007, after OIW was the successful bidder for a contract to construct a prototype streetcar for the city of Portland,[1] but in 2010 the company clarified that it had been formed in December 2005.[6] The company completed its first streetcar in 2009.[7][8] It was dissolved in February 2015.

History

Oregon Iron Works, a specialized manufacturer of complex structural components and systems, began considering entering the field of streetcar manufacturing in 2004, after realizing that the Portland Streetcar system had purchased vehicles built only by foreign manufacturers, possibly due to the absence of any U.S.-based manufacturers of modern streetcars.[9]

The prototype streetcar built by United Streetcar, at its unveiling in Portland in July 2009

In 2005, Congress approved a federal transportation spending bill which included a US$4 million grant to TriMet for the acquisition, on behalf of the city of Portland, of a prototype domestically manufactured streetcar. With a goal of fostering the domestic production of modern streetcars,[1] the grant had been added into the $286 billion spending bill by Oregon Congressman Peter DeFazio, but did not specify a particular company to be the recipient.[10]

In August 2006, the city of Portland issued a Request for Proposals for the provision of a prototype low-floor streetcar compatible with Portland Streetcar's existing fleet.[11] In anticipation of this, OIW signed a "technology transfer agreement" in February 2006 with Škoda, the Czech company which had built Portland's first seven streetcars, in order to permit OIW to manufacture a streetcar to the existing Škoda 10T design but with mostly U.S. components and assembly.[12] Only two formal proposals were received by the city, and after that of the other bidder was "deemed not to have met the minimum requirement",[10][11] the contract was awarded to Oregon Iron Works, in January 2007.[1] OIW then announced that it had created a new subsidiary, United Streetcar, LLC, to handle streetcar manufacturing. The value of the contract was $3.2 million,[13] with the balance of the special $4 million federal grant being used to fund the city's costs to administer the grant and oversee the project.[11]

Prototype vehicle completion

Construction of the prototype streetcar was undertaken at OIW's Clackamas facility (one of two OIW manufacturing facilities).[13] The car was completed in June 2009 and was introduced to the public and the media at a ceremony held in Portland's South Waterfront district on July 1, 2009.[7][14][15]

Numbered 015 in the Portland Streetcar fleet, it was the first modern streetcar built in the United States since 1952,[8][16] since the last PCC streetcar for the San Francisco Municipal Railway.[4] It uses the Škoda 10T design, under license from the Czech manufacturer, and is model variant 10T3.[17] The propulsion equipmentthe motors and electronic control systemwere fabricated by Škoda,[18] but installation took place at OIW’s/United Streetcar’s plant in the United States, and most other components were fabricated by United Streetcar or supplied by other U.S. companies.[13] Overall, the prototype streetcar has about 70 percent U.S. content,[18] enough to make the car's procurement compliant with federal "Buy America" provisions (49 U.S.C. § 5323j).[13]

As with the earlier, Czech-built versions of the Škoda 10T, the United Streetcar 10T3 is a four-axle, bi-directional, low-floor streetcar with three doors on each side and wheelchair ramps extending (on demand) from one door per side. It is 66 feet (20.13 m) long and 8 feet (2.46 m) wide[17] and has a maximum speed of 44 mph (70 km/h).[19] In 2010, the company dropped the 10T3 designation in favor of a new model designation, "100", in connection with a decision to use different propulsion equipment in future orders, as described below.[20]

Change in propulsion system

In 2010, the city of Portland decided to amend its contract with United Streetcar/Oregon Iron Works, to replace the prototype car's Škoda-made propulsion-control system with a new system to be designed by Rockwell Automation, a U.S. company based in Milwaukee, Wisconsin. The propulsion system is the high-tech electronic equipment which controls and coordinates the operation of the car's motors and other key operating components. Car 015's propulsion-control system was made by Škoda, whereas all 10 earlier Portland streetcarseven the seven cars built by Škodahad control systems supplied by ELIN EBG Traction, an Austrian company (and only installed by Škoda).[21] During acceptance testing of car 015 in late summer and autumn 2009, certain (unspecified) problems were encountered, and Škoda and Portland Streetcar were unable to reach agreement on resolving them.[21] This issue, together with a desire by PS, United Streetcar and others to increase further the U.S. content of streetcars built by United Streetcar, led to discussions between Rockwell Automation and the various interested parties in Portland on the possibility and feasibility of Rockwell designing a control system for the United Streetcar design.[21] In April 2010, the Federal Transit Administration (FTA) approved a $2.4-million grant, to be matched by $600,000 in local money, to fund the replacement of car 015's control equipment with new equipment to be designed by Rockwell Automation.[22][23][24] The intention was that, if the partnership with Rockwell proved successful, eventually all streetcars built by United Streetcar would use the U.S.-made Rockwell propulsion system. It was stated that the change would increase the overall U.S. content of the car from around 70% to around 90%,[24][25] and this was the main factor in gaining federal officials' approval of the $2.4 million in "research funds" needed to allow project to proceed.[22]

Prototype streetcar 015 was transported back to the OIW/United Streetcar factory in May 2010,[26] to await design and then installation of the Rockwell system. With the installation completed in late 2011, it returned to the Portland Streetcar carhouse on April 30, 2012, to begin acceptance testing.[27] It entered service on September 22, 2012.[28]

Cars constructed

The first production-series United Streetcar-built streetcar, Portland's car 021, entered service in 2013.

In spring 2009, the city of Portland announced that it had chosen United Streetcar for an order of six streetcars for a planned expansion of the Portland Streetcar system to the city's east side,[13] and a $20 million contract for this order was signed in August 2009.[8] In light of Portland's subsequent dissatisfaction with the Škoda propulsion system, the city decided in 2010 to modify the OIW/United Streetcar contract for these six cars, to substitute equipment from Elin EBG Traction for the originally planned Škoda equipment,[26] which delayed their completion. The cars would receive motors supplied by Siemens, which has a U.S. factory, instead of by Škoda.[20] In mid-2011, the order was reduced from six cars to five;[29] purchase of a sixth car was reinstated in 2014.[30] These were United Streetcar model "100".[20] Delivery began in January 2013, and the first car entered service on June 11, 2013.[31]

The City of Tucson signed a $26 million contract with United Streetcar on June 7, 2010, ordering seven streetcars[26][32] for the Sun Link modern streetcar line that opened July 25, 2014.[33] An eighth car was added to the order in 2012. The original announcement was made in May 2009,[34] but the Tucson project was still awaiting FTA approval at that time.[2] FTA approved the plans in late September 2009 and (jointly with the US DOT) granted $69 million in early 2010 to help complete the project.[35] The Tucson cars are model variant 200, the main difference from model 100 being a more powerful air-conditioning system.[36] The first streetcar for Sun Link arrived in Tucson on August 30, 2013.[37]

In April 2012, the District of Columbia Department of Transportation, in Washington, D.C., placed an order for two model 100 streetcars for use on the DC Streetcar's H Street/Benning Road line, under construction for opening in 2015,[38] and the order was expanded to three cars in August 2012.[39] The three cars were delivered between January 2014[40] and June 2014.[41]

All three orders were completed in 2014, the last car being delivered to Portland in November of that year.

Demise

The delays with the car deliveries, as well as teething issues experienced with the cars in service created tensions with the company's clients.[42] As a relative newcomer to the market, with a single design offering, the company found it difficult to compete with more well-established builders such as Siemens and Bombardier. Consequently, the company received no further orders, and ceased production after the final car was delivered.

United Streetcar president Kevin Clarke left the company in December 2014,[43] and parent Oregon Iron Works has re-purposed the U.S. facilities for boat construction, though the company has stated that they may return to rail-based equipment in the future (streetcars or otherwise).[44] United Streetcar was dissolved in February 2015 as it had declined to produce an annual report.[45]

See also

References

  1. 1 2 3 4 "Oregon Iron Works gets contract for streetcar". Portland Business Journal. January 26, 2007. Retrieved 2010-11-08.
  2. 1 2 "City of Tucson Announces Contractor to Build Modern Streetcars" (Press release). Tucson Department of Transportation. May 27, 2009. Archived from the original on May 29, 2009. Retrieved 2012-12-22.
  3. 1 2 Simons, Vic (April 2013). "The US-built 21st Century Streetcar". Tramways & Urban Transit (UK: LRTA Publishing). pp. 136–137.
  4. 1 2 Redden, Jim (August 29, 2013). "Streetcar firm on busy track". Portland Tribune. Retrieved January 31, 2016.
  5. "Dallas signs Liberty deal" (May 2013). Tramways & Urban Transit magazine, p. 166. UK: LRTA Publishing.
  6. "History & Mission". United Streetcar. Retrieved 2010-11-08.
  7. 1 2 Brugger, Joe (July 1, 2009). "Transportation secretary watches as 'Made in USA' streetcar makes debut". The Oregonian. Retrieved 2009-11-15.
  8. 1 2 3 Rivera, Dylan (August 14, 2009). "Portland inks $20 million deal for locally made streetcars". The Oregonian. Retrieved September 17, 2015.
  9. Hamilton, Don (August 5, 2005). "Iron firm forges streetcar desire". Portland Tribune. Archived from the original on June 8, 2011. Retrieved January 31, 2016.
  10. 1 2 Frank, Ryan; Hunsberger, Brent (June 25, 2007). "A streetcar named acquire" (PDF). The Oregonian. p. 1. Retrieved September 9, 2013.
  11. 1 2 3 City Council Ordinance 180788 (February 28, 2007). City of Portland.
  12. "Streetcar building: Back in the U.S.A." (2009, 3rd quarter). Passenger Train Journal, p. 41. ISSN 0160-6913.
  13. 1 2 3 4 5 MacKinnon, Mary (May 14, 2009). "Streetcars soon to be made in Oregon". Portland Tribune. Retrieved November 22, 2012.
  14. "Portland Streetcar suits this 'livable community'". The Official Blog of the U.S. Secretary of Transportation. July 1, 2009. Retrieved 2009-11-15.
  15. "Transportation Secretary Rides Portland Streetcar". Oregon Public Broadcasting. July 1, 2009. Archived from the original on July 6, 2009. Retrieved 2015-09-17.
  16. Paul Weyrich (July 3, 2007). "Oregon Iron Works – Let the Revival of Streetcars Begin!". The (New) New Electric Railway Journal / Free Congress Foundation. Archived from the original on October 9, 2007. Retrieved September 17, 2015.
  17. 1 2 "United Streetcar ... US manufacturer established for new trams". (April 2007). Tramways & Urban Transit, p. 146. Ian Allan Publishing/Light Rail Transit Association (UK)
  18. 1 2 Bennett, Sam (June 24, 2009). "United Streetcar contracts trickle down in Portland". Daily Journal of Commerce. Retrieved December 23, 2010.
  19. "United Streetcar 100". United Streetcar. Retrieved 2010-11-08.
  20. 1 2 3 Morgan, S.J. (November 2010). "United Streetcar gears up for series production". Tramways & Urban Transit, p. 406.
  21. 1 2 3 "Minutes, Portland Streetcar Citizens Advisory Committee Meeting (January 10, 2010)" (PDF). Portland Streetcar Inc. Retrieved 2010-11-08.
  22. 1 2 "Federal Transit Administration Announces TriMet Will Receive $2.4 Million for Development of U.S.-Made Streetcar Propulsion System" (Press release). Federal Transit Administration. April 16, 2010. Retrieved 2010-11-08.
  23. "Feds give TriMet $2.4M for streetcar". Portland Business Journal. April 16, 2010. Retrieved 2010-11-08.
  24. 1 2 Carinci, Justin (April 19, 2010). "Grant propels streetcar development". Daily Journal of Commerce (Portland). Retrieved 2010-11-08.
  25. "Portland Prototype". United Streetcar. Retrieved 2010-11-08.
  26. 1 2 3 Tramways & Urban Transit, August 2010, p. 313. LRTA Publishing (UK).
  27. Tramways & Urban Transit, July 2012, p. 276. LRTA Publishing (UK).
  28. "Portland Opens New Line" (November 2012). Tramways & Urban Transit magazine, p. 409.
  29. Schmidt, Brad (July 19, 2011). "Portland's $148.3 million eastside streetcar project delayed five months, includes five streetcars instead of six". The Oregonian. Retrieved January 17, 2012.
  30. Tramways & Urban Transit, April 2014, p. 176. LRTA Publishing (UK).
  31. Schmidt, Brad (June 12, 2013) [online date June 11]. "New streetcar rolls out in Portland". The Oregonian. p. B1. Retrieved January 31, 2016.
  32. "Sun Link streetcar construction begins in Tucson", Railway Gazette, April 13, 2012. Retrieved on September 8, 2013.
  33. "Sun Link Tucson Streetcar Project FTA Quarterly Review" (PDF). Federal Transit Administration. March 28, 2013. p. 10. Retrieved September 9, 2013.
  34. "Oregon Iron Works snares $26M contract". Portland Business Journal. May 27, 2009. Retrieved November 22, 2012.
  35. "Modern Streetcar Project". City of Tucson Web. Retrieved 2010-09-13.
  36. "United Streetcar 200". United Streetcar. Retrieved 2010-11-08.
  37. Casanova, Stephanie (September 4, 2013). "First streetcar vehicle arrives to Tucson after months of delay". Arizona Daily Wildcat. Retrieved September 9, 2013.
  38. Neibauer, Michael (April 5, 2012). "D.C. strikes new deal for two streetcars". The Washington Business Journal. Retrieved September 16, 2012.
  39. Neibauer, Michael (August 22, 2012). "D.C. buying third streetcar from Oregon Iron Works". The Washington Business Journal. Retrieved September 16, 2012.
  40. "First of Three American Made DC Streetcar Vehicles to Arrive in District on Tuesday, January 21" (Press release). DDOT. January 17, 2014. Retrieved 2014-11-14.
  41. Tramways & Urban Transit magazine, July 2014, p. 305.
  42. Laris, Michael (November 29, 2014). "U.S. effort to help build homegrown streetcar manufacturer falls short". The Washington Post. Retrieved September 17, 2015.
  43. Tim Becker and KOIN news staff (December 2, 2014). "Streetcar production grinds to a halt – for now". Portland, Oregon: KOIN. Retrieved September 17, 2015.
  44. Schmidt, Brad (March 18, 2015). "Streetcar jobs never arrived". The Oregonian. p. A1. Retrieved September 17, 2015.
  45. http://egov.sos.state.or.us/br/pkg_web_name_srch_inq.show_detl?p_be_rsn=1147704&p_srce=BR_INQ&p_print=FALSE

Coordinates: 45°25′11″N 122°33′53″W / 45.41986°N 122.56464°W / 45.41986; -122.56464

This article is issued from Wikipedia - version of the Monday, March 14, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.