Carmel Tunnels

Route 23
כביש 23 / מנהרות הכרמל
Minharot HaCarmel / Kvish Esrim ve'Shalosh
Route information
Length: 8.6 km (5.3 mi)
Existed: December, 2010 – present
Major junctions
West end: Haifa Darom Interchange
  Ruppin Interchange
East end: Yadin/Mevo Carmel Interchange
Location
Major cities: Haifa
Neighborhoods:
Hof HaCarmel, Neve Sha'anan, Check Post, Haifa Port East
Highway system

Roads in Israel

Highways
Entrance to the tunnel at Check Post.

The Carmel Tunnels (Hebrew: מנהרות הכרמל, Minharot HaCarmel; also known as Route 23) are a set of road tunnels in Haifa, Israel. The tunnels' purpose is to reduce road congestion in the Haifa area and to provide an alternate route of reaching the eastern and central parts of the city, Haifa Bay and the Krayot area to and from Israel's central coastal plain without having to travel through traffic-congested downtown Haifa, having to drive up and across Mount Carmel or bypassing Haifa from the east, along the edge of the Jezreel Valley (via Highway 70 for example). The tunnels cut the travel time from the Haifa South interchange in the west to the Checkpost interchange in the east from 30–50 minutes down to 6 minutes.

The tunnels were built and are operated as a BOT project, and driving in the tunnels requires paying a toll. They were opened to traffic on 1 December 2010.[1]

Overview

The entire project is 8.6 km long. There are four tunnels (two sets of twin tunnels), the 3.5 km long western set and the 1.6 km long eastern set, containing two lanes of traffic in each tunnel. The tunnels were bored in Mount Carmel, essentially under the city of Haifa and have three portals: one from the west, near the MATAM business park (with a connection to the Coastal Highway and the Old Haifa–Tel Aviv Highway), one in the center off Rupin Road (next to the Grand Canyon Shopping Mall), and from the east connecting to the Krayot (aka the "Checkpost") interchange and Highway 22 at the Yadin/Mevo Carmel interchange.

The project was built by Carmelton, a subsidiary of Ashtrom and Shikun UVinui, two of the largest infrastructure companies in Israel, and the tunnels were bored by China Civil Engineering Construction Corporation (CCECC), a Chinese company specializing in tunnel boring.

In January 2009, boring was completed on the westbound tunnel in the eastern portion of the project.[2] Boring of the last tunnel was completed on June 1, 2009.[3] The cost for drivers is 6 NIS for each segment (a drive to the central portal is considered one segment and driving the entire east-west route is composed of two segments).[4] Payment can be made in cash at a toll booth or by video tolling using automatic number plate recognition for subscribers who arrange a billing relationship or by video or transponder tolling for Highway 6 subscribers. The total cost of the project will be approximately 1.2 billion NIS (300 million US Dollars in December 2008 prices).

In early March 2014 construction was completed on a connector between the tunnels' eastern portal and Highway 22. This connector is the final link between a series of controlled-access highways that together form an inter-city highway corridor stretching along most of Israel's Mediterranean coast, from Acre (Akko) in the north to Ashdod in the south. This corridor consists of whole or parts of highways 22, 23, 2, 20 and 4.

History

Plans for the tunnels were first proposed as early as 1992, and the winning tender for the construction of the tunnels was awarded to Carmelton in 1997. In 1999 Carmelton obtained financing for the project, however construction was delayed due to objections and other legal matters, at which point Israel Discount Bank backed out of its obligation to provide credit for the project. A lengthy legal suit followed, which eventually forced the bank to carry out its financial obligations.

Six hundred Chinese workers were brought in for the project by CCECC. The project was first delayed just one week after the cornerstone was laid in April 2007, following concerns over electromagnetic radiation standards.[5] Work finally resumed on June 19, 2007.

The project was once again delayed in September 2008, when CCECC demanded that the contract with Carmelton be re-negotiated due to the increase in costs which CCECC had to deal with, mainly due to a rise in construction materials costs. Construction work was disrupted for over a month, first slowing down and eventually stopping completely. Work was resumed on October 23, 2008.[6]

Despite these delays, Carmelton managed to open the tunnels on December 1, 2010, six months ahead of schedule.[7]

Junctions

km Name Type Meaning Location Road(s) Crossed
0 מחלף חיפה דרום
(Haifa Darom Interchange)

Haifa South Haifa, Hof HaCarmel,
Carmel Beach Central Bus Station,
Carmel Beach Railway Station
Highway 2,
Highway 4
0.8 Haifa, Hof HaCarmel
Carmel Beach Central Bus Station
Megorshei Sfarad St.
0.9 Toll Plaza Haifa, Hof HaCarmel
1 Shambur, Romema
neighborhoods
4.2 מחלף רופין
(Ruppin Interchange)

named after
Arthur Ruppin
Grand Canyon Shopping Mall
Neve Sha'anan neighborhood
Simcha Golan Road,
Ruppin Road
4.7 Neve Sha'anan neighborhood
6.7 Toll Plaza Haifa, Check Post
7.3 מחלף הקריות
(HaKrayot Interchange)

named after
northern suburbs
the towns
Haifa, Check Post Highway 4,
Inbar Street,
HaNapah Street
8.6 מחלף ידין
(Yadin/Mevo Carmel Interchange)
Named after
Yigael Yadin
Haifa Port East
Yigael Yadin Road,
Highway 22

References

External links

Coordinates: 32°47′24.06″N 35°0′18.52″E / 32.7900167°N 35.0051444°E / 32.7900167; 35.0051444

This article is issued from Wikipedia - version of the Wednesday, March 09, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.