Wenvoe Tunnel

Wenvoe Tunnel

North portal
Overview
Line Barry Railway
Location Culverhouse Cross, Vale of Glamorgan, Wales
Coordinates S 51°27′28″N 3°15′39″W / 51.457821°N 3.260892°W / 51.457821; -3.260892
N 51°28′09″N 3°16′35″W / 51.469250°N 3.276423°W / 51.469250; -3.276423
Status Closed
Operation
Opened 1889
Closed 1963
Technical
Length 1,867 yards (1,707 m)

Wenvoe Tunnel is a disused tunnel on the defunct Barry Railway that runs under Culverhouse Cross on the western outskirts of Cardiff, in the Vale of Glamorgan, south Wales. It was opened in 1889 on a line used to carry coal to Barry Docks, and closed in 1963.

Description

The southern end of the tunnel is to the west of Wenvoe Quarry, off Caerau Lane, and the northern end is north of Culverhouse Cross Retail Park, just west of the A4232 road and south east of the village of St Georges super Ely.[1] The tunnel carried the Barry Railway for a mile through the downs before it crossed the River Ely and ran north to the coal fields.[2] The tunnel passed under the Wenvoe and Cowbridge roads. The other main works on the railway were a tunnel of .75 miles (1.21 km) at Treforest and a viaduct over the River Ely 535 feet (163 m) long and 62 feet (19 m) high.[3]

A British Rail Gazetteer says the tunnel, between Wenvoe and Drope Junction, is 1 mile (1.6 km) and 108 yards (99 m) long.[4] More simply, the closed tunnel on the former BarryPontypridd route is 1,867 yards (1,707 m) long, the 9th longest Great Western tunnel.[5] It is brick-lined apart from a short section at the south end. There is one brick-lined ventilation shaft near the centre, almost as wide as the tunnel.[6]

Construction

Tunnel interior in 2015

The Barry Docks and Barry Railway Company were founded to break the effective monopoly that the Taff Vale Railway and the Cardiff Docks had established over export of coal from the South Wales Coalfield. Work on the railway began in 1885, and within four years included an 18.5 miles (29.8 km) line from Trehafod to the Barry Docks, with several branch lines.[6]

In July 1885 The Engineer reported that the heavy work at Wenvoe Tunnel was being pressed forward, and it was expected that there would soon be 3,000 men at work on the project.[7] The earth was removed from the tunnel using skips that held 1 cubic yard (0.76 m3) and ran on three 1.75 feet (0.53 m) roads, mostly pulled by ponies.[8] The skips were run out to the tip, where they could be lifted by hand when off the road.[9] Several pressurized oil lights were used to allow night work. In the deep cutting to the north they were connected to a pump that was used to clear water from the tunnel. In the rock cutting to the south they were connected to air compressors used to drive rock drills.[10]

History

The double-track tunnel was opened for service in 1889. It was closed on 31 March 1963 after the Tynycaeau North signal box was destroyed by fire.[6] The stone above the north portal with the date of 1888 is now covered in moss and scarcely legible.[11] The top of the ventilation shaft is enclosed in a concrete building in a retail parking lot in Culverhouse Cross.[12] The tunnel contains a large water main. It is subject to flooding up to 4 feet (1.2 m) in depth after heavy rainfall.[6]