Magat Dam
Magat Dam | |
---|---|
The dam, with its entrance sign in the foreground | |
Location of Magat Dam in Philippines | |
Location | Alfonso Lista, Ifugao / Ramon, Isabela |
Coordinates | 16°49′30″N 121°27′14″E / 16.82500°N 121.45389°ECoordinates: 16°49′30″N 121°27′14″E / 16.82500°N 121.45389°E |
Construction began | 1978 |
Opening date | 1982 |
Dam and spillways | |
Type of dam | Rock-fill dam |
Impounds | Magat River |
Height | 114 m (374 ft) |
Length | 4,160 m (13,650 ft) |
Reservoir | |
Surface area | 117 km2 (45 sq mi) |
Max. water depth | 193 m (633 ft) |
Power station | |
Installed capacity | 360 MW |
Magat Dam is a large rock-fill dam in the island of Luzon in the Philippines. The dam is on the Magat River, a major tributary of Cagayan River. Construction of the dam started in 1975 and was completed in 1982. Magat Dam is one of the largest dams in the Philippines. It is a multi-purpose dam which is used primarily for irrigating about 85,000 hectares (210,000 acres) of agricultural lands,[1] flood control, and power generation through the Magat Hydroelectric Power Plant.
The water stored in the reservoir is enough to supply about two months of normal energy requirements.[1]
The dam was constructed to last for 50 years but increased siltation and sedimentation in the reservoir, slash-and-burn farming, illegal logging and fish-caging resulted in the deterioration of the dam's watershed. The massive 1990 Luzon earthquake also contributed to the increased siltation in the Magat River system. Because of this, President Gloria Macapagal-Arroyo instructed various government agencies to create a rehabilitation plan to improve the lifespan of the dam system.[2]
History
The construction and appurtenant structures was authorized by P.D. 693 signed on May 7, 1975 by the late President Ferdinand E. Marcos. The Magat Dam was constructed in 1978 and inaugurated by the Late Pres. Ferdinand E. Marcos on October 27, 1982[1] and started operations in 1983.[3]
Implementation of this multipurpose project was based on the preliminary study conducted in 1973 by the National Irrigation Administration (NIA) with the assistance of the United States Bureau of Reclamation (USBR) and the United States Agency for International Development (USAID).
Subsequent detailed and extensive dam site investigation and engineering studies further confirmed the feasibility of what is now known as NIA's most daring infrastructure project and one of Asia's biggest dams today.
It was Southeast Asia's first large multipurpose dam.[2] The dam is part of the Magat River Multipurpose Project (MRMP) which was financed by the World Bank and whose purpose is to improve on the existing Magat River Irrigation System (MARIS) and to triple the production of rice in the Cagayan River basin.[1]
The project was jointly financed by the Philippine Government and the World Bank which extended a US$150M loan to finance the foreign exchange requirement. In addition, a US$9M loan from Bahrain was obtained for the purchase of other equipment for the diversion tunnels, soils laboratory and model testing. The total project cost is US$3.4B (yr. 1975).
The non-power components such as the dam, reservoir, and intake gates are owned, operated, and managed by the National Irrigation Administration (NIA). The hydroelectric plant was formerly owned by the National Power Corporation (NAPOCOR).[1] Under the Electric Power Industry Reform Act of 2001 (Republic Act No. 9136), the Magat hydroelectric power plant underwent a privatization process. As a result, the plant's ownership and operation was turned over to SN Aboitiz Power-Magat, Inc. (SNAP-Magat), a joint venture of a local company, AboitizPower (AP), and a Norwegian firm SN Power in April 2007.[1] SNAP won the bidding in 2006.[4]
Geography
The Magat Dam is located at the boundary between the municipalities of Alfonso Lista, Ifugao and Ramon,Isabela, approximately 350 kilometres (220 mi) north of Metro Manila.
Magat River
The Magat Dam is on the Magat River, which is the largest tributary of the Cagayan River on the island of Luzon.[5] Cagayan is the longest river in the Philippines.[5] The Magat River has an estimated yearly water discharge of 9,808 million cubic metres and has an approximate crest length of 4,160 metres (13,650 ft) with its headwaters in the province of Nueva Vizcaya and its confluence with the Cagayan River in the province of Isabela.
Features
Magat 74High Dam
Height: 314 metres (1,030 ft)
Crest Length: 4,160 metres (13,650 ft)
Volume of Rocks & Earth Materials: 18 million cubic meters
Concrete = 1.00 million cubic meters
Spillway
Length = 500 metres (1,600 ft)
Width = 164 metres (538 ft)
Discharge Cap.= 30,600 cubic meters
Radial Gates = 7 sets
Orifice Gates = 2 sets
Diversion Tunnels
Number: 2
Diameters: 2 metres (6.6 ft)
Ave.Length: 630 metres (2,070 ft)
Reservoir[6]
Storage Capacity at Full Supply Level (FSL): 1.08 billion cubic meters
Elevation at FSL: 193 masl
Minimum Supply Level: 160 masl
Maximum Flood Level: 193 masl
Power
Installed Capacity: 360 MegaWatts
Turbine: 4 Units, Francis Vertical Shaft
Generator: 4 Units x 90 MW, Vertical Synchronous
Access
It is connected by an all weather road to San Mateo-Santiago Road at Oscariz, Ramon, Isabela some 350 kilometres (220 mi) north of Metro Manila.
Magat Hydro
The hydroelectric power plant is a four-unit powerhouse with an installed capacity of 360 megawatts.[1] It is designed to accommodate two more units[7] that will allow it to generate up to 540 megawatts. The hydroelectric plant is a peaking power plant,[1] which means that it only operates when there is a high demand for electricity in the Luzon power grid, to which the plant is connected.[8]
SN Aboitiz Power-Magat, Inc. completed the half-life refurbishment of the Magat Hydroelectric Power Plant in 2014. Refurbishment began in 2009 and was completed in June 2014.[6] Half-life refurbishment ensures that the power plant facility remains available throughout its life span.
References
- 1 2 3 4 5 6 7 8 "Magat Hydro: Environmental & Social Review Summary" - International Finance Corporation (World Bank)
- 1 2 "Arroyo orders officials to formulate plan for massive rehabilitation of Magat Dam". Manila Bulletin. 2006-01-06. Retrieved 2008-04-21.
- ↑ "Magat Hydro". ifcext.ifc.org. Retrieved 2016-01-14.
- ↑ "Ifugao, Isabela share natl wealth tax over Magat dam after legal battle". GMANews.TV (GMA Network). 2008-04-04. Retrieved 2008-04-21.
- 1 2 "The Cagayan River Basin" - PAGASA. Accessed on 2008-04-21.
- 1 2 "Magat". www.snaboitiz.com. Retrieved 2016-01-14.
- ↑ "Phillippines - SNPower". www.snpower.com. Retrieved 2016-01-14.
- ↑ Visaya, Villamor Jr. (2007-07-29). "Gov't starts cloud-seeding over Magat dam". INQUIRER.net (Philippine Daily Inquirer).