Lakeshore West line

Lakeshore West

GO Train westbound past Sunnyside in Toronto
Overview
Type Commuter rail
System GO Train
Locale Toronto
Mississauga
Oakville
Burlington
Hamilton
Stations 12
Daily ridership 60,000 (2014)[1]
Website Table 01
Operation
Opened May 23, 1967
Owner Metrolinx
Canadian National Railway
Canadian Pacific Railway
Operator(s) GO Transit
Technical
Line length 63.2 kilometres (39.3 mi)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Operating speed 150 km/h (93 mph)[2] (max)
Route map
Legend
VIA Rail/Amtrak Maple Leaf service
130 Niagara Falls
QEW
Niagara Escarpment
Welland Canal
406 Overpass
Twelve Mile Creek
111 St. Catharines
Jordan Harbour
Grimsby only
Niagara Region ¦ Hamilton
Confederation
Hamilton Yard
63.2 Hamilton GO Centre
West Harbour
Hunter St. Tunnel
60.0 Desjardins Canal
59.9 Hamilton Jct.
Hamilton ¦ Halton Region
55.7 Aldershot
QEW Underpass
52.5 Burlington Jct.
51.5 Burlington
44.9 Appleby
41.5 Bronte Creek
39.8 Bronte
Sixteen Mile Creek
34.4 Oakville
Halton Region ¦ Peel Region
26.9 Clarkson
21.2 Credit River
20.6 Port Credit
Peel Region ¦ Toronto
15.4 Long Branch
Willowbrook Yard
10.8 Mimico
9.2 Gardiner Underpass
8.2 Humber River
3.2 Exhibition
Milton, Kitchener
  and Barrie lines
North Bathurst Yard
0 Union
Lakeshore East, Stouffville
  and Richmond Hill lines
Station with all-day service
Station with rush hour/limited service
Maintenance yard

Lakeshore West is one of the seven train lines of the GO Transit system in the Greater Toronto Area, Ontario, Canada. It extends from Union Station in Toronto to Hamilton, with summer weekend and holiday excursion service extending to Niagara Falls.

History

The Lakeshore West line is the oldest of GO's services, opening as part of the then-unified Lakeshore line on GO Transit's first day of operations on May 23, 1967.[3] The first train left at 4:50 am from Oakville bound for Toronto, ten minutes before service began out of Pickering.[4] During the three-year experiment, all day GO Train service ran hourly from Oakville to Pickering with limited rush hour train service to Hamilton. The experiment proved to be extremely popular; GO Transit carried its first million riders during its first four months, and averaged 15,000 per day soon after.[5][6]

Service began running west from Union, stopping at Mimico, Long Branch, Port Credit, Lorne Park, Clarkson, and Oakville. Rush-hour trains ran to Bronte, Burlington and Hamilton, at the former CN railway station at James Street.

GO Trains started serving the Canadian National Exhibition in August 1967 from an older platform just west of the Dufferin Street bridge over the Lakeshore West line and the Queen Elizabeth Way. For the 1968 Exhibition season, temporary booths were set up to handle passengers, which topped 24,000 on the season's busiest day. This prompted the need for a proper station with additional capacity, and by the 1968 Royal Agricultural Winter Fair, the current Exhibition GO Station was built and put in service.[5]

Lorne Park Station closed within the first year of the line's operation. Burlington was re-located approximately 750 metres eastward in March 1980. Appleby GO Station opened on September 19, 1988, followed by Aldershot on May 25, 1992. The opening of Aldershot coincided with the extension of all day and weekend service from Oakville to Burlington, however, this was reversed due to budget cuts on July 3, 1993.[5]

Service to Hamilton was re-routed from the James Street station to downtown, at the current Hamilton GO Centre on April 29, 1996. All day service to Burlington was restored on May 1, 2000, and extended to Aldershot on September 7, 2007.[5] On June 29, 2013, all day service was increased to operate trains every 30 minutes.[7]

A third track has been added between Sixteen Mile creek and the Port Credit station. Combined with additional work undertaken since the early 1990s, this gives the Lakeshore West line at least three tracks from Union Station through to Bayview Junction.

West Harbour GO Station opened in July 2015, serving as a second Hamilton terminus for rush-hour train service.[8] This new station was built adjacent to the former CNR James Street station used by GO until 1996.

Service

On weekdays, trains run on the Lakeshore West line every 30 minutes or better between approximately 5 a.m. and 10 p.m. eastbound from Aldershot, and between approximately 6 a.m. and midnight westbound from Union. Service start an hour or two later on weekends and holidays. On weekdays, six trains serve Hamilton directly in the morning and the evening rush hour, four at Hamilton GO Centre and two at West Harbour GO Station. At other times, buses connect Hamilton GO Centre to Aldershot and Union Station.[9]

Since 2009, GO Transit has operated excursion trains to St. Catharines and Niagara Falls on summer weekends and holidays.[10] The train makes limited stops along the line (Exhibition, Port Credit, Oakville and Burlington) before continuing around Burlington Bay and heading east into Niagara Region.

On May 26, 2015, the Government of Ontario announced that service would be extended to Confederation GO Station in Stoney Creek. Construction is expected to begin in 2017, with the extension completed in 2019.[11][12]

In 2008, Metrolinx published its regional transportation entitled The Big Move. As part of this, the agency identified an express all-day service between Hamilton and Oshawa (via Toronto Union) as one of its top 15 priorities.[13] Metrolinx has also committed to eventually providing service every 15 minutes on the line, as well as electrifying railways. This project, dubbed Regional Express Rail, is expected to reduce some trip times by 20%.[14][15]

Ownership

In order to facilitate service expansions, GO Transit's parent agency Metrolinx has slowly acquired portions of all corridors of the GO Transit system from the freight railroads, Canadian National Railway (CN) and Canadian Pacific Railway (CP). Most of the Lakeshore West line operates along the Oakville subdivision, and until 1998, it was completely owned by CN.[16]

The first segment of the Oakville subdivision, between Union Station and 30th Street in Etobicoke (just west of GO's Willowbrook yard), was acquired from CN on March 31, 2010.[17] On March 27, 2012, a second segment was purchased to the west, to a point just west of Fourth Line in Oakville.[18] On March 22, 2013, Metrolinx completed a third segment purchase westward to a point just east of where the CN Halton Subdivision joins the line in Burlington.[19]

These three segments represent Metrolinx's current ownership of the line. CN continues to own the tracks between Burlington and the Desjardins Canal, as well as the Grimsby subdivision that carries trains into Niagara. CP owns the tracks between the Desjardins Canal and the Hamilton GO Centre.[20]

Station list

Station Municipality Connections Notes
Union Toronto Corridor

TTC
Through service to the Lakeshore East line
Exhibition TTC
Mimico TTC
Long Branch TTC
Port Credit Mississauga Bus interchange MiWay Future connection to Hurontario-Main LRT
Clarkson
Oakville Oakville Corridor

Bus interchange Oakville Transit
Bronte Bus interchange Oakville Transit
Appleby Burlington Bus interchange Burlington Transit
Burlington
Bus interchange Burlington Transit
Aldershot Corridor

Bus interchange Burlington Transit
Hamilton Hamilton
Bus interchange Hamilton Street Railway
Rush hour service only
West Harbour
Bus interchange Hamilton Street Railway
Rush hour service only
Confederation TBD Opening 2019
St. Catharines St. Catharines St. Catharines Transit Summer season only
Niagara Falls Niagara Falls
Niagara Falls Transit
WEGO Niagara Falls Visitor Transportation
Summer season only

References

  1. "Regional Express Rail" (PDF). Metrolinx. 5 September 2014. Retrieved 2 September 2014.
  2. "Quick Facts: GO Trains (Sept 2012)" (PDF). GO Transit. Retrieved 2012-11-04.
  3. GO celebrates 40 years of success
  4. GO Transit First Employee Timetable
  5. 1 2 3 4 Garcia et al.: Lakeshore corridor
  6. Sergeant, Ch.4: Buying the trains.
  7. Kalinowski, Tess (19 April 2013). "GO trains to run every 30 minutes all day on Lakeshore lines". Toronto Star (Toronto Star Newspapers). Retrieved 2013-04-19.
  8. "First commuters ride GO from Hamilton's new West Harbour station". CBC News. 9 April 2015. Retrieved 2015-07-15.
  9. Lakeshore West
  10. Niagara on the GO
  11. Ontario Investing Up to $1 Billion for Light Rail Transit in Hamilton
  12. Hamilton to get a new LRT and GO Train station
  13. The Big Move, Section 5.2: The first 15 years. Retrieved July 23, 2010
  14. Lakeshore West GO line
  15. Tess Kalinowski, Transportation reporter (17 April 2015). "GO to add almost 50 per cent more trains in next 5 years". Toronto Star. Retrieved 2016-03-30.
  16. http://www.metrolinx.com/en/docs/pdf/board_agenda/20130627/20130627_BoardMtg_GO_Transit_Update_EN.pdf
  17. http://www.newswire.ca/en/story/711421/cn-sells-commuter-rail-line-segment-west-of-toronto-union-station-to-metrolinx-for-c-168-million
  18. "CN - CN sells Greater Toronto Area rail lines to Metrolinx for GO Transit services". newswire.ca.
  19. "CN - CN sells Oakville-Burlington, Ont., line segment to Metrolinx for GO Transit commuter rail service". newswire.ca.
  20. Metrolinx Rail Corridor Ownership

General references

Bibliography

External links

This article is issued from Wikipedia - version of the Wednesday, April 20, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.