Masjid Jamek LRT Station

 KJ13   ST5 
Masjid Jamek Rapid KL
 3   4   5 
Location Jalan Tun Perak
50050 WP Kuala Lumpur
Coordinates 3°8′58″N 101°41′46″E / 3.14944°N 101.69611°E / 3.14944; 101.69611
Owned by Prasarana Malaysia
Operated by Rapid Rail
Line(s) Ampang Line
Sri Petaling Line
Kelana Jaya Line
Platforms Side (Ampang Line & Sri Petaling Line)
Island (Kelana Jaya Line)
Tracks 2
Connections Bus, Taxi
Construction
Structure type Elevated (Ampang Line & Sri Petaling Line)
Underground (Kelana Jaya Line)
Platform levels 4
Parking Not available
Other information
Station code  KJ13   ST5 
History
Opened December 16, 1996 (Ampang Line & Sri Petaling Line)
June 1, 1999 (Kelana Jaya Line)
Services
Preceding station   RapidKL LRT   Following station
toward Gombak
Kelana Jaya Line
toward Kelana Jaya
toward Sentul Timur
Ampang Line
toward Ampang or Sri Petaling

Masjid Jamek LRT station is a rapid transit station in Kuala Lumpur, Malaysia. It is the interchange station between two of Rapid KL's light rail transit (LRT) lines, namely the Ampang Line, Sri Petaling Line and the Kelana Jaya Line. The station is situated near, and named after the Masjid Jamek in central Kuala Lumpur.

Despite being called an interchange station, up until 28 November 2011, there were effectively two Masjid Jamek stations in operational terms. An elevated Masjid Jamek station served the Ampang Line while an underground Masjid Jamek station served the Kelana Jaya Line, each having their own ticketting systems which were not integrated with each other's. Commuters had to exit one system, purchase a new ticket before entering the other system if they wanted to transfer from one line to the other.

Prior to 2006 when a plaza was built above the Klang River linking the stations, Ampang Line's Masjid Jamek station and Kelana Jaya Line's Masjid Jamek station were two physically separate buildings. There were limited pedestrian walkways between the two stations resulting in commuters having to be exposed to the sun and rain, and even having to cross the busy Jalan Tun Perak, just to change from one line to the other.

On 28 November 2011, the fare gates which kept the two systems separated were removed and the plaza which physically linked the two stations became part of the "paid (or restricted) zone" of a physically integrated Masjid Jamek Station. This allowed commuters to transfer from one line to the other without leaving the system for the first time since the two stations became operational.

History

Whiteaway Laidlaw Building

During British rule and up to 1995 the site of the present-day Masjid Jamek station was occupied by the Whiteaway Laidlaw Building,[1][2] a departmental store.

Ampang Line station

Opened on December 16, 1996 as part of the first phase of the then STAR system (Phase 1), the Ampang Line station was constructed directly above a bridge along Jalan Tun Perak that crosses the Klang River shortly before the Klang River-Gombak River confluence: Its elevated tracks and side platforms are suspended above Jalan Tun Perak, while the ticketing concourses are located over the Klang River, at street level.

The station, similar to surface-level stations from the Chan Sow Lin-Ampang line, has one ticketing concourse for each of the two platforms. The two concourses and their exits are located on both sides of Jalan Tun Perak, and are not integrated with each other. The northern concourse and platform is designated for trains bound for either the Ampang and Sri Petaling stations, while the southern concourse and platform are designated for trains bound for the Sentul Timur station at the northern end of the line.

Kelana Jaya Line station

The second Masjid Jamek rapid transit station was opened on June 1, 1999 as part of the second phase of the Kelana Jaya Line (known as Section 2).

The Kelana Jaya Line station, like other stations along the subway stretch of the Kelana Jaya Line, is an underground rapid transit station that consists of a single island platform (separated from the tracks by platform screen doors) connected to a single ticketing concourse via stairways, escalators and an elevator.

The main entrance of the Kelana Jaya Line station was situated directly north of the Ampang Line station, exiting into Jalan Melaka, and Jalan Melayu via a footbridge over the Klang River. This excess has now been converted into the transit plaza and is directly connected with the former concourse for Platform 2 (Ampang- and Sri Petaling-bound platform) of the Ampang Line. A secondary access point was located south from the Ampang Line station on the other side of Jalan Tun Perak, connected to the station's ticketing concourse via a long underground tunnel that passes underneath Jalan Tun Perak. The underground tunnel has since been converted into the paid or restricted area connection for transfers between the Kelana Jaya Line and Platform 1 (Sentul Timir-bound platform) of the Ampang Line. As such, the former exit at the end of the tunnel to Jalan Benteng has been closed. (see below)

Integrated Masjid Jamek Station

Despite the proximity of the Masjid Jamek Ampang Line and Masjid Jamek Kelana Jaya Line stations, they were essentially two separate stations operating independently from each other and which did not provide any transfer convenience to passengers switching from one line to the other. In fact, even passengers on the Ampang Line who wanted to change their direction of travel at this station could not do so without exiting the turnstiles at the concourse of one side of Jalan Tun Perak, crossing Jalan Tun Perak, and then buying a new ticket at the concourse on the other side of the road to resume their journey.

When Syarikat Prasarana Negara Berhad took over the ownership of both the Ampang Line and Kelana Jaya Line, the opportunity came to properly integrate the two lines physically and in terms of ticketing systems. In November 2006, construction of a plaza over the Klang River which would eventually create a physical linkage between the Kelana Jaya Line station with the concourse of Platform 2 of the Ampang Line station began. Called Phase 1 of the Integrated Masjid Jamek Station project, the works were completed in October 2008 and the plaza was opened to the public on 15 November 2008.[3] However, as the two lines still had two separate ticketing systems, the actual physical linkage could not be opened and both stations still had separate entrances.

Phase 2 of efforts to integrate the two Masjid Jamek stations, which began in April 2010, then saw the physical linking up of the plaza with the concourse for Ampang- and Sri Petaling-bound trains of the Ampang Line (Platform 2); the reconfiguration of the entrances, turnstiles and ticketing office of this councourse; and the raising of the floor level of this concourse to be the same level as the plaza. The station was also upgraded to include lifts and ramps to make it accessible to the disabled.

The final steps in the integration process involved the relocation of the turnstiles for the Kelana Jaya Line from Level B1 to the Ground Level Transit Plaza. This essentially converted the entire Level B1 of the Kelana Jaya Line station into a paid area (previously, it was partially paid and unpaid) while part of the Ground Level Plaza became a paid area with the new entrance into the Kelana Jaya Line (as well as the entrance for Ampang- and Sri Petaling-bound trains of the Ampang Line ) being relocated to this level. The underpass which previously allowed passengers to access Jalan Benteng without needed to cross Jalan Tun Perak from the Kelana Jaya concourse Level B1 was converted into a paid area for passengers transferring between the Kelana Jaya Line and the Ampang Line Station Platform 1 (Sentul Timur-bound). As the underpass was now a restricted area, access to and from Jalan Benteng was sealed-off. The Kelana Jaya Line ticketing office on Level B1 was then closed and integrated with what was previously the Ampang Line ticketing office at the Ground Level Plaza.

On 28 November 2011, the integration process was completed and for the first time, passengers from the Kelana Jaya Line could transfer onto the Ampang Line and vice versa without needing to buy new tickets.

Station layout

L1 Ampang Line Platform Level
Side platform, doors will open on the left
Platform 1 Ampang Line towards  ST11  Sentul Timur (→)
Platform 2 Ampang Line towards  AG8  Ampang or  PH8  Sri Petaling via  AG1   ST1   PH1  Chan Sow Lin (←)
Side platform, doors will open on the left
G Ampang Line Platform 1 concourse Ticketing Machines, Faregates and Exit to Jalan Tun Perak, Station Control, Staircase and Escalator to/from Transit Linkway to Transit Plaza, Ampang Line Platform 2 concourse and Kelana Jaya Line Concourse
Street Level Jalan Tun Perak, Bus Stop, Taxi Lay-by, Pedestrian Crossing
Ampang Line Platform 2 concourse
Transfer Plaza
Ticketing Machines, Ticketing Counters, Faregates and Exit to Jalan Tun Perak, Jalan Melaka and Jalan Melayu, Station Control
B1 Kelana Jaya Line Concourse Station Control
Transfer Linkway Transfer Linkway between Ampang Line Platform 1 and Kelana Jaya Line Concourse, Escalator and Stairs from Transfer Linkway to Ampang Line Platform 1 Concourse
B2 Kelana Jaya Line Platform Level Platform 1 Kelana Jaya Line towards  KJ1  Gombak (→)
Island platform, doors will open on the right
Platform 2 Kelana Jaya Line towards  KJ24  Kelana Jaya (←)

Additional images

Around the Station

References

  1. http://s654.photobucket.com/user/taurus64/media/2d64252d-02d2-48f3-a5fb-6bf1a546b9bf_zpsabbcec71.jpg.html. Retrieved 21 October 2013. Missing or empty |title= (help)
  2. "Malaysia 1994". Retrieved 1 December 2013.
  3. Fazleena Aziz (2008-11-07). "Masjid Jamek Plaza to open on Nov 15". The Star.