Yanbara Dam

Yanbara Dam
Location Ōno, Fukui Prefecture, Japan.
Coordinates 35°55′13″N 136°40′21″E / 35.92018611°N 136.6725278°E / 35.92018611; 136.6725278Coordinates: 35°55′13″N 136°40′21″E / 35.92018611°N 136.6725278°E / 35.92018611; 136.6725278
Construction began 1965
Opening date 1968
Dam and spillways
Impounds Itoshiro River
Height 23 m
Length 114.6 m
Reservoir
Total capacity 900,000 m³
Catchment area 333.6 km²

Yanbara Dam (鷲ダム Yanbara-damu), in the Fukui prefecture of Japan, is the dam which is constructed to Nine Headed-Dragon River water system of the Nine-head Dragon River. With a gravity type arch dam design 45 metres (148 ft) tall, it is the dam for generation of electricity, forming the lower reservoir of the pumping-up hydraulic power plant, Nagano power plant, of the same company. It generates the electric power of the maximum of 220,000 kilowatts.

History

In 1957, as for development of electric power resources the hydroelectric power plant construction plan in Nine Head Dragon, Kawakami style sections was announced. At this point in time as for construction of the Yanbara dam of course, power generation with pumped-up water itself was not included in plan. In order to add power generation with pumped-up water in plan, the Ministry of International Trade and Industry (Ministry of Trade and Industry and the present economic industrial ministry were recommended. So it was, the dam was planned this time as a lower reservoir of power generation with pumped-up water.

Wikimedia Commons has media related to Yanbara Dam.


This article is issued from Wikipedia - version of the Tuesday, September 29, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.