Chandigarh Metro

Chandigarh Metro
चण्डीगढ़ मेट्रो
ਚੰਡੀਗੜ੍ਹ ਮੇਟ੍ਰੋ
Overview
Locale Chandigarh, India
Transit type Rapid Transit
Number of lines 2
Number of stations 30
Daily ridership 300,000 (estimated)
Operation
Operation will start 2018
Operator(s) Chandigarh Metro Rail Corporation (CMRC)[1]
Number of vehicles 16
Train length 4 coaches
Technical
System length 37.573 km
Electrification N/A

Chandigarh Metro is a proposed rapid transit system for the city and union territory of Chandigarh in India.[2][3][4]

History

Delhi Metro Rail Corporation (DMRC) submitted the detailed project report of the Chandigarh Metro Project to Punjab Governor and UT administrator Shivraj Patil on 16 August 2012.[5]

On 9 July 2015, in the presence of Kaptan Singh Solanki, who is the Governor of Punjab and Administrator of Chandigarh as well as the Governor of Haryana, the MoU was signed by the Additional Chief Secretary, Haryana Town and Country Planning Department, P Raghavendra Rao, the Secretary, Town and Planning, Punjab, A Venu Prasad, and the UT Adviser, Vijay Kumar Dev.[6] As part of the MoU, the three parties also named the special purpose vehicle (SPV) to execute the project as the Greater Chandigarh Transport Corporation (GCTC) for the development of comprehensive integrated multi-modal urban and sub-urban commuter system for the region. The initial equity of the GCTC shall be Rs 100 crore, which will be contributed equally — 25 per cent each — by the Union Ministry of Urban Development, the UT Administration, Haryana and Punjab.[7]

Plan

In the first phase, a 37.573 km metro rail network will be built of which 23.468 km will be elevated and 14.105 km underground Corridor. It will run from north to south. It will start near Capitol Complex and will go up to Mohali. Corridor II, also known as East West Corridor, will start from Sector 21, Panchkula and reach up to Mullanpur.[8][9]

Routes

The proposed routes for the various corridors of the metro network are as follows:

Cost

The project is expected to cost 113.75 billion (US$1.7 billion), out of which 89.95 billion (US$1.3 billion) will be borne by Chandigarh Administration, 16.8 billion (US$250 million) will be borne by Punjab Govt. and the remaining 7 billion (US$100 million) by Haryana Govt. The expected cost of the metro elevated section is 1.4 billion (US$21 million) per Km and that of the metro underground section is 3.5 billion (US$52 million) per Km. The metro will be completed in two phases. The estimated cost of Phase-I is 89.95 billion (US$1.3 billion) and that of Phase-II is 23.8 billion (US$350 million).[12]

Vision

The vision behind the metro system is a well contained city with efficient people friendly transport system with minimum travel time & maximum safety and comfort. The main points of the envisaged vision are:

  1. To improve connectivity and travel throughout the city and its region.
  2. To improve mobility within neighborhoods, wards, zones and satellite towns to address inner- and inter-city transportation needs.
  3. To achieve efficient arrangement of land use and transport systems to minimize overall travel cost.
  4. To offer viable and reliable transportation options that aim at reducing dependence on cars, with widespread use of non-motorised modes and mass rapid transit system.

See also

References

External Links

This article is issued from Wikipedia - version of the Thursday, February 18, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.