Hajipur-Muzaffarpur-Samastipur-Barauni Section
Hajipur-Muzaffarpur-Samastipur-Barauni Section | |
---|---|
Overview | |
Type | Passenger and Freight Train Line |
Status | Operational |
Locale | Bihar |
Termini |
Hajipur Barauni |
Stations | 27 |
Services |
|
Operation | |
Opened | 1886 |
Owner | Indian Railway |
Operator(s) | Indian Railway, East Central Railway |
Depot(s) | Hajipur and Garhara Yard station in Barauni junction |
Rolling stock | Diesel Locos: WDM-2, WDM-3A, WDS-5, WDP 4 and WDG 4 |
Technical | |
Line length | 157.37 km (98 mi) |
Track length | 304 km |
No. of tracks |
1 (electrified Hajipur-Muzaffarpur) 2(electrified Muzaffarpur -Barauni) |
Track gauge | Broad Gauge 1,676 mm (5 ft 6 in) |
Electrification |
25kV 50Hz AC OHLE (between 2011- December 2014)
|
Operating speed | up to 100 km/ h |
Highest elevation | 57 metres |
The Hajipur-Muzaffarpur-Samastipur-Barauni section is a railway line connecting Hajipur to Barauni Via Muzaffarpur ,Samastipur the Indian state of Bihar. The 157.37 km (98 mi) line passes through the plains of North Bihar and the Gangetic Plain in Bihar.
References
This article is issued from Wikipedia - version of the Friday, January 22, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.