Zero Point Interchange
Zero Point Interchange | |
---|---|
Location | |
Islamabad | |
Coordinates: | 33°41′37″N 73°03′54″E / 33.69361°N 73.06500°ECoordinates: 33°41′37″N 73°03′54″E / 33.69361°N 73.06500°E |
Roads at junction: | Islamabad Highway, Kashmir Highway, Khayaban-e-Suharwardy |
Construction | |
Type: | Cloverleaf interchange |
Constructed: | 2008–2011 by Maqbool Associates (Pvt.) Limited |
Opened: | June 6, 2011 |
Maintained by: | Capital Development Authority |
Zero Point Interchange is th South asia's largest interchange. The project is designed by Engineering Consultant Int.(Pvt.)Ltd. The construction work started on 11 September 2008. The interchange was formally inaugurated in July 2011 by the Prime Minister of Pakistan Yousaf Raza Gillani, though construction work on a loop was still in progress. Construction of Interchange was completed in 2012[1] The project cost about PKR 4 billion (Ilyas Ali) [2]
References
- ↑ "Zero Point interchange near finish line". DAWN. 14 November 2011. Retrieved 25 January 2012.
- ↑ "And now presenting: Zero Point Interchange". The Express Tribune. 30 May 2011. Retrieved 25 January 2012.
|
This article is issued from Wikipedia - version of the Saturday, April 23, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.