The Siemens ACS-64, or Amtrak Cities Sprinter, is an electric locomotive designed by Siemens Mobility for use in the northeastern United States. The first 70 locomotives built are to operate on the Northeast Corridor (NEC) and the Keystone Corridor, replacing the railroads' existing fleet of AEM-7 and HHP-8 locomotives.[9] The first Amtrak ACS-64 entered service in February 2014; deliveries will last until 2015. SEPTA Regional Rail will receive 13 locomotives (with an option to purchase 5 additional units) for commuter service in 2018.
Design
The design is based on the EuroSprinter and the Vectron platforms, which Siemens sells in Europe and Asia.[10] Significant structural changes to the design were made to comply with American crashworthiness requirements, including the addition of crumple zones and anti-climbing features as well as structural strengthening of the cab, resulting in a heavier locomotive than the previous models.[7][4] The body is a monocoque structure with integral frames and sidewalls.[4]
The locomotives are able to operate from the 25 kV 60 Hz, 12.5 kV 60 Hz, and 12 kV 25 Hz power supplies used on the Northeast Corridor, and have a maximum power of 6,400 kilowatts (8,600 hp).[10] The locomotives are designed to be capable of accelerating 18 Amfleet cars to maximum speeds as high as 125 mph (201 km/h) on the Northeast Corridor in a little over eight minutes,[11] with trains of eight Amfleets taking two and a half minutes to reach the same speed.[12] They have advanced safety systems, including specialized couplers designed to keep trains from rolling over, jackknifing, or derailing during a collision.[13] Additionally, the new locomotives are more energy-efficient than those that they replace, and lack dynamic braking grids in favor of 100% regenerative braking, depending on grid receptiveness. Energy generated from the brake may also be utilized to meet HEP needs, further reducing current draw from the grid.[13]
Each locomotive has two electrical converter units with three IGBT based, water cooled output inverters per converter. Two of the inverters power the traction motors; the third unit supplies head-end and auxiliary power.[4] The HEP/auxiliary inverters are dual-redundant and identical (rated 1,000 kW or 1,300 hp), allowing the locomotive to remain in service should one inverter fail en route.[11] The locomotive bogies are fabricated steel designs, with low-lying traction links and center pivot pin. The traction motors are frame-mounted, with torque transmitted via a hollow shaft drive. Locomotive braking is facilitated by cheek mounted disc brakes on each wheel.[4]
In order to comply with "Buy American" laws, the locomotives are being manufactured at Siemens' factory in Florin, California, with traction and electrical equipment being manufactured at Siemens facilities in Norcross and Alpharetta, Georgia.[7] Traction inverters are manufactured in Alpharetta, and the traction motors and gear units are manufactured in Norwood, Ohio.[6]
Amtrak order
Procurement
In October 2010, Amtrak ordered 70 locomotives at a cost of US$466 million, to be delivered beginning in February 2013.[14] The order was the second part of Amtrak's company-wide fleet-replacement program, after an order for 130 Viewliner II passenger cars was placed in July 2010. On June 30, 2011, US Secretary of Transportation Ray LaHood announced that Amtrak had received a US$562.9 million loan from the federal government's Railroad Rehabilitation and Improvement Financing program for the new locomotives.[15] The additional funding over and above the $466 million will cover capital spare parts and facility improvements to accommodate the ACS-64s.
Amtrak and Siemens Mobility unveiled the first three completed locomotives on May 13, 2013. They were tested during the summer of 2013: Nos. 600 and 601 at the Transportation Technology Center in Pueblo, Colorado, and No. 602 on the NEC.[16][17]
On February 6, 2014, Vice President Joseph R. Biden visited 30th Street Station in Philadelphia to tour ACS-64 #600. In his subsequent remarks he stressed the importance of infrastructure investment as well as the important role Amtrak's new locomotives will play in serving the critical artery of the Northeast Corridor.[18]
Service
Unit 600 entered service on February 7, 2014, on Northeast Regional train 171 from Boston to Washington, D.C. Deliveries will proceed at a rate of three per month until the final locomotives are delivered in 2015.[19] As the new locomotives enter service, they will gradually displace the electric locomotives that Amtrak currently uses. The extra six ACS-64 units will be used to increase the number of locomotives available for use at any point, and to add more frequent service in the future.[9]
In May 2015, ACS-64 No. 642 was painted in a red "Salute our Veterans" scheme, similar to a previous scheme on P42DC diesel locomotive #42.[20]
On May 12, 2015, No. 601 was pulling Northeast Regional No. 188 when it derailed at Frankford Junction in the Port Richmond section of Philadelphia due to excessive speed on a restricted curve.[21][22]It is currently unknown if this unit will return to service or be written off and scrapped.
On April 3, 2016, No. 627 pulling the Palmetto hit a backhoe on the track and derailed in Chester, Pa, killing 2 trackside workers.[23][24] The locomotive was severely damaged on the front.
In November 2014, Amtrak named ACS-64 No. 600 the David L Gunn in honor of the longtime transportation official who has served at many agencies.
SEPTA order
In May 2015, SEPTA (Southeastern Pennsylvania Transportation Authority) approved an order for 13 ACS-64 locomotives for commuter service to replace its 7 AEM-7 and single ALP-44 locomotives on push-pull express trains, with an option for an additional five locomotives to be added to the order. The total contract value, including the option locomotives, is worth $154,394,083. They are scheduled for delivery in 2018.[25][26] On November 11, 2015, Siemens announced that it been awarded the $118 million contract for the initial 13 locomotives.[27][28]
On February 29, 2016, unit 664, which is an Amtrak unit, started going on test runs on SEPTA Regional Rail Branches to test the height of the locomotives on SEPTA territory, and to make sure it has clearance through the Center City tunnels, which run outside of 30th Street Station to slightly beyond Jefferson Station. After testing the unit on most of SEPTA's lines, it was returned to Amtrak on March 21 2016 for completion of its acceptance testing.
References
- ↑ "DOT Announces $562.9 Million Amtrak Loan for 70 Locomotives to Run on Northeast Corridor (Archived)". United States Department of Transportation. June 29, 2011. Archived from the original on 8 July 2011.
- ↑ "ACS-64 Amtrak Cities Sprinter Electric Locomotive" (PDF). Siemens. October 2012. Retrieved 4 March 2014.
- ↑ Amtrak (February 15, 2011). "PRIIA Specifications for single level cars" (PDF). Retrieved November 4, 2013.
- 1 2 3 4 5 Latour, Michael (September 2011). "A new face in the Northeast Corridor". Railway Gazette International 167 (9).
- ↑ "Siemens AG bags $466-mn order from US railroad company Amtrak". domain-b.com. October 29, 2010. Retrieved November 4, 2013.
- 1 2 "ACS-64 InfoGraphic and Fact Sheet" (PDF). Siemens. Retrieved 4 March 2014.
- 1 2 3 "Amtrak orders Siemens 200 km/h Cities Sprinter locomotives". Railway Gazette International. October 29, 2010. Archived from the original on November 1, 2010. Retrieved October 30, 2010.
- ↑ "Amtrak City Sprinter Class ACS64 Electric Locomotive For Amtrak’s North East Corridor (NEC) High Speed Passenger Service" (PDF). Siemens AG Infrastructure & Cities Sector Rail Systems Division. Retrieved December 24, 2013.
- 1 2 "Amtrak contracts Siemens to supply 70 electric locomotives". Progressive Railroading. October 29, 2010. Retrieved October 29, 2010.
- 1 2 "Siemens breaks into the U.S. long-distance passenger rail market". www.infrasite.net. October 29, 2010. Retrieved October 30, 2010.
- 1 2 Michael Latour (June 2011). "Amtrak ACS-64: Speed, power, efficiency". Railway Age.
- ↑ "In-cab video of 601 + 8 Amfleets performing an acceleration test at Pueblo, CO". Youtube.com. August 1, 2013.
- 1 2 "Amtrak orders 70 new electric locomotives from Siemens". Trains. October 29, 2010. Retrieved October 30, 2010.
- ↑ "AMTRAK AWARDS $466 MILLION CONTRACT FOR 70 NEW ELECTRIC LOCOMOTIVES" (PDF). Amtrak. 29 October 2010.
- ↑ "Amtrak receives $562.9m loan to purchase 70 locomotives for Northeast Corridor". Rail.co. June 30, 2011. Archived from the original on June 30, 2011. Retrieved July 1, 2011.
- ↑ Siemens USA. "Siemens Provides First Look at New Amtrak Locomotives". Synaptic Digital. Retrieved November 4, 2013.
- ↑ Amtrak (May 13, 2013). "AMTRAK UNVEILS ADVANCED TECHNOLOGY LOCOMOTIVES FOR NORTHEAST SERVICE; Siemens-built equipment to improve reliability, efficiency and mobility" (PDF). Retrieved November 4, 2013.
- ↑ Matheson, Kathy (6 February 2014). "Biden stresses infrastructure investment in Philly". Associated Press. Retrieved 25 February 2014.
- ↑ "NEW AMTRAK LOCOMOTIVES READY FOR SERVICE AND SET TO POWER NORTHEAST ECONOMY" (PDF) (Press release). Amtrak. 6 February 2014. Retrieved 4 March 2014.
- ↑ "Second Amtrak veterans' locomotive in-transit to Northeast". Train Magazine. 18 May 2015. Archived from the original on 3 July 2015. Retrieved 3 July 2015 – via Trains Magazine Newswire. (subscription required (help)).
- ↑ Nussbaum, Paul (13 May 2015). "At least 5 dead as Amtrak train derails in Port Richmond". The Philadelphia Inquirer. Retrieved 13 May 2015.
- ↑ Melissa Gray (16 May 2015). "Amtrak installs speed controls at fatal crash site". CNN.
- ↑ http://www.msn.com/en-us/news/us/amtrak-train-slams-into-backhoe-injuries-reported/ar-BBrhZUj?li=BBnb7Kz
- ↑ Stamm, Dan (April 3, 2016). "2 Die as Amtrak Train Strikes Backhoe Causing Fireball". NBC Philadelphia. Retrieved April 3, 2016.
- ↑ Nussbaum, Paul (May 27, 2015). "SEPTA plans to spend $154 million on new locomotives". The Philadelphia Inquirer. Archived from the original on 28 May 2015. Retrieved 29 May 2015.
- ↑ "May 2015 Special Agenda" (PDF). Southeastern Pennsylvania Transportation Authority. May 2015. Retrieved 3 July 2015.
- ↑ Worrell, Carolina (November 11, 2015). "Siemens to build new locomotives for SEPTA". www.railwayage.com.
- ↑ Siemens USA (November 11, 2015). "Siemens to build 13 electric locomotives for the Southeastern Pennsylvania Transportation Authority".
External links
Wikimedia Commons has media related to Siemens ACS-64 locomotives. |
- Official Siemens USA Page on the locomotives; includes locomotive location tracking feature.
- Raw footage of high speed testing at Pueblo.
|