Cheon Wang Bong-class LST

Class overview
Name: Cheon Wang Bong class
Builders: Hanjin Heavy Industries, Hyundai Heavy Industries
Operators:  Republic of Korea Navy
Built: 2014 -
In service: 2014 - present
In commission: 2014 - present
Building: 3
Planned: 4
Completed: 1
Active: 1
General characteristics
Type: Landing Ship, Tank
Tonnage: 4,950 tons (empty) / 7,140 tons (full)
Length: 126.9 m (416 ft)
Beam: 19.4 m (64 ft)
Draught: 5.4 m (18 ft)
Installed power: 12,800 hp (9,500 kW)
Propulsion: CODAD, 4 × MAN 12V28/33D STC diesel engines rated at 5460 kW, 4 x 6L21/31 auxiliary engines rated 1,200 kW [1]
Speed:
  • 23 knots (43 km/h; 26 mph) maximum
  • 18 knots (33 km/h; 21 mph) cruising
Range: 8,000 nmi (15,000 km; 9,200 mi)
Boats & landing
craft carried:
2 x LCM
Troops: 700
Crew: 120
Sensors and
processing systems:
  • STX RadarSys SPS-100K surface search radar
  • LIG Nex1 SPS-540K 3D surveillance radar
Armament: 1 × Doosan DST 'No Bong' dual 40mm gun, 2 x K-VLS
Armor: LIG Nex1 SLQ-200K Sonata electronic warfare suite, Rheinmetall MASS decoy system[2]
Aviation facilities: Aft helicopter deck

The Cheon Wang Bong-class LST (Hangul:천왕봉) is an amphibious landing ship class of the Republic of Korea Navy.

Development

In the late 1980s the Republic of Korea Navy decided to gradually replace its aging fleet of World War II-era LST-542-class LSTs (renamed Un Bong-class LST)purchased from the US Navy in 1958. A three phase plan was laid out to develop new landing ships to meet the demands of modern amphibious and transport operations.

The first phase was designated as the LST-I project, and development and design started in 1987 by Korea Tacoma, currently Hanjin Heavy Industries. After 4 years of development, the lead ship Go Jun Bong (LST 681) was launched in 1991. Three more ships followed and all four ships were commissioned by 1998.

The second phase, or LST-II, was originally planned to import four Newport-class tank landing ships, but after being postponed due to budget issues, it was changed in favor for domestic built 4500-ton LPDs to be commissioned by 2013-2016.[3] After the construction of the first vessel, a follow-on contract for four additional vessels were awarded to Hyundai Heavy Industries in December 2013.[4]

Ships of class

 Name   Number   Builder   Launched   Commissioned   Decommissioned   Status 
Cheon Wang Bong (천왕봉) LST-686 Hanjin Heavy Industries 11 September 2013 1 December 2014
Cheon Ja Bong (천자봉) LST-687 Hyundai Heavy Industries 15 December 2015 2016 (Expected)
TBD LST-688 Hyundai Heavy Industries
TBD LST-689 Hyundai Heavy Industries

References

External links

Media related to Cheon Wang Bong class LSTs at Wikimedia Commons

This article is issued from Wikipedia - version of the Monday, February 15, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.