Albula Tunnel

Albula Tunnel

Northern portal of the Albula Tunnel at Preda.
Overview
Line Albula Railway
Location Albula, Graubünden, Switzerland
Coordinates 46°34′30″N 9°48′32″E / 46.57500°N 9.80889°E / 46.57500; 9.80889Coordinates: 46°34′30″N 9°48′32″E / 46.57500°N 9.80889°E / 46.57500; 9.80889
Status Open
System Rhaetian Railway
Operation
Work begun 1898
Opened 10 July 1904 (1904-07-10)
Owner Rhaetian Railway
Operator Rhaetian Railway
Traffic Train
Character Passenger and freight
Technical
Length 5,865 m (19,242 ft)
No. of tracks Single track
Track gauge 1,000 mm (3 ft 3 38 in)
Electrified Overhead catenary,
11 kV AC 16 2/3 Hz
Highest elevation 1,820 m (5,970 ft)
above sea level
Preda station and the northern tunnel portal.
Mountain overlay above the Albula Tunnel.
View from a southbound train leaving the tunnel at Spinas.

The Albula Tunnel is the centrepiece of the Albula Railway, which forms part of the Rhaetian Railway network, in the Canton of Graubünden, Switzerland. With its maximum elevation of 1,820 m (5,970 ft) above sea level, it is, after the Furka Tunnel, the second highest alpine tunnel in Switzerland, and has a mountain overlay of up to 950 m (3,120 ft). The tunnel has a length of 5,865 m (19,242 ft).[1]

The northern portal of the tunnel is at Preda, in Bergün, and the southern portal at Spinas, in the Bever valley. At a total length of 5,865 m (19,242 ft), the tunnel connects the Albula Valley with the Engadin Valley, and, in so doing, passes under the watershed between the Rhine and the Danube a few kilometres west of the Albula Pass.

The tunnel serves both passenger and freight traffic. The Glacier Express passes through it daily. Until 2011 during the Winter car transporter trains operating between Thusis and Samedan also used the tunnel.

History

The construction of the tunnel caused unusual problems. The cold, 6 °C, water outflows transformed the already fractured rock into a pulpy mass, regularly clogging up the shell of the northern tunnel lead (or adit). At the same time, a strong water source above the northern tunnel portal dried up. The water streaming in at 300 L per second had to be painstakingly diverted with pipelines. As a result, construction virtually came to a standstill: in the ten weeks from May 1900, only two metres of tunnel were driven. These difficulties could not be overcome by the head construction contractor Ronchi & Carlotti, which went into bankruptcy.

From 1 April 1901, the Rhaetian Railway took the construction work into its own hands. With the use of a bonus system, it was able to regain part of the lost time. At 03:00 hours on 29 May 1902, the breakthrough of the two tunnel leads was achieved, at a point 3,030.5 m (9,943 ft) from the north portal, and 2,835 m (9,301 ft), from the south portal.

The tunnel cost 7,828,000 Swiss francs to build. A total of 1,316 people were employed in its construction. Overall, there were 16 fatal accidents involving tunnel workers, and at the Preda station there is a stone memorial to commemorate the victims.

In June 2009, the Rhaetian Railway announced that it was conducting investigations into either fundamental modernisation or reconstruction of the tunnel.[2] With the result of a new tunnel only costing about CHF 260m, RhB decided to go this way as there are several advantages. The first is being able to use the old tunnel during the construction of the new tunnel avoiding a longer closure of the line. And the second is that the old tunnel will be a rescue bore for the new tunnel. In December 2012 RhB handed over the plans for approval to the Federal Office of Transport. Work could start about 2014.

Sources, further reading

Notes

  1. Eisenbahnatlas Schweiz. Verlag Schweers + Wall GmbH. 2012. p. 38. ISBN 978-3-89494-130-7.
  2. RhB studies Albula tunnel replacement Railway Gazette International

References

This article is based upon a translation of the German language version of November 2009.