Córdoba Metro

Córdoba Metro

Map of the current proposal for the system.
Overview
Owner Consorcio Metro Córdoba
Locale Córdoba, Argentina
Transit type Rapid transit
Number of lines 3 (proposed)
Number of stations 26 (proposed)
Technical
System length 32.9 km (20.4 mi) (proposed)
Track gauge 1,000 mm (3 ft 3 38 in)
(metre gauge)

The Córdoba Metro is a project that will, according to its proponents, serve the Argentine city of Córdoba. The metro system would become the second metro system in Argentina, after the Buenos Aires Underground. The project is currently in the planning and design phase.[1]

Background

On December 10, 2007, the Secretary of Transport and Traffic of the Argentine Municipality announced an initiative of the Iecsa/Gela companies to build an underground system in the City of Córdoba.[2] The announcement was made after a meeting with the Argentine Secretary of Transport, Ricardo Jaime[3] and, on December 14, the municipality commenced Technical and Financial Feasibility studies.

First proposal

The first proposed routes.

Finally on April 10, 2008, President Cristina Kirchner in a meeting with the mayor of the city of Córdoba, Daniel Giacomino confirmed the construction of the metro system.[4][5] In the meeting, the Argentine president also announced granting the adjudication of the high-speed rail to the French engineering giant, Alstom.[4] This original proposal was for a two line metro network comprising 15.8 kilometers (9.8 mi) of route.[5]

Depending on which vehicles would be selected and other factors, the total planned cost of the system is of nearly US$1.1 billion.[5][6] The preliminary design of the original project foresaw two principal lines. The first line would cross the city from west to south, over Colón and Duarte Quirós Avenues, up to Perón Boulevard, where it would reach the vicinity of the Mitre Railroad, near the bus terminal. The second line would run from north to south near the Ciudad Universitaria area, and under the Suquía river, continuing northwards to the Belgrano railway, near the Alta Córdoba train station. Plans were initially for the construction of 17 stations, 11 on the west-south line, and six in the south-north line.

However, an updated plan was announced in November 2010, with 29 stations on a 18.5 kilometers (11.5 mi) network built by China Railway International, costing US$1.8 billion.[7]

Second proposal

The project was redesigned again in 2012.[8] The redesigned project proposes a three line metro network consisting of 32.9 kilometers (20.4 mi) of route and 26 stations to be built by China Railway International and financed by a US$1.8 billion loan from China. Line A would run 10.7 kilometers (6.6 mi) from Colón Avenue in the west to Bajada de Piedra and serve 11 stations. An interchange would be provided at Maipú with the proposed 6.5-kilometer (4.0 mi) north-south Line B, which would run from Alta Córdoba near the Belgrano Railway station to Rontonda las Flores, and would serve 8 stations. Shortest of the three routes, Line C would run 5.6 kilometers (3.5 mi) east-west from Fuerza Aérea Avenue to Sabattini Avenue, paralleling Line A but further south, serving 7 stations.

The new redesigned project was approved by the municipality in 2012, however no date for the commencement of the works was given by the national government.[9] In November 2014, a member of the Radical Civic Union attempted to restart the project to get it back on track, however it was met with lukewarm responses from the national government.[10]

Construction features

Tunnel boring machines will be used for the construction. According to experts of the Lecsa company, since the construction work won't be done on the surface, the disadvantages of traffic complications would be avoided from the very beginning. The tunnels will be covered in 40 centimeters (16 in) thick prefabricated assembled units of concrete. The trains will have safety systems along the entire metro network.

See also

Wikimedia Commons has media related to Córdoba Metro.

References

  1. La Municipalidad, ansiosa por reactivar el proyecto del subte - CBA24n, 22 May 2012.
  2. "El municipio empieza a estudiar la factibilidad de un subte en Córdoba" [The municipality begins to study the feasibility of a subway in Cordoba]. LaVoz.com.ar (in Spanish). 15 December 2007. Retrieved 2014-04-26.
  3. "PROYECTO DE LEY. DECLARAR DE INTERES NACIONAL LA CONSTRUCCION DE SUBTERRANEOS EN LA CIUDAD CAPITAL DE LA PROVINCIA DE CORDOBA." [BILL. DECLARING A NATIONAL INTEREST IN THE CONSTRUCTION OF AN UNDERGROUND IN THE CAPITAL CITY OF THE PROVINCE OF CORDOBA.] (in Spanish). Argentine Chamber of Deputies. 26 September 2006. Retrieved 2014-04-26.
  4. 1 2 "Córdoba: La presidenta le prometió fondos a Giacomino para hacer el subte" [Córdoba: The president promised to fund the subway to Giacomino] (in Spanish). DERF Agencia de Noticias. 10 April 2008. Retrieved 2014-04-26.
  5. 1 2 3 "Córdoba private metro proposed". Railway Gazette. 16 April 2008. Retrieved 2014-04-26.
  6. "Sigue en análisis técnico el subte Córdoba" [Technical analysis on the Córdoba subway continues]. LaVoz.com.ar (in Spanish). 16 March 2008. Retrieved 2014-04-26.
  7. "Urban Rail News in Brief". Railway Gazette. 14 November 2010. Retrieved 2014-04-26.
  8. "Córdoba metro redesigned". Railway Gazette. 19 February 2012. Retrieved 2014-04-26.
  9. Subte: nueva traza, pero sin fecha de inicio - La Voz, 13 January 2012.
  10. Diputado radical busca reimpulsar proyecto del Subte de Córdoba - EnElSubte, 3 November 2014.
This article is issued from Wikipedia - version of the Sunday, February 28, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.