Holmside Hall Wind Farm
| Holmside Hall Wind Farm | |
|---|---|
|  The two turbines of Holmside Hall | |
|   Location of Holmside Hall Wind Farm in County Durham | |
| Country | England, United Kingdom | 
| Location | Stanley, County Durham | 
| Coordinates | 54°50′50″N 1°41′13″W / 54.8472°N 1.68694°WCoordinates: 54°50′50″N 1°41′13″W / 54.8472°N 1.68694°W | 
| Status | Operational | 
| Commission date | May 2004 | 
| Owner(s) | E.ON UK | 
| Wind farm | |
| Avg. site elevation | 722 ft | 
| Power generation | |
| Units operational | 2 × 2.75 MW | 
| Make and model | NEG Micon | 
| Nameplate capacity | 5.5 MW | 
Holmside Hall Wind Farm is a wind farm near Stanley, County Durham, England. Owned and operated by E.ON UK, the farm has a nameplate capacity of 5.5MW, containing two NM80 turbines each rated at 2.75 MW.[1]
At the time of construction, which was delayed due to high winds, the turbines were the largest and most powerful in the UK.[2]
References
- ↑ "UKWED Operational wind farms". RenewableUK. Retrieved 2010-08-02.
- ↑ "Ironically, wind conditions delay turbines". The Northern Echo. Newsquest Media Group. 2003-11-13. Retrieved 2009-11-11.
| 
 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 
 | ||||||||||||||||||||||||||||||||||||||||||||||
This article is issued from Wikipedia - version of the Thursday, December 31, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.




