Edinburgh Park railway station
Edinburgh Park | |
---|---|
Location | |
Place | South Gyle |
Local authority | Edinburgh |
Coordinates | 55°55′39″N 3°18′28″W / 55.9276°N 3.3077°WCoordinates: 55°55′39″N 3°18′28″W / 55.9276°N 3.3077°W |
Grid reference | NT184712 |
Operations | |
Station code | EDP |
Managed by | Abellio ScotRail |
Number of platforms |
2 National Rail 2 Edinburgh Trams |
Live arrivals/departures, station information and onward connections from National Rail Enquiries | |
Annual rail passenger usage* | |
2004/05 | 0.295 million |
2005/06 | 0.353 million |
2006/07 | 0.368 million |
2007/08 | 0.383 million |
2008/09 | 0.434 million |
2009/10 | 0.452 million |
2010/11 | 0.519 million |
2011/12 | 0.646 million |
2012/13 | 0.816 million |
2013/14 | 0.960 million |
History | |
Key dates | Opened December 2003 |
National Rail – UK railway stations | |
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Edinburgh Park from Office of Rail and Road statistics. Methodology may vary year on year. | |
UK Railways portal |
Edinburgh Park railway station is a railway station in the west of Edinburgh, Scotland, serving the Edinburgh Park business park and the Hermiston Gait shopping centre. The station opened in December 2003 and is the first intermediate station between Haymarket and Linlithgow since 1951. Ticket Barriers came into use on 25 March 2015
There are two platforms, linked by a covered footbridge, which is accessible by either stairs or a lift. There is also a pedestrian underpass just outside the station, accessible from both platforms. Tickets are available from one of the two ticket machines.
Edinburgh Park station is on the edge of South Gyle, but should not be confused with South Gyle railway station which is a mile (two kilometres) away.
The railway through Edinburgh Park station was electrified (using overhead wires at 25 kV) in October 2010 as part of the Airdrie-Bathgate Rail Link project.
Edinburgh Trams
The Edinburgh Park tram stop (and the entire tram line) opened on 31 May 2014, the station then becoming a fully staffed rail/tram interchange. The tram stop is adjacent to the southern exit of the railway station.
The first tram (under test and without passengers) called at the stop on 8 October 2013.[1]
Services
Edinburgh to Dunblane, Milngavie and Helensburgh Central services call at the station, providing six trains an hour to Edinburgh city centre.
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Haymarket | Abellio ScotRail North Clyde Line |
Uphall | ||
Haymarket | Abellio ScotRail Edinburgh–Dunblane Line |
Linlithgow | ||
Preceding station | Edinburgh Trams | Following station | ||
Bankhead towards York Place |
York Place-Edinburgh Airport | Edinburgh Park Central towards Edinburgh Airport |
References
|
|