Árpád Bridge

"Árpád híd" redirects here. For the metro station, see Árpád híd (Budapest Metro).
Árpád Bridge
Carries 2*3 roads+tram
Crosses Danube River
Locale Budapest
Official name Árpád híd
Characteristics
Design Beam bridge
Total length 981 meters (3,219 ft)
Width 27.6 meters (91 m)
Longest span 457.2 meters (1,500 ft)
History
Opened November 7, 1950
Statistics
Daily traffic 150,000

Árpád Bridge or Árpád híd is a bridge in Budapest, Hungary, connecting northern Buda (Óbuda) and Pest across the Danube.

It is the longest bridge in Hungary, spanning about 2 km (1.24 mi) with the sections leading up to the bridge, and 928 m (0.58 mi) without them. It is 35.3 m (116 ft) wide with pedestrian and bicycle paths.

At its Óbuda end is Flórián tér, Szentlélek tér (near the Main Square of Óbuda, the Vasarely and Kassák Museums).

Margaret Island is connected to Árpád Bridge through an embranchment approximately in the middle of the bridge, and crosses the Southern tip of Óbuda Island as well, although there is no road, pedestrian or any other connection whatsoever between the two. (See Sziget Festival)

At the Pest end, the adjoining Line 3 (North-South) metro station is also called "Árpád híd".

Construction and expansion

The original bridge

Construction began in 1939 by the plans of János Kossalka. It was planned to be named "Árpád Bridge" after Grand Prince Árpád, the second Grand Prince of the Magyars.

Due to World War II, the bridge was finished only after the war in 1950. Because of the communist regime then ruling Hungary, the bridge was opened as Stalin Bridge (Hungarian: Sztálin híd). The final construction works were directed by Károly Széchy and Pál Sávoly.

Although the pillars were built in their current dimensions, the original bridge contained only a 2x1 lane road, railroad tracks (for trams, but until the reconstruction of the Northern Rail Bridge the tracks were also used by cargo trains as well) with pedestrian paths. This bridge was 13 m (42.65 ft) wide, 11 meters (36 ft) of this was the road and the tracks, and an additional 1 m (3.28 ft) wide pedestrian path were on each sides. Today the tram tracks are where the original bridge was situated.

The name was changed back to Árpád Bridge in 1958.

Expansion

Between 1980 and 1984, by extensive reconstruction and expansion works, two more lanes were added for cars, the pedestrian pathways were widened, the tram track was modernized and overpasses were built for the intersections at both Eastern (Pest) and Western (Buda/Óbuda) ends of Árpád Bridge.

This was planned and executed in connection with the expansion of the adjacent Róbert Károly körút (further sections also called Hungária körút and Könyves Kálmán körút as well) to 2x3 lanes and double tramway tracks . The project was called Hungária körgyűrű (English: Hungária Beltway), although the last third of the belt (Könyves Kálmán körút) was finished only around the millennium, years after the completion of Lágymányosi Bridge at the other end of the planned beltway.

See also

References

    External links

    Coordinates: 47°32′16″N 19°03′12″E / 47.53778°N 19.05333°E / 47.53778; 19.05333

    This article is issued from Wikipedia - version of the Monday, November 09, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.