Trams in Antwerp

Antwerp tramway network

A PCC tram in Antwerp, 2009.
Operation
Locale Antwerp, Belgium
Horsecar era: 1873 (1873)–ca. 1902 (1902)
Status Converted to electricity
Operator(s) Eight separate companies
Track gauge 1,000 mm (3 ft 3 38 in)
Propulsion system(s) Horses
Electric tram era: since 1902 (1902)
Status Operational
Lines 13
Operator(s) Compagnie générale des tramways d'Anvers (CGTA) (1902–1927)
Société anonyme des Tramways d'Anvers (1927–1962)
Maatschappij voor het Intercommunaal Vervoer te Antwerpen (MIVA) (1963–1991)
De Lijn (since 1991)
Track gauge 1,000 mm (3 ft 3 38 in)
Propulsion system(s) Electricity
Electrification 600 V DC
Network 2015.
Website De Lijn (English)

The Antwerp tramway network (Dutch: het Antwerpse tramnet) is a network of tramways forming part of the public transport system in Antwerp, a city in the Flemish region of Belgium. The network is operated by the Flemish region's transportation company De Lijn. As of 2015, it featured thirteen lines, seven of which pass partially underground (known as Antwerp Pre-metro).

General description

Antwerp tram system features segment of different characteristics, from following along with street traffic to underground tunnels, which do not differ much from subway rail setup — 1,000 mm (3 ft 3 38 in) track gauge, 600 volts catenary power feed.

Horse trams, and Omnibus

Horse-drawn trams were the predecessor of nowadays electric trams. The first order for the existence of the «American Tram» (fr. Tramway Américain), as the horse tram was referred that time, was addressed to the citywide proprietors Ed. Paujaurd’hui and A. Edvard still on June 27, 1865, however just 6 years later (March 14, 1871) city council allowed the construction of tram lines. The first horse tram line opened in Antwerp on May 25, 1873. It linked church in Berchem district with Meir avenue in the city center.

Nine years later, there were already 9 lines of horse-drawn tram in Antwerp. There was also one omnibus route there. The public transport of Antwerp was exploited by 9 different companies. One of them operated omnibus, other eight — various horse tram routes.

Electrification

The work permit for electrifying the tram system was granted by CGTA on March 12, 1902 just after half year form applying. (November 22, 1901). Along with electrification it was planned to rebuild lines from 1,435 mm (4 ft 8 12 in) gauge to 1,000 mm (3 ft 3 38 in).

The works started on the omnibus route Draakplaats — Grote Markt (now - route № 11). In fact this is the first tram line which stated to work, since omnibuses are road transport, rather than rail transport. Therefore there were no infrastructure built before electrifying this line.

On May 6, 1902 along the way of the former omnibus route, tracks were laid, from Draakplaats to Nieuwstraat. After that the tracks started to be rebuilt along with the electrification of the horse drawn line on the boulevard ring (Leien). For a time of work, omnibuses which became unused temporarily replaced horse drawn cars. On July 9, 1902 horse drawn cars started to move on a former omnibus route segment from Nieuwstraat to Grote Markt.

The first gantry for an electric tram line was installed on June 10, 1902 on the Kunstlei boulevard (now Frankrijklei), between the crossing of streets De Keyserlei Gemeenteplaats (Fr. Rooseveltplaats). On August 13, 1902 the catenary was connected to the temporary electric power substation, which was erected in a tram depot on Boudewijnstraat. Then the electric tram test rides started. The normal operation of an electric tram started on September 2, 1902 . First there was a mix of electric trams and horse cars on the line. And then, the horse-drawn trams left the boulevards of Antwerp - forever.

Tram lines

line route journey time* average speed*
2 Merksem (Keizershoek P&R) – Hoboken (Kioskplaats) 46 min ? km/h
3 Zwijndrecht (Melsele Krijgsbaan) – Merksem (Keizershoek P&R) 40 min 22 km/u
4 Hoboken (Kioskplaats) – Silsburg 16/29 min** ? km/h
5 Wijnegem – Linkeroever (P&R) 37 min 26 km/h
6 Metropolis – Olympiade 35 min 17 km/h
7 Sint Pietersvliet – Mortsel (Gemeenteplein) 28 min 17 km/h
8 Astrid - Wommelgem P+R 15 min 24 km/h
9 Linkeroever (P&R) – Deurne (Eksterlaar) 26 min ? km/h
10 Melkmarkt – Wijnegem 30 min 17 km/h
11 Melkmarkt – Berchem Station 19 min ? km/h
12 Sportpaleis – Zuid – Groenplaats 25 min ? km/h
15 Linkeroever (P&R) – Boechout (P+R Capenberg) 44 min ? km/h
24 Hoboken (Schoonselhof) – Deurne (Silsburg) 50 min 15 km/h

Rolling stock

In August 2012, De Lijn ordered a fleet of Flexity 2 trams from Bombardier, including 28 for Antwerpen. These would replace many of the older PCC trams, and displace Hermelijn trams onto other routes.[1]

See also

References

This article is issued from Wikipedia - version of the Thursday, March 10, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.