63rd Street Lines

IND/BMT 63rd Street Lines

The F train serves the entire IND 63rd Street Line at all times.
Overview
Type Rapid transit
System New York City Subway
Locale Manhattan and Queens
Termini West of Lexington Avenue – 63rd Street, Manhattan
West of 36th Street, Queens
Stations 3
Operation
Opened 1989 (1989)
Owner City of New York
Operator(s) New York City Transit Authority
Character Underground
Technical
Number of tracks 2–4
Track gauge 4 ft 8 12 in (1,435 mm)
Electrification 600 V Direct current traction 3rd rail
63rd Street Line
Legend
IND Queens Boulevard Line
BMT Astoria Line
21st Street – Queensbridge
63rd Street Tunnel
Roosevelt Island Roosevelt Island Tramway
63rd Street Tunnel
Second Avenue Subway (future)
BMT tracks end
Lexington Avenue – 63rd Street

IND Sixth Avenue Line
BMT Broadway Line
For the section of tunnel carrying these lines under the East River, see 63rd Street Tunnel.

The IND 63rd Street Line and BMT 63rd Street Line are two rapid transit lines of the IND and BMT divisions of the New York City Subway system. The two lines run under 63rd Street on the Upper East Side of Manhattan and meet at the Lexington Avenue – 63rd Street station; two diamond crossover tracks just west of that station allow trains to switch between the two lines.

The IND line is served by the F train at all times. It connects the IND Sixth Avenue Line in Manhattan to the IND Queens Boulevard Line in Queens. This line starts at 57th Street, running under Central Park and turning east under 63rd Street and running through the 63rd Street Tunnel under the East River.

The BMT line connects the express tracks of the BMT Broadway Line at 57th Street – Seventh Avenue to Lexington Avenue – 63rd Street, where it currently ends. An extension of this line is currently under construction; when complete, it will turn from 63rd Street onto Second Avenue, connecting to the IND Second Avenue Line, also under construction. This line is currently not used by any services, but will be used by the Q train when the first phase of the Second Avenue Line opens, currently planned for December 2016.

Extent and service

The following services use the 63rd Street Line:

Service information Lines served Section of line
Service Former
company
IND Culver Local, Sixth Avenue Local, Queens Boulevard Express entire IND section
none BMT none entire BMT section

BMT line

The BMT 63rd Street line is not currently used for regular service, except for detours when other lines are blocked due to construction or emergencies. When this happens, using the diamond crossovers located railroad south (compass west) of this station, trains can switch between this line and the IND line to travel from the Broadway Line to Queens. The tracks on this line are coded as BMT chaining, tracks G3 and G4 to distinguish them from the pre-existing G1 and G2 tracks associated with the 60th Street Tunnel and Astoria Line. Because this line is currently not used by any services, it is not shown on the official subway map. In the past, these tracks were often to store trainsets outside of Rush Hour. The BMT 63rd Street Line would have connected to the IND Second Avenue Line, allowing trains from that line to access the BMT Broadway Line. However, construction on the Second Avenue Subway ended in 1975 due to the city's major fiscal crisis; as a result, the BMT line ended abruptly at Lexington Avenue-63rd Street. That station was never fully finished; half of the station's platforms, which would have served the BMT line, were closed off and are currently unused.[1][2] In 2007, construction on the Second Avenue line restarted and in 2011, construction had started at Lexington Avenue-63rd Street to expand and renovate the station, as well as extending the BMT line northwest to connect to the Second Avenue Line, planned to open in December 2016.

IND line

This line is coded as new chaining route "T" (T1 and T2). The IND 63rd Street Line uses the 63rd Street Tunnel to cross the East River. The 63rd Street Tunnel is a two-level tunnel under the East River, which hosts the 63rd Street Line on its upper level. The lower level, currently unused, is reserved for the Long Island Rail Road's new East Side Access service to Grand Central Terminal, which is expected to commence operations by 2022.

Service history

The first segment of the IND 63rd Street Line opened on October 29, 1989, between 57th Street and 21st Street – Queensbridge. The BMT 63rd Street Line was not used for service. The IND Line was usually served by B and Q trains; during this time, Q trains ran on the IND Sixth Avenue Line due to reconstruction of the Manhattan Bridge. Q trains served the IND Line weekdays until 9:30 PM, while B trains typically served the line late evenings, and weekends; F trains served the line during late nights until 1997. The JFK Express also served the IND Line very briefly, as the service was discontinued in April 1990. In May 1995, the Q returned to the BMT Broadway Line during middays, using the BMT 63rd Street Line and switching to the IND 63rd Street Line west of Lexington Avenue - 63rd Street station. In 1997, 63rd Street Shuttle service via the IND Sixth Avenue Line replaced F service during late nights. Between February 22, 1998 and May 22, 1999, service between the Sixth Avenue Line and the 63rd Street Line was suspended because of construction on the IND Line. B and Q trains were cut back to 57th Street, and the late night shuttle suspended. During this time, a different shuttle provided full-time service between 21st Street - Queensbridge and the BMT Broadway Line; this shuttle switched between the IND and BMT Lines west of Lexington Avenue - 63rd Street station, making it one of the few services to use the BMT 63rd Street Line. On May 22, 1999, the B and Q returned to 21st Street - Queensbridge. On July 22, 2001, the north side (Sixth Avenue Line) tracks of the Manhattan Bridge closed; B and Q service on the IND line was replaced with a full-time shuttle via the Sixth Avenue Line.

On December 16, 2001, the 63rd Street Connector to the IND Queens Boulevard Line officially opened, and the F was rerouted to serve the IND Line at all times, replacing the shuttle and assuming its current service pattern. The MTA's plans for Second Avenue Subway service will extend the Q, now running via the BMT Broadway Line, along the BMT 63rd Street Line, turning north to connect to the IND Second Avenue Line to 96th Street.[3][4]

Background

Early plans

In February 1963, the Transit Authority proposed a two-track East River subway tunnel under 76th Street with unspecified connections to the rest of the transit network, at a cost of $139 million. In a May 2, 1963 report, the proposed site of the tunnel was switched to 59th Street. On May 24, Mayor Wagner suggested that a tunnel around 61st Street "be built with all deliberate speed."[5] On October 17, 1963, the Board of Estimate approved a new East River tunnel sited at 64th Street, noting that it would cost $30 million and take seven years to build. The 64th Street site was said to be $5.3 million less expensive, "because of easier grades and smaller curves."[6]

The lack of specificity about how the tunnel would be used was criticized at an early date. In December 1964, the Citizens Budget Committee said that the project (now shifted to a 63rd Street site) was "leading nowhere-to-nowhere." The Committee went on to propose three connections that were eventually adopted (to the BMT Broadway Line and IND Sixth Avenue Line, both at 57th Street, to the IND Queens Boulevard Line at Queens Plaza), and one that wasn't (to the IRT Lexington Avenue Line).[7]

The Board of Estimate approved the revised 63rd Street route on January 14, 1965, at a budget of $28.1 million and a four-year timetable, with the connections to the rest of the transit network awaiting a study that was then scheduled for completion in mid-1966. The Times noted that "A variety of possible connections...are under study," including possible new lines under Madison and Second Avenues. The Transit Authority's chairman, Joseph E. O'Grady, said that the tunnel and the subway connections would eventually be completed at about the same time, "since construction of the tunnel takes at least a year longer than the connections."[8]

In November 1967, voters approved a $2.5 billion transportation bond issue, and in early 1968, under the Program for Action, officials provided detailed plans for how it would be used. Among many other projects, the proposal included:[9]

This proposal, with some modifications, received approval from the Board of Estimate on September 21, 1968.[10]

Construction

Construction on the 63rd Street Line began on November 25, 1969, with tunneling westward in Queens, as well as in both directions under Welfare Island (now called Roosevelt Island). The double-deck, 3,140-foot tunnel under the East River was holed through on October 10, 1972. The East River tunnel was completed in 1973, and outfitting for the new lines that were to run through it was to begin in early 1974. Work on the segment of the line that ran under Central Park was started in 1971 and was completed in 1973. Construction on the section between 5th Avenue and Park Avenue began in August 1974.

On March 20, 1975, New York mayor Abraham Beame announced significant cutbacks to the plan. Construction of the Southeastern Queens extension was "delayed to 1981," and the Long Island Rail Road extension through the lower level of the 63rd Street tunnel was "indefinite[ly] shelved." However, it was still anticipated that the Queens Boulevard super-express and the Archer Avenue Line up to Parsons/Archer would still be completed. (The Second Avenue Subway had been dropped the previous December.) The Queens project, although curtailed, was given priority because it was "more advanced in construction."[11]

By the summer of 1976, the Transit Authority would announce that "it will take an extra five or six years—until 1987 or 1988—to complete the new Manhattan–Queens trunk subway line from Central Park to Jamaica via the new 63rd Street tunnel." The main cause of the delay was the 5.8-mile "super express," although it was expected that the three new Archer Avenue line stations could be ready sooner. As an interim measure, the authority proposed a new station at Northern Boulevard, adjacent to the Queens Plaza, possibly opened by 1983 or 1984.[12]

The Manhattan portion of the line was completed in 1976. The Times noted:

Underneath Central Park lie two eerily quiet sets of tracks. They have advanced equipment — welded tracks, fluorescent lighting and rubber-based pads under the rail — that have not yet been installed on most of the system's 230 operating miles.

These tunnels were finished in 1976. This year, the contractor will tear down his two-story office in Central Park, remove the fence near Fifth Avenue and restore foliage and the bird house he damaged, at a cost of $300,000.

By 1981, five years after completion of the tunnel, the Transit Authority expects to put it to use; its brand new quiet tracks will be used as a storage yard for out-of-service trains.[13]

Zoo York Wall

See also: Zoo York

The Zoo York Wall was a graffiti wall within the line's length through Central Park, where subway writers and other street artists "made their marks" in the early 1970s. It was a temporary wall, erected in 1971 by the New York City Transit Authority to block unauthorized entry into the site of the 63rd Street Line running underneath the Central Park Zoo. Its name originates from the 63rd Street Tunnel (which it was supposed to guard), then called the "Zoo York Tunnel". During the tunnel's construction (1971–1973), the tunnel provided a subterranean gathering place for very early subway artists who hung around together in Central Park, and was named Zoo York by ALI, founder of the SOUL ARTISTS graffiti crew. The name came about because it was in a zoo in New York, hence "Zoo York".[14]

Armored with polished aluminium in the futile hope of resisting spray-paint and permanent marker ink, the wall did little to dissuade teenage graffiti writers from climbing over and descending into the tunnel during its construction. Graffiti artists also marked their territory by "tagging" the wall which had been put up around the construction site. Upon completion of the subway project in 1973, the "Zoo York Wall" was torn down.[14]

The name came about because the Central Park Zoo at that time was a classical 19th-century menagerie, populated by wild animals displayed in open-air cages, who paced the bars back and forth neurotically—always hoping for an escape, yet paradoxically blind to the world beyond their cramped quarters. ALI noted that by contrast, here were these feral teenagers, himself included, living in a free society, who sought nothing more wholeheartedly than to crowd together in a deep, dark hole in the ground. Marvelling at their perverse urban psychologies, ALI decided that all city people were insane for seeking imprisonment in tiny apartments, offices, subway cars and the like, and declared that New York City itself was "not New, but a Zoo!" He named the tunnel itself "Zoo York".[14][15]

The unused tunnel

In May 1978, the Times noted, "What started out a few years ago as 40 miles of new subway routes to serve the long-suffering residents of Queens has been whittled down to 15 miles, is years behind schedule, and will cost more than twice as much as originally estimated....The line costs $100,000 a foot, will be very short and will serve only a modest number of riders." The article now noted that the Queens super-express had been deferred "to 1988 at the earliest," and the only sections in progress were the 63rd Street Line to Northern Boulevard, and "a small piece along Archer Avenue." The 63rd Street Line's opening date was projected for 1985. The plan depended on the idea that Queens Boulevard riders would be willing to exit the subway at Queens Plaza and walk a city block to a new station at Northern Boulevard to continue their trip. The transit authority projected that this transfer would draw 11,000 passengers a day.[13]

By October 1980, officials considered stopping both projects and spending the money on maintaining the existing system. By now, the Archer Avenue project was projected for completion in 1984, and the 63rd Street line in 1985. The Times noted that the lower level of the 63rd Street tunnel was still under construction, even though "officials knew that the tunnel would never be used." Richard Ravitch, the MTA chairman, said that to stop the work was impossible or so costly as to make it impractical subsequent to the construction of the subway portion." It "had to be finished — largely for structural reasons — to support the subway tunnel above." It was described as a "tunnel to nowhere."[16]

In the spring of 1983, the MTA took a fresh look at the tunnel, considering every possibility between leaving it as-is (with its terminus in Long Island City), to the original 1960s plan, the cost of which was now estimated at $1 billion. Without some kind of connection to the rest of the Queens subway network, the line was expected to attract just 220 passengers per hour during the morning rush.

The plan eventually adopted was the least expensive (other than doing nothing) — to connect the tunnel to the tracks of the IND Queens Boulevard Line, at a cost of $222 million, and a timetable of at least eight years. It was estimated that the project would attract 16,500 passengers per hour. The MTA board approved this plan on December 14, 1984. The section of the line up to Long Island City was projected to open by the end of 1985.[17]

By June 1985, the project was delayed again:

The 63d Street subway tunnel, which has been under construction for 14 years and was scheduled to open later this year, has serious flaws and will not open on time, transit officials said yesterday.

Some parts of the tunnel, which links Manhattan and Queens, are flooded with six feet of water, officials said. In other areas, girders are rusting and electrical equipment has corroded.

The officials would not predict publicly when the $600 million structure might be opened or how much the repairs would cost.[18]

Two contractors were hired to assess the structural integrity of the tunnel, and the delay was estimated at two years. In August 1985, the federal government—at the instigation of Senator Alphonse D'Amato—suspended funding on both the 63rd Street and Archer Avenue projects—over "concerns with the construction management practices." The two projects had cost $1 billion between them, of which the federal government had provided $530 million for 63rd Street and $295 million for Archer Avenue.[19]

By the end of 1985, the 63rd Street Line's eastern Queens extension was no longer being planned. At 21st Street – Queensbridge, usage estimates for that station in 1984 were 220 passengers per hour. The MTA was studying four options for making this line more useful:[20][21][22][23][24]

  1. The Queens Express Bypass: extending the line along the LIRR to Forest Hills – 71st Avenue. It would be completed in 1998 and cost $931 million. This was the original plan for this line proposed in the 1968 MTA Program for Action. This was also the only option that the MTA felt that would provide relief to the E and F express services. At a proposed station at Northern Boulevard, a transfer concourse would have allowed transfers between local, express, and bypass trains.[21][22][23][24]
  2. Connecting the line to the local tracks of the IND Queens Boulevard Line. It was the cheapest and fastest alternative to complete, as it would be done by 1993 at a cost of $222 million. But critics complained that it would do the least to relieve overcrowding on the E and F services in Queens, the most crowded in the system. The line would leave 23 of the available capacity of the 63rd Street Line unused and probably make any future expansion of this line unlikely. This was the option ultimately chosen. It was completed in 2001, with connections to the express tracks.[21][22][23][24]
  3. Extending the 63rd Street Line through the Sunnyside Yard and the LIRR Main Line to the Archer Avenue Line. It would cost $594 million and be completed by 1997, but residents along the proposed route objected to this option.[21][22][23][24]
  4. Extending the line to Sunnyside Yard in Queens and allow passengers to connect to a new LIRR service stopping in Rosedale and Queens Village. The route of the new LIRR service would be the Montauk Branch, used mostly for freight service. It would cost $488 million and be completed by 1995, but like the Main Line proposal above, Queens residents along the proposed route objected to it.[21][22][23][24]

Opening

By 1987, the MTA's contractors had concluded that the tunnel was structurally sound, although federal funding had not yet been released. On February 6, 1987, the MTA approved a new plan to have the tunnel open by October 1989. The agency also proposed a $550 million, 1,500-foot connector to both the express and local tracks of the IND Queens Boulevard Line. Under the plan, the Queens Boulevard Line would be "reverse-signaled," which would accommodate Manhattan-bound trains on three out of the line's four tracks in the morning rush, and the opposite for the evening rush. This part of the plan was not projected to begin before the 1990s.[25]

In June 1987, the federal government completed its own review of the project. "A little light appeared at the end of the Metropolitan Transportation Authority's 63rd Street "tunnel to nowhere" last week," the Times reported, as the government's own inspector found the tunnel sound, and released the final installment of $60 million for both the 63rd Street and Archer Avenue projects.[26]

The first train to use the extension was the "rail polisher train", a non-revenue move that occurred on August 1, 1989.[27]

A month shy of twenty years after construction began, both lines went into service on October 29, 1989, after an expenditure of $898 million,[27] with new stations at Lexington Avenue, Roosevelt Island, and 21st Street at 41st Avenue in Queens. The IND line was served by Q trains on weekdays and B trains on weekends. The 1,500-foot connector to the Queens Boulevard Line had not yet started construction.[28] The BMT line was not in use at that time. It was built for future service options, including a connection to the Second Avenue Subway for service from the Upper East Side to Lower Manhattan.

From May to November 1995, the north side of the Manhattan Bridge was closed for reconstruction during middays and weekends and the Q train was routed via Broadway at this time. It used the BMT 63rd Street Line to connect to the IND 63rd Street Line and serve Lexington Avenue, Roosevelt Island, and 21st Street – Queensbridge stations. During reconstruction on the IND side of the line from February 1998 to May 1999, 63rd Street Shuttle trains operated via this line between 21st Street – Queensbridge and 57th Street – Seventh Avenue, later running further to 34th Street – Herald Square.[29]

Connection to the Queens Boulevard Line

Planning for the connection to the IND Queens Boulevard Line began in 1992; construction began in July 1994. The remaining section from 21st Street to the Queens Boulevard Line cost $645 million. In January 2001, the 63rd Street Connector was opened for construction reroutes.[30] The Connector came into regular use on December 16, 2001 with the rerouting of F service at all times to 63rd Street. The construction project also extended the lower level LIRR tunnel and involved a number of other elements, including the integration of ventilation plants, lowering a sewer siphon 50 feet, rehabilitation of elements of the existing line, mitigating ground water, diverting trains which continued to run through the project area and widening of the entry point to the Queens Boulevard Line to six tracks. This new tunnel connection allowed rerouting the Queens Boulevard Line F trains via the 63rd Street Tunnel, which increased capacity on the heavily-travelled Queens Boulevard Line. It also allowed a new local service, the V train, to run along the Sixth Avenue and Queens Boulevard lines; this service has since been discontinued and replaced with an extension of the M train.[27]

Connections to the Second Avenue Subway

Workers celebrate after the IND Second Avenue Line Tunnel Boring Machine reaches the BMT 63rd Street Line.

The 63rd Street Lines were envisioned to connect the Second Avenue Subway to the BMT Broadway Line, the IND Sixth Avenue Line, and Queens. The BMT 63rd Street Line would directly connect the upper Second Avenue Line to the Broadway Line. Construction on the IND Second Avenue Line began in 1972, but was halted in 1975 due to the city's several fiscal crisis. As a result, the BMT 63rd Street Line was not finished and instead ended abruptly at Lexington Avenue-63rd Street station. In 2007, construction on the Second Avenue line recommenced and in 2011, construction started at Lexington Avenue-63rd Street to expand and renovate the station, and to complete the connection to the Second Avenue Line. This renovation will remove the walls on the platforms and open new entrances on the Third Avenue side of the station.The tunnel boring machine being used to create the tunnels for the first phase of Second Avenue Line broke through the wall into the lower level of the BMT 63rd Street Line on September 22, 2011.[31]

When the first phase of the Second Avenue Line opens, the MTA will extend the Q service under Central Park and eastward to the stop at Lexington Avenue – 63rd Street before turning north at Second Avenue to merge with the Second Avenue Line. This will create direct service between the Upper East Side and the existing BMT Broadway Line.[32] The double-decked Lexington Avenue – 63rd Street station will allow cross-platform interchange between the two 63rd Street lines. Eastbound trains to Queens (and later Upper Manhattan) use the lower level; southbound trains to Midtown and Lower Manhattan use the upper level.

The third phase of Second Avenue Line construction would include a connection between the IND 63rd Street Line and the Second Avenue Line, turning southwest from 63rd Street onto Second Avenue. This connection would allow trains coming from the IND Queens Boulevard Line to run on the Second Avenue Line to Midtown Manhattan and Lower Manhattan. However, the MTA currently has no plans to run passenger trains through this connection and it would be used only by non-passenger trains.[33]

Station listing

Station service legend
Stops all times
Stops all times except late nights
Stops weekdays only
Stops rush hours in the peak direction only
Time period details
Station Services Opened Transfers and notes
Line begins as a split from the IND Queens Boulevard Line (F )
21st Street – Queensbridge F  October 29, 1989 Elevators are out of service until October 2016.
63rd Street Tunnel
Roosevelt Island F  October 29, 1989
63rd Street Tunnel
Merges[31] with the IND Second Avenue Line (under construction)
Lexington Avenue – 63rd Street F , no regular service October 29, 1989 The side of the station dedicated to the BMT 63rd Street Line is incomplete.
It is under construction and scheduled to open in December 2016 with Phase 1 of the Second Avenue Subway.

MetroCard transfer to IRT Lexington Avenue Line (4  5  6  <6>) at 59th Street
MetroCard transfer to BMT Broadway Line (N  Q  R ) at Lexington Avenue / 59th Street

connecting tracks (No regular service)
Merges with IND Sixth Avenue Line (F )
Merges with BMT Broadway Line express tracks (no regular service)

Gallery

References

  1. http://ltvsquad.com/2008/09/22/fing-mirror-image/
  2. http://ltvsquad.com/2015/11/04/abandoned-63rd-street-platform-mezzanine-circa-2004/
  3. "mta.info – Capital Programs Second Avenue Subway". mta.info.
  4. "MTA | Press Release | NYC Transit | MTA Advances Work On Second Avenue Subway Service". www.mta.info. Retrieved 2016-02-19.
  5. Bennett, Charles G. (May 25, 1963). "61st St. Tunnel to Queens Sped". The New York Times. p. 1. Retrieved October 20, 2011.
  6. Bennett, Charles G. (October 18, 1963). "Subway Tunnel to Queens Voted". The New York Times. p. 1. Retrieved October 20, 2011.
  7. Knowles, Clayton (December 16, 1964). "Proposed Subway Tube Assailed As 'Nowhere-to-Nowhere' Link". The New York Times. p. 33. Retrieved October 20, 2011.
  8. Bennett, Charles G. (January 15, 1965). "63d Street Tube Approved By City; Hearing Heated". The New York Times. p. 1. Retrieved October 20, 2011.
  9. Witkin, Richard (February 29, 1968). "$2.9-Billion Transit Plan for New York Area Links Subways, Rails, Airport". The New York Times. p. 1. Retrieved October 20, 2011.
  10. King, Seth S. (September 21, 1968). "City Approves 2d Ave. Subway And 11 Other New Transit Lines". The New York Times. p. 1. Retrieved October 20, 2011.
  11. Burks, Edward C. (March 21, 1975). "Beame Trims Plan For New Subway". The New York Times. p. 1. Retrieved October 20, 2011.
  12. Burks, Edward C. (July 29, 1976). "New Subway Line Delayed 5 or 6 Years". The New York Times. p. 35. Retrieved October 20, 2011.
  13. 1 2 Lichtenstein, Grace (May 9, 1978). "Planned 40-Mile Queens Subway, Cut to 15, is Costly and Behind Time". The New York Times. p. 68. Retrieved October 20, 2011.
  14. 1 2 3 Kurlansky, Mervyn; Naar, John (1974). The Faith of Graffiti. New York: Praeger Publishers, Inc.
  15. http://www.slideshare.net/yjh0670/zooyork
  16. Andelman, David A. (October 11, 1980). "Tunnel Project, Five Years Old, Won't Be Used". The New York Times. p. 25. Retrieved October 20, 2011.
  17. Daley, Suzanne (December 15, 1980). "MTA Votes to Extend 63rd St. Line". The New York Times. p. 25.
  18. Daley, Suzanne (June 28, 1985). "63d St. Subway Tunnel Flawed; Opening Delayed". The New York Times. p. 1. Retrieved October 20, 2011.
  19. Schmaltz, Jeffrey (August 18, 1985). "U.S. Holds Up Aid For Subway Work". The New York Times. p. 1. Retrieved October 20, 2011.
  20. "63rd Street Subway Tunnel: More Setbacks for a Troubled Project," New York Times, November 1st, 1984, page B1.
  21. 1 2 3 4 5 Burks, Edward C. (June 6, 1976). "Shortage of U.S. Funds May Delay Subway Link". The New York Times. Retrieved 27 September 2015.
  22. 1 2 3 4 5 Burks, Edward C. (July 29, 1976). "New Subway Line Delayed 5 or 6 Years". The New York Times. Retrieved 27 September 2015.
  23. 1 2 3 4 5 Burks, Edward C. (September 24, 1976). "Coming: Light at End of 63d St. Tunnel". The New York Times. Retrieved 27 September 2015.
  24. 1 2 3 4 5 Burks, Edward C. (August 7, 1976). "New York Improving Subway, But Still Trails Foreign Cities". The New York Times. Retrieved 27 September 2015.
  25. Levine, Richard (February 7, 1987). "M.T.A. Proposes Opening 63d Street Tunnel in '89". The New York Times. Retrieved October 20, 2011.
  26. Connelly, Mary; Douglas, Carlyle C. (June 28, 1987). "New Money Gives 63d Street Tunnel Somewhere To Go". The New York Times. Retrieved October 20, 2011.
  27. 1 2 3 Darlington, Peggy. "IND 6th Ave./63rd St. Line". www.nycsubway.org. Retrieved October 20, 2011.
  28. Lorch, Donatella (October 29, 1989). "The 'Subway to Nowhere' Now Goes Somewhere". The New York Times. Retrieved October 20, 2011.
  29. Joe Korman (November 12, 2011). "The JoeKorNer Brochures". Retrieved June 5, 2013.
  30. "E,F Detour in 2001, F trains via 63 St, E no trains running, take R instead". The Subway Nut. Retrieved October 20, 2011.
  31. 1 2 "Tunneling for Second Avenue Subway Complete". Metropolitan Transportation Authority. September 22, 2011. Retrieved November 10, 2011.
  32. "MTA | Press Release | NYC Transit | MTA Advances Work On Second Avenue Subway Service". www.mta.info. Retrieved 2016-02-19.
  33. "Second Avenue Subway Final Environmental Impact Statement (FEIS): Executive Summary, page 3" (PDF). mta.info. Metropolitan Transportation Authority (New York). Retrieved March 6, 2016.

External links

Route map: Bing / Google

This article is issued from Wikipedia - version of the Saturday, April 30, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.