Indian Railways

This article is about the organisation. For general information on railways in India, see Rail transport in India.
Indian Railways
Native name
भारतीय रेल
Bhāratīya Rail
Public sector undertaking
Industry Railways
Founded 16 April 1853 (1853-04-16)[1]
Headquarters New Delhi, India
Area served
India (also limited service to Nepal, Bangladesh , Pakistan, Myanmar )
Key people
Services Passenger railways
Freight services
Parcel carrier
Catering and Tourism Services
Parking lot operations
Other related services
Revenue Increase 1634.5 billion (US$24 billion) (2014–15)[2]
Profit Increase 157.8 billion (US$2.3 billion) (2013–14)[2]
Owner Government of India (100%)
Number of employees
1.334 million (2014)[3]
Parent Ministry of Railways through Railway Board (India)
Divisions 16 Railway Zones
Website www.indianrailways.gov.in
Indian Railways
Reporting mark IR
Locale India
Dates of operation 16 April 1853 (1853-04-16)Present
Track gauge 1,676 mm (5 ft 6 in)
1,000 mm (3 ft 3 38 in)
762 mm (2 ft 6 in)
610 mm (2 ft)
Headquarters New Delhi, India
Website www.indianrailways.gov.in

Indian Railways (reporting mark IR) is an Indian state-owned enterprise, owned and operated by the Government of India through the Ministry of Railways. It is one of the world's largest railway networks comprising 115,000 km (71,000 mi) of track over a route of 65,808 km (40,891 mi) and 7,112 stations.[3] In 2014-15, IR carried 8.397 billion passengers annually or more than 23 million passengers a day (roughly half of whom were suburban passengers) and 1058.81 million tons of freight in the year.[3] In 2014–2015 Indian Railways had revenues of 1634.50 billion (US$24 billion) which consists of 1069.27 billion (US$16 billion) from freight and 402.80 billion (US$6.0 billion) from passengers tickets.[2]

Railways were first introduced to India in the year 1853 from Mumbai to Thane. In 1951 the systems were nationalised as one unit, the Indian Railways, becoming one of the largest networks in the world. IR operates both long distance and suburban rail systems on a multi-gauge network of broad, metre and narrow gauges. It also owns locomotive and coach production facilities at several places in India and are assigned codes identifying their gauge, kind of power and type of operation. Its operations cover twenty nine states and seven union territories and also provides limited international services to Nepal, Bangladesh and Pakistan.

Indian Railways is the world's seventh largest commercial or utility employer, by number of employees, with over 1.376 million employees as of last published figures in 2013 . As for rolling stock, IR holds over 245,267 Freight Wagons, 66,392 Passenger Coaches and 10,499 Locomotives (43 steam, 5,633 diesel and 4,823 electric locomotives).[3] The trains have a 5 digit numbering system and runs 12,617 passenger trains and 7421 freight trains daily.[4] As of 31 March 2013, 21,614 km (13,430 mi) (32.8%) of the total 65,808 km (40,891 mi) route length was electrified.[5] Since 1960, almost all electrified sections on IR use 25,000 Volt AC traction through overhead catenary delivery.

History

India's first train run between Bombay and Thane
The B.B. & C.I. Railway Head Offices, 1905
Extent of the railway network in 1909.
Indian Railways headquarters, Delhi
Map of the completed and planned railway lines in India in 1871, thirteen years after the end of Company rule.

The history of rail transport in India began in the mid-nineteenth century. The core of the pressure for building Railways In India came from London. In 1848, there was not a single kilometer of railway line in India. The country's first railway, built by the Great Indian Peninsula Railway (GIPR), opened in 1853, between Bombay and Thane.[6] The East Indian Railway Company was established 1 June 1845 in London by a deed of settlement with a capital of £4,000,000, largely raised in London.[7] The Great Southern India Railway Co. was founded in Britain in 1853 and registered in 1859. Construction of track in Madras Presidency began in 1859 and the 80-mile link from Trichinopoly to Negapatam was opened in 1861. The Carnatic Railway founded in 1864, opened a Madras-Arakkonam-Conjeevaram line in 1865. The Great Southern India Railway Company was subsequently merged with the Carnatic Railway Company in 1874 to form the South Indian Railway Company.[8][9]

A British engineer, Robert Maitland Brereton, was responsible for the expansion of the railways from 1857 onwards. The Allahabad-Jabalpur branch line of the East Indian Railway had been opened in June 1867. Brereton was responsible for linking this with the GIPR, resulting in a combined network of 6,400 km (4,000 mi). Hence it became possible to travel directly from Bombay to Calcutta. This route was officially opened on 7 March 1870 and it was part of the inspiration for French writer Jules Verne's book Around the World in Eighty Days. At the opening ceremony, the Viceroy Lord Mayo concluded that "it was thought desirable that, if possible, at the earliest possible moment, the whole country should be covered with a network of lines in a uniform system".[10]

By 1875, about £95 million were invested by British companies in India.[11] By 1880 the network had a route mileage of about 14,500 km (9,000 mi), mostly radiating inward from the three major port cities of Bombay, Madras and Calcutta. By 1895, India had started building its own locomotives, and in 1896, sent engineers and locomotives to help build the Uganda Railways.

In 1900, the GIPR became a government owned company. The network spread to the modern day states of Assam, Rajputhana and Madras Presidency and soon various autonomous kingdoms began to have their own rail systems. In 1905, an early Railway Board was constituted, but the powers were formally vested under Lord Curzon.[12] It served under the Department of Commerce and Industry and had a government railway official serving as chairman, and a railway manager from England and an agent of one of the company railways as the other two members. For the first time in its history, the Railways began to make a profit.

In 1907 almost all the rail companies were taken over by the government. The following year, the first electric locomotive made its appearance. With the arrival of World War I, the railways were used to meet the needs of the British outside India. With the end of the war, the railways were in a state of disrepair and collapse. Large scale corruption by British officials involved in the running of these railways companies was rampant. Profits were never reinvested in the development of British colonial India.[13]

Interior of Gatiman Express.

In 1920, with the network having expanded to 61,220 km (38,040 mi),[14] a need for central management was mooted by Sir William Acworth. Based on the East India Railway Committee chaired by Acworth, the government took over the management of the Railways and detached the finances of the Railways from other governmental revenues.

The period between 1920 and 1929, was a period of economic boom; there were 41,000 mi (66,000 km) of railway lines serving the country; the railways represented a capital value of some 687 million sterling; and they carried over 620 million passengers and approximately 90 million tons of goods each year.[15] Following the Great Depression, the railways suffered economically for the next eight years. The Second World War severely crippled the railways. Starting 1939, about 40% of the rolling stock including locomotives and coaches was taken to the Middle East, the railways workshops were converted to ammunitions workshops and many railway tracks were dismantled to help the Allies in the war. By 1946, all rail systems had been taken over by the government.

Organisational structure

Indian Railway zonal map.

Railway zones

Indian Railways is divided into 16 zones,[16] which are further sub-divided into divisions. The number of zones in Indian Railways increased from six to eight in 1951, nine in 1966 and sixteen in 2003.[17][18] Each zonal railway is made up of a certain number of divisions, each having a divisional headquarters. There are a total of sixty-eight divisions.[19][20]

Each zone is headed by a general manager, who reports directly to the Railway Board. The zones are further divided into divisions, under the control of divisional railway managers (DRM). The divisional officers, of engineering, mechanical, electrical, signal and telecommunication, accounts, personnel, operating, commercial, security and safety branches, report to the respective Divisional Railway Manager and are in charge of operation and maintenance of assets. Further down the hierarchy tree are the station masters, who control individual stations and train movements through the track territory under their stations' administration.

Sr Name Abbr. Date Established Route km Headquarters Divisions Image
1 Southern Railway SR 14 April 1951 6844 Chennai Chennai, Tiruchirappalli, Madurai and Salem,[21] Palakkad, Thiruvananthapuram
2 Central Railway CR 5 November 1951 3905 Mumbai Mumbai CST, Bhusawal, Pune, Solapur and Nagpur
3 Western Railway WR 5 November 1951 6182 Mumbai Mumbai Central, Ratlam, Ahmedabad, Rajkot, Bhavnagar and Vadodara
4 Eastern Railway ER 14 April 1952 2414 Kolkata Howrah, Sealdah, Asansol and Malda Town
5 Northern Railway NR 14 April 1952 6968 Delhi Delhi, Ambala, Firozpur, Lucknow and Moradabad
6 North Eastern Railway NER 14 April 1952 3667 Gorakhpur Izzatnagar, Lucknow and Varanasi
7 South Eastern Railway SER 1955 2631 Kolkata Adra, Chakradharpur, Kharagpur and Ranchi
8 Northeast Frontier Railway NFR 15 January 1958 3907 Maligaon Alipurduar, Katihar, Rangia, Lumding and Tinsukia
9 South Central Railway SCR 2 October 1966 5951 Secunderabad Vijayawada, Secunderabad, Guntakal, Guntur, Hyderabad and Nanded
10 East Central Railway ECR 1 October 2002 3628 Hajipur Danapur, Dhanbad, Mughalsarai, Samastipur and Sonepur
11 North Western Railway NWR 1 October 2002 5459 Jaipur Jaipur, Ajmer, Bikaner and Jodhpur
12 East Coast Railway ECoR 1 April 2003 2677 Bhubaneswar Khurda Road, Sambalpur and Visakhapatnam
13 North Central Railway NCR 1 April 2003 3151 Allahabad Allahabad, Agra and Jhansi
14 South East Central Railway SECR 1 April 2003 2447 Bilaspur Bilaspur, Raipur and Nagpur
15 South Western Railway SWR 1 April 2003 3177 Hubballi Hubballi, Bengaluru, Mysuru and Gulbarga [22]
16 West Central Railway WCR 1 April 2003 2965 Jabalpur Jabalpur, Bhopal and Kota
A pantograph on an IR train.

Recruitment and training

Staff are classified into gazetted (Group 'A' and 'B') and non-gazetted (Group 'C' and 'D') employees.[23] The recruitment of Group 'A' gazetted employees is carried out by the Union Public Service Commission through exams conducted by it.[24] The Recruitment of Group 'B' for the following post Section Officers,Junior Engineers,Depot Material Superintendent posts is conducted by Railway Recruitment board.[25]The recruitment to Group 'C' and 'D' employees on the Indian Railways is done through 21 Railway Recruitment Boards and Railway Recruitment Cells which are controlled by the Railway Recruitment Control Board (RRCB).[26] The training of all cadres is entrusted and shared between six centralised training institutes.

CLW made WAP-5 30022(CLW made WAP-5 locos don't have fluted body shell) rests at Bhopal
WDP4 Diesel Locomotive Baaz which is now at New Jalpaiguri

.

Rolling stock

Locomotives

Main article: Locomotives in India
Two historical steam engines at water refilling station at Agra station
A Beyer Garratt 6594 Engine seen at the National Rail Museum

Locomotives in India consist of electric and diesel locomotives. The world's first CNG (Compressed Natural Gas) locomotives are also being used.[27] Steam locomotives are no longer used, except in heritage trains. In India, locomotives are classified according to their track gauge, motive power, the work they are suited for and their power or model number. The class name includes this information about the locomotive. It comprises 4 or 5 letters. The first letter denotes the track gauge. The second letter denotes their motive power, Diesel or Alternating current (Electric), and the third letter denotes the kind of traffic for which they are suited (goods, passenger, Multi or shunting). The fourth letter used to denote locomotives' chronological model number. However, from 2002 a new classification scheme has been adopted. Under this system, for newer diesel locomotives, the fourth letter will denote their horsepower range. Electric locomotives don't come under this scheme and even all diesel locos are not covered. For them this letter denotes their model number as usual.

A locomotive may sometimes have a fifth letter in its name which generally denotes a technical variant or subclass or subtype. This fifth letter indicates some smaller variation in the basic model or series, perhaps different motors, or a different manufacturer. With the new scheme for classifying diesel locomotives (as mentioned above) the fifth item is a letter that further refines the horsepower indication in 100 hp increments: 'A' for 100 hp, 'B' for 200 hp, 'C' for 300 hp, etc. So in this scheme, a WDM-3A refers to a 3100 hp loco, while a WDM-3D would be a 3400 hp loco and WDM-3F would be 3600 hp loco.

Note: This classification system does not apply to steam locomotives in India as they have become non-functional now. They retained their original class names such as M class or WP class.

Diesel Locomotives are now fitted with Auxiliary Power Units which saves nearly 88% of Fuel during the idle time when train is not running.[28]

Goods wagons

The number of goods wagons was 205,596 on 31 March 1951 and reached the maximum number 405,183 on 31 March 1980 after which it started declining and was 239,321 on 31 March 2012. The number is far less than the requirement and the Indian Railways keeps losing freight traffic to road. Indian Railways carried 93 million tonnes of goods in 1950–51 and it increased to 1010 million tonnes in 2012–13.[29]

However, its share in goods traffic is much lower than road traffic. In 1951, its share was 65% and the share of road was 35%. Now the shares have been reversed and the share of railways has declined to 30% and the share of road has increased to 70%.

Passenger coaches

Indian railways has several types of passenger coaches.

The coaches used in Indian Railways are produced at Integral Coach Factory, Rail Coach Factory; including the new LHB coaches.

Passenger coaches numbered 46,722 on 31 March 2012. Other coaches (luggage coach, parcel van, guard's coach, mail coach, etc.) numbered 6,560 on 31 March 2012.

Electric Multiple Unit (EMU) coaches are used for suburban traffic in large cities – mainly Mumbai, Chennai, Delhi, Kolkata, Pune, Hyderabad and Bangalore. These coaches numbered 7,793 on 31 March 2012. They have second class and first class seating accommodation.

Freight

Indian Railways earns about 70% of its revenues from freight traffic (₹686.2 billion from freight and ₹304.6 billion from passengers in 2011–12). Most of its profits come from transporting freight, and this makes up for losses on passenger traffic. It deliberately keeps its passenger fares low and cross-subsidises the loss-making passenger traffic with the profit-making freight traffic.

Since the 1990s, Indian Railways has stopped single-wagon consignments and provides only full rake freight trains

Wagon types include:[30]

Track and gauge

Indian railways uses four gauges, the 1,676 mm (5 ft 6 in) broad gauge which is wider than the 1,435 mm (4 ft 8 12 in) standard gauge; the 1,000 mm (3 ft 3 38 in) metre gauge; and two narrow gauges, 762 mm (2 ft 6 in) and 610 mm (2 ft). Track sections are rated for speeds ranging from 75 to 160 km/h (47 to 99 mph).

The total length of track used by Indian Railways is about 115,000 km (71,000 mi) while the total route length of the network is 65,000 km (40,000 mi).[31] About 24,891 km (15,467 mi) or 38% of the route-kilometre was electrified, as of 31 March 2014.[32]

The image shows still surviving meter gauge tracks in Gujarat, India
Narrow Gauge Train at Rajim, Chhattisgarh

Broad gauge is the predominant gauge used by Indian Railways. Indian broad gauge1,676 mm (5 ft 6 in)—is the most widely used gauge in India with 108,500 km (67,400 mi) of track length (94% of entire track length of all the gauges) and 59,400 km (36,900 mi) of route-kilometre (91% of entire route-kilometre of all the gauges).

In some regions with less traffic, the metre gauge (1,000 mm (3 ft 3 38 in)) is common, although the Unigauge project is in progress to convert all tracks to broad gauge. The metre gauge has about 5,000 km (3,100 mi) of track length (4% of entire track length of all the gauges) and 4,100 km (2,500 mi) of route-kilometre (7% of entire route-kilometre of all the gauges).

The Narrow gauges are present on a few routes, lying in hilly terrains and in some erstwhile private railways (on cost considerations), which are usually difficult to convert to broad gauge. Narrow gauges have 1,500 route-kilometre. The Kalka-Shimla Railway, the Kangra Valley Railway and the Darjeeling Himalayan Railway are three notable hill lines that use narrow gauge, but the Nilgiri Mountain Railway is a metre gauge track.[33] These four rail lines will not be converted under the Unigauge project.

Map of Indian Railways network with population density

The share of broad gauge in the total route-kilometre has been steadily rising, increasing from 47% (25,258 route-km) in 1951 to 86% in 2012 whereas the share of metre gauge has declined from 45% (24,185 route-km) to 10% in the same period and the share of narrow gauges has decreased from 8% to 3%. About 24,891 route-km of Indian railways is electrified.

Sleepers (ties) are made up of prestressed concrete, or steel or cast iron posts, though teak sleepers are still in use on a few older lines. The prestressed concrete sleeper is in wide use today. Metal sleepers were extensively used before the advent of concrete sleepers. Indian Railways divides the country into four zones on the basis of the range of track temperature. The greatest temperature variations occur in Rajasthan.

Research and development

Indian Railways has a full-fledged organisation known as Research Designs and Standards Organisation (RDSO), located at Lucknow for all research, designs and standardisation tasks.

In August 2013, Indian Railways entered into a partnership with Indian Institute of Technology (Madras) to develop technology to tap solar energy for lighting and air-conditioning in the coaches. This would significantly reduce the fossil fuel dependency for Indian Railways.[34]

Recently it developed and tested the Improved Automated Fire Alarm System in Rajdhani Express Trains. It is intended that the system be applied to AC coaches of all regular trains.[35]

Current and future developments

Eastern end of longest platform in Kollam Junction railway station in India. This is the world's second longest railway platform

In recent years, Indian Railways has undertaken several initiatives to upgrade its ageing infrastructure and enhance its quality of service. The Indian government plans to invest 905000 crore (US$134 billion) to upgrade the railways by 2020.[36] Indian Railways is refurbishing 12-15 year old coaches at Carriage Rehabilitation Workshop in Bhopal to enhance passenger amenities and fire safety measures.[37][38]

Bio-Toilets on railways

In 2014, Indian Railways and DRDO developed a bio-toilet to replace direct-discharge toilets, which are currently the primary type of toilet used in railway coaches. The direct discharge of human waste from trains onto the tracks corrodes rails, costing Indian Railways tens of millions of rupees a year in rail-replacement work. Flushing a bio-toilet discharges human waste into an underfloor holding tank where anaerobic bacteria remove harmful pathogens and break the waste down into neutral water and methane. These harmless by-products can then be safely discharged onto the tracks without causing corrosion or foul odours.[39] As part of its "Swachh Rail-Swachh Bharat" ("Clean Rail-Clean India") programme, Indian Railways plans to completely phase out direct-discharge toilets on its lines by 2020-2021. As of March 2015, 17,338 bio-toilets had been installed on newly built coaches, with all new coaches to have bio-toilets from 2016; older rolling stock will be retrofitted.

Locomotive factories

In 2015, plans were disclosed for building two locomotive factories in the state of Bihar, at Madhepura (diesel locomotives) and at Marhowra (electric locomotives). Both factories involve foreign partnerships. The diesel locomotive works will be jointly operated in a partnership with General Electric, which has invested 2052 crore (US$305 million) for its construction, and the electric locomotive works with Alstom, which has invested 1293.57 crore (US$192 million). The factories will provide Indian Railways with 800 electric locomotives of 12,000 horse power each, and a mix of 1,000 diesel locomotives of 4,500 and 6,000 horsepower each.[40] In November 2015, further details of the 14656 crore (US$2 billion) partnership with GE were announced: Indian Railways and GE would engage in an 11-year joint venture in which GE would hold a majority stake of 74%. Under the terms of the joint venture, Indian Railways would purchase 100 goods locomotives a year for 10 years beginning in 2017; the locomotives would be modified versions of the GE Evolution series.[41] The diesel locomotive works will be built by 2018; GE will import the first 100 locomotives and manufacture the remaining 900 in India from 2019, also assuming responsibility for their maintenance over a 13-year period.[42] In the same month, a 20000 crore (US$3 billion) partnership with Alstom to supply 800 electric locomotives from 2018 to 2028 was announced.[36]

Links to adjacent countries

Existing rail links:

Under construction / Proposed links:

Types of passenger services

Trains are classified by their average speed.[46] A faster train has fewer stops ("halts") than a slower one and usually caters to long-distance travel.

S.no Train Description
1 Gatimaan Express It is a semi high speed train that runs between Delhiand Agra in India. It operates at a speed of 160 km/h (99 mph) and is the fastest train in India. The train will take a travel time of 100 minutes to cover 188 kilometres (117 mi) journey from Hazrat Nizamuddin to Agra Cantonment railway stations.
2 Shatabdi Express The Shatabdi trains are air-conditioned, intercity trains for travel during daytime. Unlike the Rajdhani or Duronto Expresses, all Shatabdi expresses, it makes a round trip on same day. The Bhopal Shatabdi Express (Train no: 12001/12002) is the fastest train in India, between New Delhi and Agra cantonment, this train travels at an average speed of 100kmph and touches top speed of 160 kmph. They have seats and executive class seats, Some also have 3-tier AC berth. They have limited stops. Indian Railway is planning to introduce Wi-Fi services, New Delhi - Kalka Shatabdi Express being first train for trials.[47]
3 Rajdhani Express These are air-conditioned trains linking major cities to New Delhi. They have high priority and are one of the fastest trains in India, travelling at a maximum speed of around 130–140 km/h (82 mph). They have limited stops. In the Railway budget of 2014, it was proposed that the speed of Rajdhani express, and Shatabdi Expresses would be increased up 180 km/h.
4 Duronto Express These are the non-stop (except for technical halts) point to point rail services introduced for the first time in 2009. They connect the metros and major state capitals of India and were introduced to travel as fast or faster than the Rajdhani Express. They provide first AC, two-tier AC and three-tier AC accommodation. Some of them provide non air-conditioned Sleeper Class accommodation.
5 AC Express These are fully air-conditioned trains linking major cities in the country. They have high priority and are one of the fastest trains in India, travelling at about 130 km/h (82 mph). They have limited stops.
6 Tejas Express Same as Shatabdi Express, these are fully air-conditioned single floor express trains. They have high priority and have limited stops. But unlike the Shatabdi Express these trains are sleeper trains used for long distance hauling.
7 Double Decker Express Same as Shatabdi Express, these are fully air-conditioned two floor express trains. They have high priority and are among fast trains in India. They have limited stops. These trains are used for daytime travel.
8 Uday Express Same as Double Decker Express, these are fully air-conditioned two floor express trains. They have high priority and have limited stops. These trains have berth facility and are used for night travel.
9 Jan Shatabdi Express Jan Shatabdi Express are more affordable variety of the Shatabdi Express, which have both AC and non-AC classes. The maximum speed is 130 km/h. They have fewer stops.
10 Garib Rath Air-conditioned no-frills trains with seats and 3-tier Economy AC berths. The maximum speed is 130 km/h. Some of them have AC Chair cars also.
11 Humsafar Express These are fully AC 3 tier coaches trains.
12 Sampark Kranti Express These are a series of trains which provide super fast Express-like connectivity to the national capital Delhi. These trains have higher priority than Super Express / Mail.
13 Yuva Express These trains were started along with Duronto Express trains to provide air conditioned travel to youth of the country. Sixty percent of the seats of these trains were reserved for passengers between 18 – 45 years of age. These trains did not enjoy much success. Today these trains only operate on the Delhi - Howrah and Delhi - Mumbai routes.
14 Kavi Guru Express These trains were introduced in honour of Rabindranath Tagore. Currently four pairs of these trains operate on the Indian Railways network.
15 Vivek Express These trains were introduced to commemorate the 150th birth Anniversary of Swami Vivekananda in 2013. Currently four pairs of Vivek Express run in the country.
16 Intercity Superfast Express/Mail These trains travel at a speed greater than 100–120 km/h (60-75 mph). Tickets for these trains have an additional superfast surcharge.
17 Rajya Rani Express These trains were introduced to connect state capitals to important cities in that state.
18 Express/Mails These are the most common kind of trains in India. They have more stops than their super-fast counterparts, but they stop only at relatively important intermediate stations.
19 Fast Passenger and Passenger These are slow trains that stop at most or every station along the route and are the cheapest trains. The trains generally have unreserved seating accommodation but some night trains have sleeper and 3-tier AC compartments. These trains travel at about 40-80 kmph.
20 Suburban trains These trains operate in the urban areas of Mumbai, Delhi, Kolkata, Chennai, Hyderabad, Ahmedabad, Pune and between Kanpur and Lucknow, usually stop at every stations and have unreserved seating accommodation.
21 Metro These trains are designed for city transport. Indian Railway constructed the first Kolkata Metro for the city of Kolkata. Now metro railway services are found in New Delhi and Bangalore also.
22 Antyodaya and Jan Sadharan Express These are fully non reserved trains. Antyodaya Express operates on peak routes. These trains are run to reduce the pressure on other trains on that route.
23 Mahamana Express It is the new version of coaches of Indian Railways with modern benefits and facilities. The livery of the train is also different from other train. It is a tri-weekly superfast train service which runs between the city of Varanasi andNew Delhi via Moradabad, Lucknow & Sultanpur Jaunpur city.
24 Tourist Trains Indian Railways also operate luxurious tourist trains like Palace on Wheels, Maharaja Express, The Golden Chariot, Royal Rajasthan on Wheels etc. Fairy Queen has also gained tourist attraction because it is the oldest steam engine in operation hauling a luxurious train from Delhi to Alwar.
25 Darjeeling Himalayan Railway The Darjeeling Himalayan Railway, also known as the "Toy Train", is a 2 ft(610 mm) narrow gauge railway that runs between New Jalpaiguri and Darjeeling in the Indian state of West Bengal, India. Built between 1879 and 1881. DHR was declared a World Heritage site by UNESCO in 1999.

Accommodation classes

Air-conditioned Chair Car (CC) coaches in an Shatabdi Express.

Indian Railways has several classes of travel with or without airconditioning. A train may have just one or many classes of travel. Slow passenger trains have only unreserved seating class whereas Rajdhani, Duronto, Shatabdi, garib rath and yuva trains have only airconditioned classes. The fares for all classes are different with unreserved seating class being the cheapest. The fare of Rajdhani, Duronto and Shatabdi trains includes food served in the train but the fare for other trains does not include food that has to be bought separately. In long-distance trains a pantry car is usually included and food is served at the berth or seat itself. Luxury trains such as Palace on Wheels have separate dining cars but these trains cost as much as or more than a five-star hotel room.

A standard passenger rake generally has four unreserved (also called "general") compartments, two at the front and two at the end, of which one may be exclusively for ladies. The exact number of other coaches varies according to the demand and the route. A luggage compartment can also exist at the front or the back. In some mail trains a separate mail coach is attached. Lavatories are communal and feature both the Indian style as well as the Western style.

The following table lists the classes in operation. A train may not have all these classes.

Class[48] Description[48][49]
1A First class AC: This is the most expensive class, where the fares are almost at par with air fare. There are eight cabins (including two coupes) in the full AC First Class coach and three cabins (including one coupe) in the half AC First Class coach. The coach has an attendant to help the passengers. Bedding is included with the fare in IR. This air conditioned coach is present only on popular routes and can carry 18 passengers (full coach) or 10 passengers (half coach). The sleeper berths are extremely wide and spacious. The coaches are carpeted, have sleeping accommodation and have privacy features like personal coupes. This class is available on broad gauge and metre gauge trains.
2A AC-Two tier: These air-conditioned coaches have sleeping berths across eight bays. Berths are usually arranged in two tiers in bays of six, four across the width of the coach and two berths longways on the other side of the corridor, with curtains along the gangway or corridor. Bedding is included with the fare. A broad gauge coach can carry 48 passengers (full coach) or 20 passengers (half coach). This class is available on broad gauge and metre gauge trains.
FC First class: Same as 1AC but without air conditioning. No bedding is available in this class. The berths are wide and spacious. There is a coach attendant to help the passengers. This class has been phased out on most of the trains and is rare to find. However narrow gauge trains to hill stations have this class.
3A AC three tier: Air conditioned coaches with 64 sleeping berths. Berths are usually arranged as in 2AC but with three tiers across the width and two longways as before giving eight bays of eight. They are slightly less well-appointed, usually no reading lights or curtained off gangways. Bedding is included with fare. It carries 64 passengers in broad gauge. This class is available only on broad gauge.
3E AC three tier (Economy): Air conditioned coaches with sleeping berths, present in Garib Rath Trains. Berths are usually arranged as in 3AC but with three tiers across the width and three longways. They are slightly less well-appointed, usually no reading lights or curtained off gangways. Bedding is not included with fare.
CC AC chair car: An air-conditioned seater coach with a total of five seats in a row used for day travel between cities.
EC Executive class chair car: An air-conditioned coach with large spacious seats and legroom. It has a total of four seats in a row used for day travel between cities. This class of travel is only available on Shatabdi Express trains.
Double Decker Double Decker: These are found in both AC and Non-AC rakes. AC Double Deck sitter coaches used in Double Decker Express. AC Double Deck sleeper will be used by newly proposed Uday Express. Non-AC Double Deck sitter were introduced to few Mumbai-Pune trains and the Flying Ranee. However Flying Ranee is the only train that uses Non-AC Double Decker sitter coaches.
SL Sleeper class: The sleeper class is the most common coach on IR, and usually ten or more coaches could be attached. These are regular sleeping coaches with three berths vertically stacked. In broad gauge, it carries 72 passengers per coach.
2S Seater class: same as AC Chair car, without the air-conditioning. These may be reserved in advance or may be unreserved.
UR/GEN Unreserved/General: The cheapest accommodation. The seats are usually made up of pressed wood in older coaches but cushioned seats are found in new coaches. These coaches are usually over-crowded and a seat is not guaranteed. Tickets are issued in advance for a minimum journey of more than 24 hours. Tickets issued are valid on any train on the same route if boarded within 24 hours of buying the ticket.
Deen Dayalu Deen Dayalu: These are non reserved coaches for long distance trains.
Seen here is the Mumbai Rajdhani Express. Rajdhanis are long-distance high-speed and high-priority trains connecting major state capitals with New Delhi
Seen here is the Secunderabad Yeshwanthpur Garib-Rath Express. Garib-Rath's are low cost A/c trains
Interior of a First Class(1A) compartment in the Rajdhani Express
Interior of an air-conditioned Chair Car coach(CC) in an Jan Shatabdi Express.
Inside a 3-tier AC Compartment of the Dakshin Express
A typical sleeper class coach

At the rear of the train is a special compartment known as the guard's cabin. It is fitted with a transceiver and is where the guard usually gives the all clear signal before the train departs.

UNESCO world heritage sites

There are two UNESCO World Heritage Sites on Indian Railways. – The Chatrapati Shivaji Terminus[50] and the Mountain Railways of India. The latter consists of three separate railway lines located in different parts of India:[51]

A tight loop (Agony Point) on the Darjeeling Himalayan Railway in West Bengal

Notable trains

Tourist trains

Other trains

A view of the Pamban Railway Bridge that links Rameshwaram to the mainland

[63]

Problems and issues

Indian Railways is cash strapped and reported a loss of 30,000 crore (US$5bn) in the passenger segment for the year ending March 2014. Operating ratio, a key metric used by Indian railways to gauge financial health, is 91.8% in the year 2014-15. Railways carry a social obligation of over 20,000 crore ($3.5bn). The loss per passenger-km increased to 23 paise by the end of March 2014. Indian Railways is left with a surplus cash of just 690 crore ($115mn) by the end of March 2014.[67]

It was s estimated in 2014 that over 5 lakh crore ($85bn) is required to complete the ongoing projects alone. The railway is consistently losing market share to other modes of transport both in freight and passengers.[68]

New railway line projects are often announced during the Railway Budget annually without securing additional funding for them. Between 2004 and 2014, 99 New Line projects worth 60,000 crore ($10bn) were sanctioned out of which only one project is complete till date, and there are four projects that are as old as 30 years, but are still not complete for one reason or another.[4]

Sanjay Dina Patil, MP for Mumbai North East, said in 2014 that additional tracks, height of platforms are still a problem and rise in prices of tickets, goods, monthly passes has created an alarming situation where the common man is troubled.[69]

See also

References

  1. "Times of India". The Times of India (India). 15 April 2010.
  2. 1 2 3 "Railways Fiscal Budget 2015-16" (PDF). Retrieved Feb 26, 2015.
  3. 1 2 3 4 http://indianrailways.gov.in/railwayboard/uploads/directorate/stat_econ/IRSP_2013-14/pdf/Statistical_Summary/Summary%20Sheet_Eng.pdf
  4. 1 2 http://www.indianrailways.gov.in/railwayboard/uploads/directorate/finance_budget/2014-15_Final/English%20-%20Railway%20Budget%20Speech%202014-15.pdf
  5. http://www.indianrailways.gov.in/railwayboard/uploads/directorate/stat_econ/IRSB_2012-13/PDF/Facts_Figures_Eng/19.pdf
  6. "About Indian Railways-Evolution". Ministry of Railways website.
  7. Bangladepia
  8. "Always the second station". The Hindu. 3 July 2006.
  9. "Indian Tramway Limited". Herepath's Railway and Commercial Journal 32 (1595): 3. January 1, 1870.
  10. "R.P. Saxena, Indian Railway History Timeline". Irse.bravehost.com. Retrieved 2012-12-15.
  11. Shyam Rungta (1970). The Rise of Business Corporations in India, 1851–1900. Cambridge U.P. p. 17. ISBN 978-0-521-07354-7. British investment in Indian railway reaches £100m by 1875
  12. "History of Indian Railways". Irfca.org. Retrieved 2012-12-15.
  13. Sweenety, Stuart (2015). Financing India's Imperial Railways, 1875–1914. London: Routledge. pp. 186–188. ISBN 1317323777.
  14. "Top Indian Railway Facts". Indian Railway.
  15. Sandes, Lt Col E.W.C. (1935). The Military Engineer in India, Vol II. Chatham: The Institution of Royal Engineers.
  16. "Ministry of Railways (Railway Board)". www.indianrailways.gov.in. Retrieved 2015-09-23.
  17. http://www.indianrail.gov.in/ir_zones.pdf
  18. Singh, Vijay Pratap (27 February 2010). "SMS complaint system: A Northern Railway brainwave spreads". Indian Express. Retrieved 2012-01-19.
  19. Indian Railways Facts and Figures (2011–2012). Ministry of Railways, Government of India. 2012. p. personnel. Retrieved 21 July 2013.
  20. "Zones and their Divisions in Indian Railways" (PDF). Indian Railways. Retrieved 26 August 2011.
  21. "Salem railway division formed (in 2005)". http://www.sr.indianrailways.gov.in/. Retrieved 2012-10-07. External link in |publisher= (help)
  22. "New railway division in Gulbarga to be under SWR". The Hindu. 2014-03-06. ISSN 0971-751X. Retrieved 2015-12-25.
  23. "Railway Board Directorates". INDIAN RAILWAY ESTABLISHMENT CODE. Indian Railways.
  24. "Indian Railways level which constitutes the Governing Council of Association". irts.org.in.
  25. "RRB Notifications "
  26. "Indian Railways Establishment Manual". rrcb.gov.in.
  27. http://www.rediff.com/business/report/pix-indias-first-cng-train-flagged-off/20150115.htm. |first1= missing |last1= in Authors list (help); Missing or empty |title= (help)
  28. "New Technology allows Railways to save Rs 20 Lakhs Diesel per Engine". Retrieved 6 September 2013.
  29. Indian Railways joins 1 billion tonne club in freight loading - Yahoo! News India. In.news.yahoo.com (2013-04-02). Retrieved on 2013-07-16.
  30. "BLC-A Container Flat Wagon". Titagarh Wagons Limited. Retrieved 2014-04-27.
  31. Compiled and edited by Research, Reference and Training Division. (2011). India Yearbook 2011. Publications Division, Ministry of Information & Broadcasting, Govt. of India. Table 19.1. ISBN 978-81-230-1674-0.
  32. "Electrification work of Itarsi-Jabalpur—Manikpur also taken at CORE conference". ehitavada.com. 2013-04-07. Archived from the original on 29 October 2013.
  33. "Toy Trains of India". Our Trips – Royal Train Tours. India Calling Tours (P) Limited. Retrieved 12 May 2007.
  34. Railways, IIT-Madras tie up to power AC coaches with solar energy | News | Eco-Business - Asia's Cleantech & Sustainable Business Community. Eco-Business (2013-08-05). Retrieved on 2013-08-17.
  35. "Indian Railways develops Automatic Fire and Smoke Detection System". Retrieved 5 September 2013.
  36. 1 2 "GE, Alstom land $5.6-billion deals to supply locomotives for railways". Economic Times. 10 November 2015. Retrieved 13 November 2015.
  37. "Indian Railways gets first model rake of luxury 'Make in India' coaches". The Economic Times. Bennett, Coleman & Co. Ltd. 11 January 2016. Retrieved 13 January 2016.
  38. "Indian Railways unveils ‘Make in India’ train coaches with new look". The Financial Express. The Indian Express Group. 13 January 2016. Retrieved 13 January 2016.
  39. "Swachh Rail-Swachh Bharat: Indian Railways aims to equip coaches with bio-toilets by 2021". Indian Express. 29 March 2015. Retrieved 24 October 2015.
  40. "Locomotive Factories in Bihar: In cold storage for years, two Railway projects to start soon". Indian Express. 30 October 2015. Retrieved 31 October 2015.
  41. "GE Gets $2.6 Billion Indian Railways Contract". Wall Street Journal. 9 November 2015. Retrieved 9 November 2015.
  42. "Rail ministry awards Rs 14,656-cr Marhowra locomotive project to GE". Business Standard. 9 November 2015. Retrieved 9 November 2015.
  43. "India approves new railway link with Bangladesh". TwoCircles.net. Retrieved 2012-12-15.
  44. "Rail link from Manipur to Vietnam on cards: Tharoor". The Times of India (India). 9 April 2010.
  45. "Neighbours to the west get closer | Bangkok Post: news". Bangkok Post. 28 February 2012. Retrieved 2012-12-15.
  46. "railway operations — I". IRFCA.org. Indian Railways Fan Club. Retrieved 11 June 2007.
  47. Retrieved from 'The Indian Express' on 30th March2015.
  48. 1 2 "General Information on travelling by IR". IRFCA.org. Indian Railways Fan Club. Retrieved 3 June 2007.
  49. "Class of Travel". indiarail.co.uk. S.D. Enterprises Ltd. Retrieved 3 June 2007.
  50. "Chhatrapati Shivaji Terminus (formerly Victoria Terminus)". World Heritage List. World Heritage Committee. 2004. Retrieved 5 January 2009.
  51. "Mountain Railways of India". World Heritage List. World Heritage Committee. 1999. Retrieved 5 January 2009.
  52. "100 years of pine-scented travel". Retrieved 14 February 2009. |first1= missing |last1= in Authors list (help)
  53. "Train Route". palacewheels.net. Retrieved 2014-04-27.
  54. "Royal Rajasthan on Wheels Itinerary | Tour Program for 2014–15". Royalsrajasthanonwheels.com. Retrieved 2014-04-27.
  55. "The Maharajas’ Express Train Journeys Season 2014–2015". The-maharajas.com. Retrieved 2014-04-27.
  56. Ministry of Railways (Railway Board)
  57. "Tour Itinerary - Tour Itinerary of Golden Chariot Train, Itinerary of Golden Chariot Train". Goldenchariottrain.com. Retrieved 2014-04-27.
  58. "Southern Splendour Tour - South India Tour and South India Tour Package". Goldenchariottrain.com. Retrieved 2014-04-27.
  59. "Ministry of Railways (Railway Board)". Indianrailways.gov.in. Retrieved 2014-04-27.
  60. "Hill trains". Archived from the original on 22 August 2008. Retrieved 14 February 2009.
  61. Jagriti Yatra (8 September 2015). "Jagriti Yatra - Entrepreneur's Train Journey". jagritiyatra.com. Retrieved 2015-09-08.
  62. Indian Railways (11 August 2015). "Kumbh Mela Special Trains". checkpnrstatusirctc.in. Retrieved 2015-08-11.
  63. Indian Railways (17 December 2015). "Mumbai Central will be first station to get free high speed WiFi". indiantrain.in. Retrieved 2015-12-17.
  64. Manish Umbrajkar (8 July 2009). "Old-timers recollect double-decker days". Articles.timesofindia.indiatimes.com. Retrieved 2012-12-15.
  65. "First AC Double Decker Train in India". ManageInfo. 16 July 2015. Retrieved 2015-07-16.
  66. "Indian Railways, Lifeline to the nation… – SouLSteer Magazine". SouLSteer.com. 16 April 2013. Retrieved 2013-04-16.
  67. http://www.indianrailways.gov.in/railwayboard/uploads/directorate/finance_budget/2014-15_Final/Budget%20Speech%202014-15%20Highlights%20_English_PDF.pdf
  68. http://www.livemint.com/r/LiveMint/Period1/2014/07/08/Photos/w_Rail_Budget_Precursor_grfx.jpg
  69. Kalwar, Pooja (9 July 2014). "NCP workers stage protest against Rail Budget in Mumbai". Mid Day. Retrieved 4 August 2014.

Further reading

External links

Wikimedia Commons has media related to Indian Railways.
Listen to this article (info/dl)


This audio file was created from a revision of the "Indian Railways" article dated 2006-03-15, and does not reflect subsequent edits to the article. (Audio help)
More spoken articles

This article is issued from Wikipedia - version of the Friday, May 06, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.