| Capacity MW | Name | Country | Location | Coordinates | Technology type | Notes and references | 
| 392 |  Ivanpah Solar Power Facility  |   USA  |  San Bernardino County, California  |  35°34′N 115°28′W / 35.567°N 115.467°W / 35.567; -115.467 (Ivanpah Solar Power Facility)  |  solar power tower  |  Completed in February 13, 2014[1][2][3] | 
 
|  354  |  Solar Energy Generating Systems (SEGS)  |    USA  |  Mojave Desert, California  | 35°01′54″N 117°20′53″W / 35.03167°N 117.34806°W / 35.03167; -117.34806 (Solar Energy Generating Systems) |  parabolic trough  |  Collection of 9 units[4][5][6][7][8][9][10][11][12] | 
|  280  |  Mojave Solar Project  |    USA  |  Barstow, California  |  35°00′40″N 117°19′30″W / 35.01111°N 117.32500°W / 35.01111; -117.32500 (Mojave Solar Project)  |  parabolic trough  |  Completed December 2014. Gross capacity of 280 MW corresponds to net capacity of 250 MW[13][14][15]  | 
| 280 |  Solana Generating Station  |    USA  |  Gila Bend, Arizona  |  32°55′N 112°58′W / 32.917°N 112.967°W / 32.917; -112.967 (Solana Generating Station) |  parabolic trough  |  Completed in October 2013, with 6h thermal energy storage[16][17] | 
| 250  |  Genesis Solar Energy Project  |    USA  |  Blythe, California  |  33°38′37.68″N 114°59′16.8″W / 33.6438000°N 114.988000°W / 33.6438000; -114.988000 (Genesis Solar)  |  parabolic trough  | Online April 24, 2014[18][19] | 
| 200 |  Solaben Solar Power Station[20]  |    Spain  |  Logrosán  |  39°13′29″N 5°23′26″W / 39.22472°N 5.39056°W / 39.22472; -5.39056 (Solaben Solar Power Station)  |  parabolic trough  |  Solaben 3 completed June 2012[21] Solaben 2 completed October 2012[21] Solaben 1 and 6 completed September 2013[22] | 
| 160  |  Noor I  |    Morocco  |  Ghassate, Ouarzazate Province  | 30°59′40″N 6°51′48″W / 30.99444°N 6.86333°W / 30.99444; -6.86333 (Ouarzazate solar power station)  |  parabolic trough  | with 3h heat storage[23] · [24] | 
|  150 |  Solnova Solar Power Station  |    Spain  |  Sanlúcar la Mayor  | 37°25′00″N 06°17′20″W / 37.41667°N 6.28889°W / 37.41667; -6.28889 (Solnova Solar Power Station) |  parabolic trough  |  Solnova 1 completed May 2010   Solnova 3 completed May 2010   Solnova 4 completed August 2010[25][26][27][28][29] | 
|  150  |  Andasol solar power station  |    Spain  |  Guadix  | 37°13′42.70″N 3°4′6.73″W / 37.2285278°N 3.0685361°W / 37.2285278; -3.0685361 (Andasol solar power station) |  parabolic trough  |  Completed: Andasol 1 (2008), Andasol 2 (2009), Andasol 3 (2011). Each equipped with a 7.5-hour thermal energy storage.[30][31] | 
| 150 |  Extresol Solar Power Station  |    Spain | Torre de Miguel Sesmero  | 38°39′N 6°44′W / 38.650°N 6.733°W / 38.650; -6.733 (Extresol Solar Power Station) |  parabolic trough  | Completed: Extresol 1 and 2 (2010), Extresol 3 (2012). Each equipped with a 7.5-hour thermal energy storage.[21][32][33] | 
|  110  |  Crescent Dunes Solar Energy Project  |    USA  |  Nye County, Nevada  | 38°14′N 117°22′W / 38.233°N 117.367°W / 38.233; -117.367 (Crescent Dunes Solar Energy Project)  |  solar power tower   | with 10h heat storage; commercial operation began September 2015[34] | 
|  100  |  KaXu Solar One  |    South Africa  |  Pofadder, Northern Cape  |  28°53′40.56″S 19°35′53.52″E / 28.8946000°S 19.5982000°E / -28.8946000; 19.5982000 (KaXu Solar One)  |  parabolic trough  |  with 2.5h heat storage[35][36][37] | 
| 100 |  GUZMAN  |    Spain |  Palma del Río  |  37°38′N 5°15′W / 37.633°N 5.250°W / 37.633; -5.250 (GUZMAN)  |  parabolic trough  |  Palma del Rio 2 completed December 2010[21] Palma del Rio 1 completed July 2011[21] | 
| 100 |  Manchasol Power Station  |    Spain |  Alcázar de San Juan  |  39°11′N 3°18′W / 39.183°N 3.300°W / 39.183; -3.300 (Manchasol Power Station)  |  parabolic trough  |  Manchasol 1 and 2 completed in 2011, each with 7.5h heat storage[21] | 
| 100 |  Valle Solar Power Station  |    Spain |  San José del Valle  |  36°39′N 5°50′W / 36.650°N 5.833°W / 36.650; -5.833 (Valle Solar Power Station)  |  parabolic trough  |  Completed December 2011, with 7.5h heat storage[21][38]  | 
| 100 |  Helioenergy Solar Power Station  |    Spain  |  Écija  |  37°34′43″N 5°9′24″W / 37.57861°N 5.15667°W / 37.57861; -5.15667 (Helioenergy Solar Power Station)  |  parabolic trough  |  Helioenergy 1 completed September 2011[39][40] Helioenergy 2 completed January 2012[21][39][40] | 
| 100 |  Aste Solar Power Station  |    Spain |  Alcázar de San Juan  |  39°10′22″N 3°15′58″W / 39.17278°N 3.26611°W / 39.17278; -3.26611 (Helioenergy Solar Power Station)  |  parabolic trough  |  Aste 1A Completed January 2012, with 8h heat storage[21]  Aste 1B Completed January 2012, with 8h heat storage[21] | 
 
| 100 |  Solacor Solar Power Station  |    Spain |  El Carpio  |  37°54′54″N 4°30′9″W / 37.91500°N 4.50250°W / 37.91500; -4.50250 (Solacor Solar Power Station)  |  parabolic trough  |  Solacor 1 completed February 2012[21] Solacor 2 completed March 2012[21][41] | 
| 100 |  Helios Solar Power Station |    Spain |  Puerto Lápice  |  39°14′24″N 3°28′12″W / 39.24000°N 3.47000°W / 39.24000; -3.47000 (Helios Solar Power Station)  |  parabolic trough  |  Helios 1 completed May 2012[21] Helios 2 completed August 2012[21] | 
|  100 |  Shams solar power station  |    UAE  |  Abu Dhabi Madinat Zayed  |  23°34′N 53°42′E / 23.567°N 53.700°E / 23.567; 53.700 (Shams solar power station) |  parabolic trough  |  Shams 1 completed March 2013 [42][43] | 
| 100 |  Termosol Solar Power Station  |    Spain |  Navalvillar de Pela  |   |  parabolic trough  |  Both Termosol 1 and 2 completed in 2013[21] | 
| 100 |  Palma del Río I & II  |    Spain |  Palma del Río  | 37°38′42.56″N 5°15′29.32″W / 37.6451556°N 5.2581444°W / 37.6451556; -5.2581444 (Palma del Río I & II)  |  parabolic trough  |  Completed July 2012[21] | 
| 75 |  Martin Next Generation Solar Energy Center  |    USA  |  Indiantown, Florida  | 27°03′11″N 80°33′00″W / 27.05306°N 80.55000°W / 27.05306; -80.55000 (Martin Next Generation Solar Energy Center) |  ISCC with parabolic trough  |  Completed December 2010[44] | 
| 64 |  Nevada Solar One |    USA |  Boulder City, Nevada  | 35°48.0′N 114°58.6′W / 35.8000°N 114.9767°W / 35.8000; -114.9767 (Nevada Solar One) |  parabolic trough  |  Operational since 2007 | 
|  50  |  Khi Solar One  |    South Africa  |  Upington  |  28°33′0.36″S 21°5′5.28″E / 28.5501000°S 21.0848000°E / -28.5501000; 21.0848000 (Khi Solar One)  |  solar power tower  |  Completed Feb 2016   With 2h heat storage[35][36]  | 
|  50  |  Bokpoort  |    South Africa  |  Groblershoop  |  28°43′26.96″S 21°59′34.88″E / 28.7241556°S 21.9930222°E / -28.7241556; 21.9930222 (Bokpoort CSP Project)  |  parabolic trough  |  with 9h heat storage[45][46] | 
|  50  |  Puertollano Solar Thermal Power Plant  |    Spain  |  Puertollano, Ciudad Real  | 38°39′N 3°58′W / 38.650°N 3.967°W / 38.650; -3.967 (Puertollano) |  parabolic trough  |  Completed May 2009[47] | 
| 50 |  Alvarado I  |    Spain | Badajoz |  38°49′37″N 06°49′34″W / 38.82694°N 6.82611°W / 38.82694; -6.82611 (Alvarado I)  |  parabolic trough  | Completed July 2009[48][49][50] | 
| 50 |  La Florida  |    Spain | Alvarado (Badajoz) |  |  parabolic trough  | Completed July 2010[21][51] | 
| 50 |  Majadas de Tiétar  |    Spain | Caceres | 39°58′10″N 5°44′32″W / 39.96944°N 5.74222°W / 39.96944; -5.74222 (Majadas)  |   parabolic trough  |  Completed August 2010[21][52]  | 
| 50 |  La Dehesa |    Spain | La Garrovilla (Badajoz) | 38°57′35″N 6°27′50″W / 38.95972°N 6.46389°W / 38.95972; -6.46389 (La Dehesa)  |  parabolic trough  |  Completed November 2010[21] | 
| 50 |  Lebrija-1  |    Spain | Lebrija |   |  parabolic trough  |  Completed July 2011[21][53] | 
| 50 | Astexol 2 |    Spain | Badajoz | 38°48′42″N 7°3′36″W / 38.81167°N 7.06000°W / 38.81167; -7.06000 (Astexol)  |  parabolic trough  |  Completed November 2011, with 7.5h thermal energy storage[21][54] | 
| 50 |  Morón  |    Spain |  Morón de la Frontera  | 37°7′11.24″N 5°33′50.45″W / 37.1197889°N 5.5640139°W / 37.1197889; -5.5640139 (Morón)  |  parabolic trough  |  Completed May 2012[21] | 
| 50 |  La Africana |    Spain |  Posada  |  |  parabolic trough  |  Completed July 2012, with 7.5h thermal energy storag[21] | 
| 50 |  Olivenza 1 |    Spain |  Olivenza | 38°45′18.73″N 7°8′40.42″W / 38.7552028°N 7.1445611°W / 38.7552028; -7.1445611 (Olivenza1)  |  parabolic trough  |  Completed July 2012[21] | 
| 50 |  Orellana  |   Spain |  Orellana la Vieja  | 39°1′17.6″N 5°31′57.4″W / 39.021556°N 5.532611°W / 39.021556; -5.532611 (Orellana)  |  parabolic trough  |  Completed August 2012[21] | 
| 50 |  Godawari Green Energy Limited  |    India  |  Naukh  |  27°36′01″N 72°13′25″E / 27.60028°N 72.22361°E / 27.60028; 72.22361 (Godawari)  |  parabolic trough  |  2013[55][56][57]  | 
| 50 |  Enerstar Villena Power Plant  |    Spain  |  Villena  | 38°43′41.51″N 0°55′18.23″W / 38.7281972°N 0.9217306°W / 38.7281972; -0.9217306 (Enerstar Villena)   |  parabolic trough  |  Completed 2013[21][58] | 
| 31.4 |  Puerto Errado  |    Spain | Murcia | 38°16′42″N 01°36′01″W / 38.27833°N 1.60028°W / 38.27833; -1.60028 (Puerto Errado) |  fresnel reflector | Puerto Errado 1 completed April 2009[21][59] Puerto Errado 2 completed February 2012[21][60] | 
| 25 |  Hassi R'Mel integrated solar combined cycle power station |    Algeria | Hassi R'Mel | 33°07′29″N 03°21′07″E / 33.12472°N 3.35194°E / 33.12472; 3.35194 (Hassi R'Mel) |  ISCC with parabolic trough  | Completed June 2011[61][62] | 
| 22.5 |  Termosolar Borges |    Spain  | Borges Blanques | 41°31′49″N 0°48′10″E / 41.53028°N 0.80278°E / 41.53028; 0.80278 (Termosolar Borges) |   parabolic trough biomass hybrid |  Completed December 2012[21] | 
| 20 |  PS20 solar power tower |   Spain | Seville | 37°26′38″N 06°15′34″W / 37.44389°N 6.25944°W / 37.44389; -6.25944 (PS20 solar power tower) |  solar power tower  |  Completed April 2009 | 
| 20 |  Kuraymat Plant |    Egypt | Kuraymat | 29°16′43″N 31°14′56″E / 29.27861°N 31.24889°E / 29.27861; 31.24889 (PS20 solar power tower) |  ISCC with parabolic trough  |  Completed December 2010[62][63][64] | 
| 20 |  Ain Beni Mathar Integrated Thermo Solar Combined Cycle Power Plant  |    Morocco | Ain Bni Mathar | 34°4′11″N 2°6′18″W / 34.06972°N 2.10500°W / 34.06972; -2.10500 (Ain Beni Mathar) |  ISCC with parabolic trough  | Completed 2011 [65][66][67] | 
| 19.9 |  Gemasolar  |    Spain | Fuentes de Andalucía (Seville) | 37°33′38.17″N 05°19′53.61″W / 37.5606028°N 5.3315583°W / 37.5606028; -5.3315583 (Gemasolar solar power tower) | solar power tower  |  Completed May 2011[68] With 15h heat storage[21] | 
| 17 |  Yazd integrated solar combined cycle power station |   Iran | Yazd | 31°57′5″N 54°5′30″E / 31.95139°N 54.09167°E / 31.95139; 54.09167 (Yazd integrated solar combined cycle power station) |  ISCC with parabolic trough  |  Dedicated May 2011[69] | 
| 11 |  PS10 solar power tower |   Spain | Seville | 37°26′36.42″N 06°15′14.28″W / 37.4434500°N 6.2539667°W / 37.4434500; -6.2539667 (PS10 solar power tower) |  solar power tower  |  World's first commercial solar tower in 2007 | 
| 10 |  Delingha Solar Power Plant (Supcon)  |    China  |  Delingha | 37°21′59.42″N 97°17′33.28″E / 37.3665056°N 97.2925778°E / 37.3665056; 97.2925778 (Delingha) |  solar power tower  |  Phase 1 of project completed in July 2013,[70] total 50 MW planned[71] NREL[72]  | 
| 5 |  Greenway CSP Mersin Solar Tower Plant  |   Turkey  |  Mersin | 36°51′57″N 34°36′35″E / 36.86583°N 34.60972°E / 36.86583; 34.60972 (Greenway CSP Mersin) |  solar power tower  |  Turkey's first CSP solar tower plant[73] | 
| 5 |  Kimberlina Solar Thermal Energy Plant |   USA | Bakersfield, California | 35°34′06″N 119°12′06″W / 35.56833°N 119.20167°W / 35.56833; -119.20167 (Kimberlina) |  fresnel reflector  |  AREVA Solar, formerly Ausra demonstration plant[74] | 
| 5 |  Sierra SunTower |    USA |  Lancaster, California  | 34°46′0.0″N 118°8′0.0″W / 34.766667°N 118.133333°W / 34.766667; -118.133333 (Sierra SunTower) |  solar power tower  |  Completed August 2009[75][76][77] | 
|  5 |  Archimede solar power plant  |   Italy  | Syracuse, Sicily | 37°8′0″N 15°12′58″E / 37.13333°N 15.21611°E / 37.13333; 15.21611 (Archimede solar power plant) |  ISCC with parabolic trough  |  Completed July 2010. Equipped with heat storage.[78][79] | 
| 5 |  Thai Solar Energy (TSE) 1  |    Thailand | Huai Krachao |   |  parabolic trough  |  Completed November 2011[80] | 
| 9 |  Liddell Power Station Solar Steam Generator |   Australia | New South Wales | 32°22′26″S 150°58′40″E / 32.37389°S 150.97778°E / -32.37389; 150.97778 (Liddell Power Station, New South Wales) |  ISCC with fresnel reflector  |  Electrical equivalent steam boost for coal station[81][82] | 
| 2.5 |  Acme Solar Thermal Tower |    India  |  Bikaner, Rajasthan   | 28°11′2″N 73°14′26.4″E / 28.18389°N 73.240667°E / 28.18389; 73.240667 (ACME Solar Thermal Power Plant)  |  solar power tower  |  Completed 2012[83] | 
|  2  |  Keahole Solar Power  |    USA  |  Hawaii  | 19°42′54″N 156°2′7″W / 19.71500°N 156.03528°W / 19.71500; -156.03528 (Keahole Solar Power, Keahole Point)  |  parabolic trough  | [84][85] | 
| 1.5 |  Jülich Solar Tower |   Germany | Jülich | 50°54′54″N 06°23′16″E / 50.91500°N 6.38778°E / 50.91500; 6.38778 (Jülich) |  solar power tower  |  Completed December 2008[86] | 
| 1 |  Feranova CSP Plant  |   Turkey  |  Aydın  |  |  fresnel reflector  | Completed December 2012 | 
| 1 |  Saguaro Solar Power Station |    USA  | Red Rock, Arizona  |  |  parabolic trough  | [87] | 
| 1 |  Yanqing (DAHAN)Solar Power Station  |   China | Yanqing County | 40°22′59″N 115°56′14″E / 40.38306°N 115.93722°E / 40.38306; 115.93722 (Yanqing Solar Power Station) | solar power tower |  Completed 2012[88] | 
| 0.5 |  Shiraz solar power plant |   Iran | Shiraz | 31°56′N 54°02′E / 31.933°N 54.033°E / 31.933; 54.033 (Shiraz solar power plant) |  parabolic trough  |  Iran's first solar power plant | 
| 0.25 |  Augustin Fresnel Solar Power Station[89]  |    France  |  Targassonne  |   |  fresnel reflector  |  Prototype, Completed 2012, 0.25MWh Thermal Energy Dtorage | 
|  4,705.55  |  Overall operational capacity |