Billingham Biomass Power Station
| Billingham Biomass Power Station | |
|---|---|
|   Location of Billingham Biomass Power Station in County Durham | |
| Country | England | 
| Location | Billingham | 
| Coordinates | 54°35′13″N 1°15′40″W / 54.587°N 1.261°WCoordinates: 54°35′13″N 1°15′40″W / 54.587°N 1.261°W | 
| Status | Planned | 
| Owner(s) | Gaia Power | 
| Thermal power station | |
| Primary fuel | Biomass | 
| Power generation | |
| Nameplate capacity | 45 MW | 
Billingham Biomass Power Station is a planned biomass power station, that is to be built on the River Tees at Billingham. It is to be built on the site of the former coal-fired North Tees Power Station.[1] The station will have a generating capacity of 45 megawatts (MW).[2]
The station was granted planning permission in October 2009.[2] The construction of the power station will cost £200 million, and is expected to be completed by 2012. The project was initiated by Gaia Power, who chose Aker Solutions to develop the project.[3]
References
- ↑ "£200 million biomass plant wins planning approval". New Energy Focus. 16 October 2009. Retrieved 23 December 2010.
- 1 2 Blackburn, Mike (16 October 2009). "Billingham biomass power station to go ahead". nebusiness.com. Retrieved 23 December 2010.
- ↑ "Latest News" (PHP). Gaia Power. Retrieved 27 August 2011.
This article is issued from Wikipedia - version of the Monday, November 02, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.



