Line 6, Chongqing Rail Transit

Line 6, Chongqing Rail Transit
Line 6
六号线

Hongqihegou Station platform
Overview
Type rapid transit
System Chongqing Rail Transit
Status operational
Termini Chayuan
Beibei
Stations 33
Daily ridership 208,000 (2014 Peak)[1]
Operation
Opened September 28, 2012
Operator(s) Chongqing Rail Transit Corp., Ltd
Technical
Line length 75.9 km (47.2 mi)
Route map

CRT Line 6 is the second heavy rail subway line in Chongqing, China. It opened with provisional revenue service on September 28, 2012, and will connect Nan'an, Yuzhong, and Jiangbei districts in central Chongqing when all phases are complete.[2]

Interior of a Line 6 train

Current Stations (south to north)

Service
routes
Station Code
Station Name
English
Station Name
Simplified Chinese
Platform Types
Transfer
Location
6/01 Chayuan 茶园 (und) Nan'an
6/02 Qiujiawan 邱家湾 (und)
6/03 Changshengqiao 长生桥 (und)
6/04 Liujiaping 刘家坪 (elv)
6/05 Shangxinjie 上新街 (und)
6/06 Xiaoshizi 小什字 (und)  1  Yuzhong
6/07 Grand Theater 大剧院 (elv) Jiangbei
6/08 Jiangbeicheng 江北城 (und)
6/09 Wulidian 五里店 (und)
6/10 Hongtudi 红土地 (und)
6/11 Huangnibang 黄泥磅 (und)
6/12 Hongqihegou 红旗河沟 side (und)  3  Yubei
6/13 Huahuiyuan 花卉园 (und)
6/14 Dalongshan 大龙山 (und)
6/15 Ranjiaba 冉家坝 island (und)
6/16 Guangdianyuan 光电园 (und)
6/17 Dazhulin 大竹林 (elv)
6/18 Kangzhuang 康庄 side (elv)
6/19 Jiuquhe 九曲河 (elv)
6/20 Lijia 礼嘉 (und)
6/21 Jinshan Temple 金山寺 (und)
6/22 Caojiawan (Beibei) 曹家湾 (und) Beibei
6/23 Caijia 蔡家 (und)
6/24 Xiangjiaang 向家岗 (und)
6/25 Longfengxi 龙凤溪 (elv)
6/26 Beibei 北碚 (und)
6/27 Tiansheng 天生 (und)
6/28 Beibei 北碚 (und)
6/29 Pingchang 平场 (und) Yubei
6/30 Huangmaoping 黄茅坪 (und)
6/31 Gaoyikou 高义口 (und)
6/32 International Expo Center 国博中心 (und)
6/33 Yuelai 悦来 (und)

Planned

Lijia Branch

Phase II
Station Code
Station Name
English
Station Name
Simplified Chinese
Platform Types
Transfer
Location
6/34 Ganyuanzi 甘院子 Yubei
6/35 Caojiawan (Yubei) 草家湾
6/36 Maiziba 麦子坝
6/37 Liujiayuanzi 刘家院子
6/38 Hujiawan 胡家湾
6/39 Yutaishan 雨台山
6/40 Hujiaqiao 胡家桥
6/41 Hongyanping 红岩坪
6/42 Shaheba 沙河坝

Chayuan Branch

Phase I
Station Code
Station Name
English
Station Name
Simplified Chinese
Platform Types
Transfer
Location
6/43 Chongqingdong Railway Station 重庆东站 Nan'an
6/44 Renjiashan 任家山
6/45 Liwan 梨湾
6/46 Qiaopingshan 樵枰山
6/47 Business and Trade City South 商贸城南
6/48 Yinglong 迎龙
6/49 Business & Trade City North 商贸城北
6/50 Xiaowan 小湾
6/51 Guangyangdao 广阳岛
6/52 Fuhualou 孵化楼
6/53 Yinhu 银湖

References

  1. "重庆轨道交通线网昨日客运总量195.9万乘次". 重庆轨道交通. Retrieved October 12, 2014.
  2. "Part of Light Rail Line 6 opens". Retrieved September 30, 2012.
This article is issued from Wikipedia - version of the Sunday, February 21, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.