MF 77

MF 77

MF 77 on Sully Morland, Paris Métro Line 7.
In service 1978 - Current
Manufacturer Alstom, CEM-Oerlikon, Creusot-Loire, ANF-Industry, Jeumont-Schneider
Refurbishment 2007
Number built 985 cars
Formation 5 per trainset
Capacity 574 per car
Operator(s) RATP
Line(s) served Paris Métro Paris Métro Line 7 Paris Métro Line 8 Paris Métro Line 13
Specifications
Car body construction Aluminium alloy
Train length 77,400 mm (253 ft 11.2 in)
Width 2,450 mm (8 ft 0.46 in)
Maximum speed 100 km/h (62 mph) (Design)
70 km/h (43 mph) (Service)
Weight Total: 131 t (129 long tons; 144 short tons)
Motor coach: 29.5 t (29.0 long tons; 32.5 short tons)
Trailer: 21.5 t (21.2 long tons; 23.7 short tons)
Power output 1,500 kW (2,000 hp)
Acceleration 0.9 m/s2 (3.0 ft/s2)
Electric system(s) 750 V DC Third rail
Current collection method Contact shoe
Bogies Cast steel
Braking system(s) Electric braking up to 24 km/h (15 mph)
railway air brake & 1 disc brake on all the axles
1 brake with shoe on the rims of the trailer wheels.
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge

The MF 77 (abbreviated from the French: Metro Fer appel d'offre 1977) is a steel-wheeled variant of the rolling stock used on the Paris Métro. First used in 1978, it now runs on Lines 7, 8, and 13.

Unlike previous models, the MF 77 was designed for travel into the immediate suburbs of Paris, and as a result has a maximum speed of 100 km/h (62 mph) which has yet to be fully utilised. In addition, it sports a new, curved silhouette with a wider midsection. Its original exterior colours, blue and white, led passengers to refer to it as "le métro blanc," or white metro.

History

Replacing the Sprague

In the early 1970s, upon the completion of the MF 67 delivery, at the time the newest steel-wheeled trains on the Métro, many technological advances in braking and traction caused the RATP, which oversees operations of the Parisian public transport network, to examine the possibilities for new steel, rather than rubber, wheeled trains to replace the ageing Sprague-Thomson fleet. Thus, the RATP commissioned a consortium of companies including Alstom, CEM, Creusot-Loire, and Jeumont Schneider, to design a new addition to the Métro's rolling stock, the MF 77.

The RATP's goal at the time of commission was for 1,000 cars, 600 of which to contain engines for 200 five-car sets. Later, the order was reduced to 187 sets for a total for 935 cars. The first trains were delivered in the summer of 1978, the first being run on 26 September of that year on Line 13, whose MF 67 trains were transferred to Line 8. A second order of ten sets was contracted on 4 February 1983, released in 1985 and 1986.

The trains on Line 13 recently underwent their mid-life refurbishment, which included a new interior configuration, updated destination signage, lighting and mechanical improvements. However, the RATP was largely dissatisfied with the refurbishment of the Line 13 trains, citing problems with the contractor that handled the work, as well as defects in the workmanship. Though it is expected that the trains on Line 8 will be refurbished next, followed by the trains on Line 7, the RATP will explore other avenues to carry out the work, even if it means that the refurbishment is done on a lesser scale (similar to that of the refurbishment of the MF 67 on Lines 10 and 12).[1]

Technical specifications

Gallery

References

External links

Wikimedia Commons has media related to MF 77.
This article is issued from Wikipedia - version of the Monday, August 10, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.