Munich–Augsburg railway

Munich–Augsburg
Overview
Locale Bavaria, Germany
Line number
  • 5503 (Munich–Augsburg)
  • 5543 (Munich–Mammendorf)
  • 5581 (Olching–Augsburg)
Technical
Line length 61.9 km (38.5 mi)
Number of tracks 4 or more
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 15 kV/16.7 Hz AC catenary
Operating speed 230 km/h (140 mph) (maximum)
Route number 980, 999.4
Route map
Legend
from Nuremberg, from Ulm
61.9 Augsburg Hbf
Gögginger Brücke(planned station)

to Buchloe
and Landsberg am Lech
60.2 Augsburg Haunstetter Straße
Lochbach
B 300
Spitalbach
Augsburg local railway freight railway
59.1 Augsburg-Spickel(closed 1974)
Augsburg Eiskanal
Lech
56.9 Augsburg-HochzollKeilbahnhof
Paar Valley Railway to Ingolstadt
52.0 Kissing
48.0 Mering-St Afra
Paar
46.1 Mering
Ammersee Railway to Weilheim
39.8 Althegnenberg
36.7 Haspelmoor
31.0 Mammendorf(beginning of )
27.8 Malching (Oberbayern)
24.8 Maisach(S-Bahn double track)
21.6 Gernlinden
20.4 Esting
19.0 Olching
Munich North Ring
15.6 Gröbenzell
12.3 Munich-Lochhausen
A 99
10.0 Munich-Langwied
from Munich-Pasing Bbf
Allgäu Railway from Buchloe
München-Pasing Nord junction
from Herrsching, from Garmisch-Partenkirchen
7.4 Munich-Pasing
München-Pasing freight yard
Würm
to München-Laim marshalling yard
from Ingolstadt, from Regensburg
(Flying junction of the S-Bahn)
4.1 München-Laim
Munich South Ring
2.8 München Hirschgarten
2.2 from ICE-Werk München
2.0 München-Neuhausen junction
from Rosenheim
from Holzkirchen
1.6 München Donnersbergerbrücke
0.8 München Hackerbrücke
City-Tunnel entrance (S-Bahn trunk line)
0.0 Munich Hbf
to München Ost

Source: German railway atlas[1]

The Munich–Augsburg line connects Munich and Augsburg in the German state of Bavaria. It was built by the Munich-Augsburg Railway Company and opened in 1840. It was nationalised in 1846 and extended to Ulm in 1854. The line between Augsburg and Munich is a major traffic axis and part of the Magistrale for Europe from Budapest through Vienna to Paris.

History

The line was built by the Munich-Augsburg Railway Company (German: München-Augsburg Eisenbahn-Gesellschaft) and opened in 1839 and 1840. The Munich-Augsburg Railway Company was nationalised on 1 June 1846 and taken over by the Royal Bavarian State Railways (Königlich Bayerische Staats-Eisenbahnen). The line became part of Bavarian Maximilian’s Railway (Bayerische Maximiliansbahn) and was extended to Ulm on 1 May 1854. After the nationalisation of the line in 1846 a new Augsburg station was built at Rosenauberg along with new rail facilities in nearby Oberhausen. The old stations at the Roten Tor (Red Gate) and in Oberhausen were abandoned.[2]

Between 26 June 1965 and 3 October 1965, two pairs of trains per day using Class E 03 locomotives ran at 200 km/h on the line for the 1965 International Transport Exhibition in Munich, taking 26 minutes to complete the run. From May 1968 two trains, "Blauer Enzian" and "Rheinblitz", ran on the same route at a scheduled speed of 200 km/h.

In 1977 the 42.7 km long section between Lochhausen and Augsburg-Hochzoll, was put into operation with a regular permitted speed of 200 km/h. For the first time in Germany numerous trains could reach this speed in regular commercial operations.

Upgrade

Freight train passes to new work at Mammendorf, February 2010.
New work near Hattenhofen
New line being built on sand embankment at Haspelmoor

The 43 km section between Augsburg and Olching line was rebuilt to four-tracks between 1998 and 2011 to carry significantly more traffic. One pair of tracks was dedicated to regional services (RB, RE) and goods traffic and the other to (IC/EC) and high-speed traffic (ICE) services. Heavy and more slowly running freight trains no longer obstruct the passage of faster ICEs. The permitted speed on the high-speed tracks is now 230 km/h.[3] Infrastructure for regional trains allows operations at 160 km/h.[3] On the line between Olching and Munich, freight, regional trains, and the Munich S-Bahn have their own tracks.

The railway upgrading work was divided into six sections for planning purposes. Work began on the western section between Augsburg and Kissing in February 1998[4] and the new tracks were brought into service in 2003. A new bridge was built over the Lech in Augsburg in 2002 and in the same year work began on the eastern section between Mering and Olching.

Dedication on 10 December 2011

On 6 June 2011, the conversion of the line to four-track operation was completed,[5] but the two high-speed tracks were not yet passable at 230 km/h. On 10 December 2011 the railway was dedicated with a new speed limit of 230 km/h after 13 years of building.[6]

Dates and facts

The upgrading involved: acquisition of 95.3 hectares of land, 43 km of additional railway embankment, 7.5 km of new retaining walls, 116 km of new track and 104 points moved, 52 railway and 19 road bridges reconstructed or adapted, 46 km of noise barriers, nine island platforms and three passing lines adapted or rebuilt

In the federal transport investment plan for 2010, federal funding for the project was estimated to be € 556 millions for the first stage of development (2006 prices). € 303.5 millions had been spent up to 2005. € 215 million of federal funds were to be invested between 2006 and 2010. Beyond this period a shortfall of € 37.6 millions had to be made up.[7]

Operations

The line between Augsburg and Munich is a major traffic axis and part of the Magistrale (trunk line) for Europe from Budapest through Vienna to Paris. It is used daily by about 300 trains and is one of Germany’s busiest line with a mixture of goods trains, regional passenger trains and long-distance high-speed trains.

Each hour an Intercity-Express train and an InterCity train run from Munich via Ulm to Stuttgart. Additional ICE trains run from Munich to Augsburg, branching to Nuremberg or Würzburg and on to further destinations. A similar service pattern also operates in the reverse direction.

Regional-Express trains also run hourly between Munich and Augsburg, alternating to/from Ulm and Donauwörth.

From Mammendorf to Munich central station the line runs parallel to line S3 of the Munich S-Bahn of the MVV.

Notes

  1. Eisenbahnatlas Deutschland (German railway atlas). Schweers + Wall. 2009. ISBN 978-3-89494-139-0.
  2. Wolfgang Klee (1994). Bayerische Eisenbahngeschichte - part 1: 1835-1875, Bayern Report 1 (in German). Fürstenfeldbruck: Hermann Merker Verlag.
  3. 1 2 DB ProjektBau GmbH (ed.). Ausbaustrecke Augsburg–München. Bauen bei der Deutschen Bahn (in German). Hamburg 2011, ISBN 978-3-7771-0434-8: DVV Media Group. pp. 26 f, 29–32, 38.
  4. Umsetzung von Projekten des Neubaus, Ausbaus und der Erhaltung der Bundesschienenwege in Bayern (PDF) (in German). Deutscher Bundestag. 27 January 2009. Retrieved 20 January 2013 (Federal Government response to question from Dr. Anton Hofreiter, Bettina Herlitzius, Winfried Hermann, other MPs and Alliance '90/The Greens, printed material 16/11730)
  5. "München–Augsburg quadrupling". Today's Railways Europe (188): 53. August 2008.
  6. "München - Augsburg: Ein Feuerwerk für die "Rennstrecke"" (in German). 10 December 2011. Retrieved 15 December 2011.
  7. "Investitionsrahmenplan bis 2010 für die Verkehrsinfrastruktur des Bundes" (PDF) (in German). Bundesministerium für Verkehr, Bau und Stadtentwicklung. April 2007. Retrieved 15 December 2011.
Wikimedia Commons has media related to Munich–Augsburg railway.
This article is issued from Wikipedia - version of the Thursday, April 21, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.