Barmouth Junction and Arthog Tramway
Operation | |
---|---|
Locale | Arthog |
Open | August 1899 |
Close | August 1903 |
Status | Closed |
Infrastructure | |
Track gauge | 3 ft (914 mm) |
Propulsion system(s) | Horse |
Statistics | |
Route length | 2 miles (3.2 km) |
The Barmouth Junction and Arthog Tramway operated a 3 ft (914 mm) narrow gauge tramway service in Arthog between 1899 and 1903.[1]
History
The tramway was built by Solomon Andrews in 1899 as part of his scheme to develop Arthog as a holiday resort. It used the routes of previous tramways which had been constructed from the 1860s as part of quarrying operations.
The tramway connected Mawddach Crescent to Barmouth Junction railway station and other lines were built to local quarries to provide building material for the terraces of houses built as part of the holiday resort project.
Closure
The project failed and after the summer season in 1903 the tramway was closed, never to re-open. The single passenger car was transferred to the Pwllheli and Llanbedrog Tramway.