Red Ahead

Red Ahead
Overview
Type Rapid transit
System Chicago 'L'
Status Under construction
Locale Chicago, Illinois, USA
Services      Red Line
     Purple Line
Operation
Operator(s) Chicago Transit Authority
Technical
Track gauge 4 ft 8 12 in (1,435 mm)

In the spring of 2012, Chicago Transit Authority started a station and track rehabilitation program dubbed "Red Ahead",[1] beginning on the North Side Main Line, which is called the "Red North" project.[2] The program monitors the full route of the Red Line, which does not include the stations of Loyola, Bryn Mawr, Sheridan, or Wilson.[3] Stations between Wilson through Fullerton, and the State Street Subway, are also not included. In May 2012, the CTA started to work on the North Side Main Line stations which includes Jarvis, Morse, Granville, Thorndale, Berwyn, Argyle, and Lawrence. The stations are listed in order, starting at Granville, then Morse, Thorndale, Argyle, Berwyn, Lawrence, and finally Jarvis. This project started in June 2012 and completed in December 2012. This project is also part of the Red Ahead's "Red & Purple Modernization" project.[4]

Extension

Proposals are currently underway to extend the Red Line south from 95th Street. The CTA developed nine different proposed routes, one of which includes routing the Red Line down the median of the Bishop Ford Freeway and another in the median of Interstate 57. During an alternatives analysis meeting on April 11, 2007, CTA narrowed further study down to five possible routes, two for bus rapid transit and three for heavy rail (rapid) transit. The two bus routes would travel south from the 95th/Dan Ryan terminal either down Halsted Street or Michigan Avenue, while the heavy rail routes left for consideration were the Halsted and Michigan corridors (either underground or elevated) as well as the Union Pacific Railroad corridor (elevated or trench), which would traverse southeastward toward the South Shore Line. In October 2008 the CTA commissioned a $150,000-study of an extension due south to 130th/Stony Island in the community area of Roseland.[5]

Alternatives

In December 2008, at the Screen 2 presentation of the federally mandated Alternatives Analysis Study, the possible corridors and modes of transit were furthered narrowed down to either Halsted Street (Bus Rapid Transit or elevated Heavy Rail Transit) and the Union Pacific Railroad corridor (elevated Heavy Rail Transit).[6]

In December 2009, the CTA identified the Locally Preferred Alternative as the Union Pacific corridor.[7] A map and description of the route are found here: Multiple Environmental Impact Studies will be carried out, and will determine exact alignments and design.[7][8]

The alignment consists of a new elevated rail line between 95th Street and a new terminal station at 130th Street, paralleling a Union Pacific Railroad line through the Far South Side neighborhoods of Roseland, West Pullman, and Riverdale. In addition to the terminal station at 130th, three new stations would be built at 103rd Street, 111th Street, and 115th Street. Basic engineering, along with an environmental impact statement, are currently underway.[9]

Red Line South Reconstruction project

On May 19, 2013, the Dan Ryan branch was shut down at 2 a.m. as part of the Red Line South Reconstruction project which cost $425 million.[10] Track conditions were causing Red Line riders to experience longer travel times, crowded trains and unreliable service. The tracks will have extensive repairs which can be completed over a five-month period with full closure, as opposed to a four year schedule if construction was limited to weekends only. This project will improve commute time, faster rides, and the overall passenger experience. As part of the project, the Garfield, 63rd, and 87th stations were renovated and equipped with an elevator, making all Dan Ryan branch stations into ADA (Americans with Disabilities Act) compliance. The newly reconstructed Dan Ryan branch and the nine stations reopened on October 20, 2013 at 4 a.m.

Red & Purple Modernization Project

The CTA recently studied four possible alternatives for the project and will provide community presentations of those alternatives in late 2012 to 2013. The CTA is also proposing to close five stations permanently on the Red and Purple lines, including Foster, South Boulevard, Jarvis, Lawrence, and Thorndale.[11]

Red North Station Interim Improvements

In November 2011, the CTA announced the Red North project as part of the Red Line Capital Investment.[12] The cost of the project was $86 million with a $57.4 million contract granted to contractor Kiewit Infrastructure. The project included the renovation of seven stations: Granville, Morse, Thorndale, Argyle, Berwyn, Lawrence, and Jarvis. The project started on June 1, 2012 at Granville and finished its renovation on December 13, 2012 at Jarvis. The project also included the elimination of slow zones in which trains were forced to travel at reduced speeds due to sub-optimal track conditions.

References

  1. "CTA Red Ahead Program". Chicago Transit Authority. Retrieved August 18, 2012.
  2. "Red Ahead: CTA Red North". Chicago Transit Authority. Retrieved August 18, 2012.
  3. "Red North - Section 2". Chicago Transit Authority. Retrieved August 18, 2012.
  4. "CTA Red & Purple Modernization project". Chicago Transit Authority. Retrieved August 18, 2012.
  5. Regional Transit Authority (2008-10-03). "RTA Funded Study Looks at the Impact of the Proposed Red Line Extension" (PDF). Retrieved 2008-10-09.
  6. "Red Line Extension Alternatives Analysis Study" (PDF). Retrieved 6 January 2009.
  7. 1 2 "About the Project: Alternatives". Red Line Extension Project. Chicago Transit Authority. Retrieved December 17, 2009.
  8. "Project Schedule". Red Line Extension Project. Chicago Transit Authority. Retrieved December 17, 2009.
  9. "Red Line Extension Project". Chicago Transit Authority. Retrieved February 25, 2010.
  10. "Red Line South Track Renewal Project". Chicago Transit Authority. Retrieved June 15, 2012.
  11. "Environmental Impact Statement Scoping Information" (PDF). North Red and Purple Modernization Project. Chicago Transit Authority. Retrieved January 28, 2011.
  12. "CTA Red Ahead - Red North project". Chicago Transit Authority. Retrieved August 24, 2012.
This article is issued from Wikipedia - version of the Friday, August 28, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.