North–South Expressway (Singapore)
North–South Expressway Lebuhraya Utara-Selatan 南北高速公路 வடக்கு-தெற்கு விரைவுச்சாலை | |
---|---|
North - South Expressway is labelled in single violet line | |
Route information | |
Length: | 21.5 km (13.4 mi) |
History: | TBA |
Major junctions | |
North end: | Admiralty Road West |
SLE, PIE, CTE, ECP | |
South end: | ECP, Republic Avenue and Nicoll Highway |
Highway system | |
Expressways of Singapore |
The North–South Expressway (Abbreviation: NSE) will be the 11th of Singapore's network of expressways when completed. The North South Expressway will serve increasing traffic along the north-south corridor that is currently served by the Central Expressway (CTE). This new expressway was announced on 30 January 2008 as part of a major review of Singapore's transport network by the Land Transport Authority (LTA). The 21 kilometres (13 mi) expressway would cost about S$7–8 billion when fully completed in 2023 as North-South Tunnel and will connect the East Coast Parkway (ECP) with the northern parts of Singapore.[1]
On 19 Jan 2011, the government gave the green light to build the expressway between Admiralty Road West and Toa Payoh Rise. On 15 November 2011, LTA unveiled the full alignment of the North-South Expressway. Advance work begun in 2013, and major construction works will commence in 2016.[2][3] The North South Expressway will have a total of 16 entrances and 17 exits to connect towns along the north-south corridor—Woodlands, Sembawang, Yishun, Ang Mo Kio, Bishan and Toa Payoh—with the city centre. The NSE will also provide links to existing expressways, including the Seletar Expressway (SLE), Pan-Island Expressway (PIE) and East Coast Parkway (ECP).[2]
Route
In the final plan, the NSE will commence at Admiralty Road West in northern Singapore and proceed southwards along Woodlands Ave 8, Gambas Ave, Sembawang Road. It will join Lentor Ave and intersect the Seletar Expressway. It will be a semi-tunnel between Ang Mo Kio Avenue 6 and Avenue 9, and an underground tunnel to Marymount Road. It will pass Toa Payoh Rise, join Thomson Road and Bukit Timah Road running parallel to the Central Expressway. The NSE will carry on along Ophir Road, joining the East Coast Parkway at its southern terminus.
Some land has to be acquired by the government for the project. The Land Transport Authority tried to utilize state land as far as possible, reducing the number of private properties that have to be acquired. Despite much of the expressway running underground at its southern end, some land had to be taken because of existing Mass Rapid Transit tunnels, and also because the expressway had to be straight to maintain traffic speeds. One of the prominent landmarks that has to make way for the project is the Rochor Centre.[4]
References
- ↑ "Speech by Mr. Raymond Lim, Minister for transport, at visit to , 30 January 2008, 10.15 AM". Singapore Government Media Release. 30 January 2008.
- 1 2 "Full alignment of the North-South Expressway unveiled" (Press release). Land Transport Authority. 2011-11-15.
- ↑ "North-South Expressway construction will only start in 2016: Lui". Channel NewsAsia. 2015-01-21.
- ↑ Hetty Musfirah (2011-11-15). "New expressway sparks big land acquisition". Channel NewsAsia.
|
|