Maziba Hydroelectric Power Station
Maziba Power Station | |
---|---|
Map of Uganda showing the location of Maziba | |
Country | Uganda |
Location | Maziba, Kabale District |
Coordinates | 01°19′07″S 30°04′44″E / 1.31861°S 30.07889°ECoordinates: 01°19′07″S 30°04′44″E / 1.31861°S 30.07889°E |
Status | Under construction |
Commission date | 2017[1](Expected) |
Owner(s) | Muvumbe Hydro Uganda Limited |
Power generation | |
Nameplate capacity | 6.5 MW (8,700 hp) |
Maziba Hydroelectric Power Station is a 6.5 megawatts (8,700 hp) hydroelectric power station under construction in Uganda. The power station is sometimes referred to as the "Muvumbe Power Station".[1]
Location
The power station is being built across the River Nyakizumba (also known as the River Maziba or the River Muvumbe), a tributary of the Kagera River.[1] The station will be in Kigarama village in Nyanja parish, Maziba Sub-county, Kabale District, in southwestern Uganda, close to the international border with Rwanda.[1] This is approximately 10 kilometres (6.2 mi), by road, east of the town of Kabale, where the district headquarters are located.[2] Maziba is approximately 410 kilometres (250 mi), by road, southwest of Kampala, the capital and largest city of Uganda.[3] The coordinates of the power station are 1°19'07.0"S, 30°04'44.0"E (Latitude=-1.318611; Longitude=30.078889).[4]
History
The planned power plant lies at the site of a smaller 1.6 megawatts (2,100 hp) hydroelectric power plant that was constructed in 1966 but went out of commission in 2002 due to disrepair and silting.[5] In 2009, a new feasibility study was carried out by Lahmeyer International, a German consulting engineering firm, paving way for the new power plant.[6] In April 2014, Muvumbe Hydro (Uganda) Limited applied for a power production license from the Electricity Regulatory Authority to generate and sell 6.5 megawatts of hydroelectric power at this power station. The power will be sold to the Uganda Electricity Transmission Company Limited and integrated into the national grid.[7] Construction started in September 2015 and is expected to last 18 months.[1]
Construction costs
The estimated costs for the dam and power plant is approximately US$18 million (UShs:64 billion).[1] Construction funds will be sourced jointly by the Sri Lankan developers and the government of Uganda[8] In January 2015, Ugandan Prime Minister Ruhakana Rugunda indicated that funding for the dam had been secured from Germany. Muvumbe Hydro Uganda Limited, a subsidiary of Vidullanka Plc. of Sri Lanka, owns the development rights to the project.[9]
See also
References
- 1 2 3 4 5 6 Muhereza, Robert (23 September 2015). "Work on Shs64b Kabale hydropower dam starts". Daily Monitor. Kampala. Retrieved 23 September 2015.
- ↑ "Road Distance Between Kabale And Maziba With Map". Globefeed.com. Retrieved 8 May 2014.
- ↑ "Map Showing Kampala And Maziba With Distance Marker". Globefeed.com. Retrieved 8 May 2014.
- ↑ Google (23 September 2015). "Location of Maziba Power Station At Google Maps" (Map). Google Maps. Google. Retrieved 23 September 2015.
- ↑ "Rehabilitation Small Hydropower Station Maziba Gorge". Lahmeyer International. Archived from the original on April 13, 2014. Retrieved 8 May 2014.
- ↑ "Consulting For Maziba Hydro-Power Plant In Uganda". Devex.com. Retrieved 8 May 2014.
- ↑ ERA (8 April 2014). "Application For A License for The Establishment of 6.5MW Hydro Power Plant In Kabale District". Electricity Regulatory Authority (ERA). Retrieved 10 January 2015.
- ↑ Our, Reporter (26 August 2013). "Kabale To Get 6.5 MW Power Station". Red Pepper (Uganda). Retrieved 8 May 2014.
- ↑ Mwesigwa, Alon (20 January 2015). "Germany to fund Kabale power dam". The Observer (Uganda). Kampala. Retrieved 17 January 2016.
External links
|