Blaenau Ffestiniog railway station

Blaenau Ffestiniog National Rail

Blaenau Ffestiniog station is served by mainline standard gauge DMUs and narrow gauge trains of the Ffestiniog Railway
Location
Place Blaenau Ffestiniog
Local authority Gwynedd
Coordinates 52°59′41″N 3°56′18″W / 52.99460°N 3.93838°W / 52.99460; -3.93838Coordinates: 52°59′41″N 3°56′18″W / 52.99460°N 3.93838°W / 52.99460; -3.93838
Grid reference SH700458
Operations
Station code BFF
Managed by Arriva Trains Wales (Platform 1) / Ffestiniog Railway (Platforms 2 & 3)
Number of platforms 2 narrow gauge / 1 standard gauge
DfT category F1
Live arrivals/departures, station information and onward connections
from National Rail Enquiries
Annual rail passenger usage*
2002/03 35,441 (National Rail)
2004/05 25,700 (National Rail) Decrease
2005/06 23,553 (National Rail) Decrease
2006/07 19,272 (National Rail) Decrease
2007/08 36,569 (National Rail) Increase
2008/09 33,368 (National Rail) Decrease
2009/10 38,330 (National Rail) Increase
2010/11 42,726 (National Rail) Increase
2011/12 47,802 (National Rail) Increase
2012/13 44,638 (National Rail) Decrease
2013/14 44,828 (National Rail) Increase
2014/15 47,666 (National Rail) Increase
History
Original company Festiniog and Blaenau Railway
30 May 1868 Opened as Duffws[1]
1 November 1882 Closed[1]
10 September 1883 Re-opened and renamed as Blaenau Festiniog[2][1]
18 June 1951 Renamed Blaenau Festiniog Central[2]
4 January 1960 Closed[2]
21 March 1982 Joint British Rail/Ffestiniog station open as Bleanau Ffestiniog Central[3]
22 March 1982 Standard gauge (platform 1) opened
25 May 1982 Narrow gauge (platform 3) opened
???? Renamed Blaenau Ffestiniog[3]
National Rail – UK railway stations
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Blaenau Ffestiniog from Office of Rail and Road statistics. Methodology may vary year on year.
UK Railways portal

Blaenau Ffestiniog railway station serves the slate mining town of Blaenau Ffestiniog, Wales, and is the passenger terminus of the Conwy Valley Line from Llandudno Junction. Arriva Trains Wales operate through services to Llandudno Junction and Llandudno. The station is a joint station with the narrow gauge Ffestiniog Railway, which operates primarily tourist passenger services to Porthmadog throughout most of the year. A feature of the standard gauge service is the availability on trains and buses of the popular "Gwynedd Red Rover" day ticket.

Facilities

The standard gauge side comprises a single platform (Platform 1) opening directly on to the station car park and the High Street. There is a standard gauge run-round loop used by occasional locomotive hauled charter trains. The narrow gauge side comprises an island platform (Platforms 2 and 3) with an overall roof reached via a footbridge and also from the standard gauge platform and the town centre by a pedestrian level crossing at the terminal end. Narrow gauge trains normally use Platform 3. There is also a narrow gauge run-round loop.

History

Ffestiniog Railway

The first railway to be built in Blaenau Ffestiniog was the Festiniog Railway, which opened for slate traffic in 1836. The main line terminated at Dinas to the north west of the town (now buried under the spoil tip) with a branch line from a junction near Glanypwll to Duffws near the town centre. The first passenger trains ran from Porthmadog to Dinas on 6 January 1865 and the passenger station at Duffws opened in January 1866. Until 1870 alternate trains ran to Dinas and Duffws but by the end of 1870 Dinas passenger station had closed and all passenger services from then on terminated at Duffws.

An interchange station with the LNWR (known as Stesion Fein) was opened in 1881, and an interchange with the GWR opened in 1883.

In 1931, Duffws closed as a passenger station, and the GWR exchange station became the terminus.

The main Duffws station building survives as a grade 2 listed building, now serving as a public toilet block on the central car park.

Festiniog and Blaenau Railway

Meanwhile, the narrow gauge Festiniog and Blaenau Railway had opened from Llan Ffestiniog to Blaenau Ffestiniog on 29 May 1868. Its station was located where the FR foot access gate is now located. The line was initially worked by the Ffestiniog Railway and all slate traffic on the F&BR throughout its existence was carried in FR owned wagons. The FR and F&BR stations were both called Duffws although they were several hundred yards apart and passengers walked between the two. On 1 September 1882 the standard gauge Bala Ffestiniog Line reached the Llan Ffestiniog from the south. The following year the narrow gauge line was converted, with the station re-opening on 10 September 1883.[4]

Conwy Valley Line

The first standard gauge railway reached the town in 1879. It was the London and North Western Railway Conwy Valley Line from Llandudno Junction, which established its slate yards at the northern end of Blaenau Ffestiniog and built its passenger station near Glanypwll and across the road from the Ffestiniog Railway on which an interchange station was built in 1881. The LNWR had built this line in order to seek a share of the Ffestiniog slate traffic (including that then being carried by coastal steamer from Porthmadog to ports on the Irish sea and elsewhere). To this end they established a slate wharf at Deganwy and a feature of early LNWR operation of the line was the carriage of slate in narrow gauge wagons from Blaenau to Deganwy pick-a-back on standard gauge wagons.[5] So highly did the LNWR rate the commercial prospects of Blaenau Ffestiniog that in the 1880s they established their own hotel in the town, now demolished; it features on LNWR publicity of the period.

Bala Ffestiniog Line

The last major change in the 19th century was the construction of the Great Western Railway line from Bala to Llan Ffestiniog and the conversion of the Festiniog and Blaenau line to standard gauge in 1883. The Ffestiniog Railway provided an interchange platform adjoining the GWR station. From 1883 until 1930 there were therefore five railway passenger stations in use in Blaenau Ffestiniog (GWR, LNWR, FR Duffws, the FR-GWR interchange, and the FR-LNWR interchange Stesion Fein). Duffws station closed in 1931 and the two remaining FR stations closed at the outbreak of war in 1939. A feature of GWR operation of this line from 1883 to 1945 was the carriage of slate in narrow gauge wagons from Tanymanod to Blaenau (about ¾ mile) pick-a-back on standard gauge wagons.[5]

Post Second World War

Following nationalisation, the LMS (LNWR) station was renamed Blaenau Ffestiniog North and the GWR station became Blaenau Ffestiniog Central. The construction of the Tryweryn reservoir from 1958 brought the closure of the former GWR line to passengers on 2 January 1960 and to freight trains on 27 January 1961. Later, the construction of the Trawsfynydd nuclear power station in 1963 led to the extension of the Conwy Valley line to the Central station site in order to provide rail access to the power station. Passenger services continued to terminate at Blaenau Ffestiniog North.

Railways in the Blaenau Ffestiniog area

1982 consolidation

In 1982, with the completion of the rebuilding of the Festiniog Railway back to Blaenau Ffestiniog, the new Ffestiniog Railway/British Rail Joint Station was opened on the site of the Festiniog Railway/GWR Joint Station of 1883. British Rail trains first used the new station on 22 March 1982 and Festiniog Railway services to Blaenau Ffestiniog were resumed on 25 May 1982.[6]

The former LNWR "North" station on the Conwy Valley line was therefore closed. The FR Stesion Fein station was not rebuilt.

The new joint station was officially opened on 30 April 1983 by George Thomas, Speaker of the House of Commons, who unveiled a plaque at the station recording his visit. The Royal Oakeley Silver Band and the Brythoniaid Male Voice Choir led the celebrations.[7]

In 1990 the temporary wooden buildings on the narrow gauge island platform were replaced with new permanent masonry buildings. As part of these works, the platform 2 track was laid.

Plans for another rebuild, and construction of a modern joint station and facilities were drawn up in 2008, but the project did not receive the required finance.

Services

The standard gauge railway has six southbound arrivals & northbound departures Mon-Sat (approximately every three hours), with three trains each way on Sundays between May and early September.[8]

Gallery

References

Notes

  1. 1 2 3 Butt 1995, p. 84.
  2. 1 2 3 Butt 1995, p. 36.
  3. 1 2 Butt 1995, p. 37.
  4. Boyd, James I.C. (1988) [1972]. Narrow Gauge Railways in South Caernarvonshire - Volume 1. Headington, Oxford: The Oakwood Press. ISBN 0-8536-1365-6. OCLC 20417464. (pp 47-88)
  5. 1 2 Boyd, James I.C. (1988) [1972]. Narrow Gauge Railways in South Caernarvonshire - Volume 1. Headington, Oxford: The Oakwood Press. ISBN 0-8536-1365-6. OCLC 20417464. (p 68)
  6. News; Festiniog Railway Magazine (FR Society), No.97, Summer 1968 (Return to Blaenau!)
  7. News; Festiniog Railway Magazine (FR Society), No.101, Summer 1983 (Order! Order!)
  8. GB eNRT December 2015 Edition, Table 102 (Network Rail)

Sources

Further reading

External links

Wikimedia Commons has media related to Blaenau Ffestiniog railway station.
Wikimedia Commons has media related to Blaenau Ffestiniog LNWR station.
Wikimedia Commons has media related to Duffws railway station.
Preceding station   National Rail   Following station
Arriva Trains WalesTerminus
  Heritage railways
Tanygrisiau   Ffestiniog Railway   Terminus
Historical railways
Terminus   Festiniog and Blaenau Railway
narrow gauge 1868-1883
  Tan-y-Manod
Line and station closed
Terminus   Great Western Railway
Bala Ffestiniog Line 1883-1960
  Manod
Line and station closed
This article is issued from Wikipedia - version of the Wednesday, April 20, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.