Northern Alberta Railways

Northern Alberta Railways
Reporting mark NAR
Locale Alberta, British Columbia
Dates of operation 19291981
Successor Canadian National Railway and Canadian Pacific Railway (jointly)
Track gauge 4 ft 8 12 in (1,435 mm) standard gauge
Headquarters Edmonton, Alberta

Northern Alberta Railways
in 1931

Legend
Dawson Creek

Pouce Coupe
Gundy

proposed line
Tupper
British Columbia
Alberta

Demmitt
Lymburn
Hythe
Albright
Beaverlodge
Huallen
Wembly
Dimsdale
Grande Prairie
Clairmont
Sexsmith
Webster
Braeburn
Woking
Esher

Spirit River
Rycroft
Hines Creek
Prestville
Gage
Manir
Fairview
Wanham
Bluesky
Belloy
Whitelaw
Rahab
Brownsvale
Eaglesham
Berwyn
Tangent
Grimshaw
Watino
Roma
Smoky River

Manning
Culp
Peace River
Girouxville
Judah
Dreau
Nampa
Falher
Reno
Donnelly
Springburn
Winagami
Roxana
McLennan
Kathleen
Kenzie
Aggie
High Prairie
Enilda
McMurray
Arcadia
Waterways Draper
Indiana
Lynton
Driftpile
Lenarthur
Faust
Anzac
Kinuso
Kinosis
Assineau
Cheecham
Widewater
Warper
Wagner
Quigley
Slave Lake
Pingle
Mitsue
Chard
Overlea
Leismer
Saulteaux
Christina River
Spurfield
Conklin
Decrene
Devenish
McLeod River
Margie
Smith
Behan
Hondo
Philomena
Chisholm
Pitlochrie
Flatbush
Tweedie
Kilsyth
Barnegat
Fawcett
Lac La Biche
Jarvie
Venice
Dapp
Hylo
Pibroch
Noral
Westlock
Caslan
Picardville
Bondiss
Barrhead
Boyle
Pembina River
Ellscott
Manola
Alpen
Highridge
Newbrook
Arvilla
Abee
Thorhild
Busby
Egremont
Alcomdale
Opal
Mearns
Fedorah
Morinville
Bon Accord
Roserhige
Excelsior
Carbondale
Campbell
Edmonton CNR
Calder CNR
Strathcona CPR

Northern Alberta Railways (reporting mark NAR) was a Canadian railway which served northern Alberta and northeastern British Columbia. Jointly owned by both Canadian National Railway and Canadian Pacific Railway, NAR existed as a separate company from 1929 until 1981.[1]

Predecessor railways

Railway construction in northern Alberta during the early 20th century was dominated by the Grand Trunk Pacific Railway and the Canadian Northern Railway, both of which were building westward from Edmonton, Alberta, to the Yellowhead Pass of the Rocky Mountains.

Following the Dominion Land Survey grants to settlers, the Peace River region of northwestern Alberta was one of the few places left on the prairies with available agricultural land; however, there was no railway connection.

Several lines were chartered to serve both the Peace River and Waterways regions of the province, beginning with the Athabaska Railway in 1907. It was to build northeast from Edmonton to Dunvegan, Alberta, then to Fort George, British Columbia.

Edmonton, Dunvegan and British Columbia Railway

The company was rechartered in 1911 under the ownership of J.D. McArthur as the Edmonton, Dunvegan and British Columbia Railway (ED&BC). Construction of the ED&BC started in 1912 heading toward Westlock, Alberta, reaching High Prairie in 1914, and Spirit River in 1915. The railway decided not to proceed to Dunvegan, and instead built a branch south from Rycroft to Grande Prairie in 1916 (400 miles or 640 kilometres northwest from Edmonton).

In 1924 the line was extended to Wembley, and it reached Hythe in 1928. In 1930 the line was extended westward across the provincial boundary to its western terminus at Dawson Creek, British Columbia.

Alberta and Great Waterways Railway

View of the Waterways station, about 1920.

In 1909 a charter was granted to the Alberta and Great Waterways Railway (A&GW) to build from Edmonton to Waterways, Alberta, on the Athabasca River. Construction faltered and the A&GW political scandal ensued, and the line was rechartered in 1913 under the ownership of J.D. McArthur. Construction of the A&GW began in 1914 from Carbondale, Alberta, and reached Lac La Biche, Alberta, in 1916. It reached Draper, Alberta, in 1922 and its terminus at Waterways in 1925. The railway was transferred to ownership of the Government of Alberta on July 28, 1920.[2]

Central Canada Railway

In 1913 a charter was granted to the Central Canada Railway (CCR) under the ownership of J.D. McArthur to build from Winagami Junction, Alberta, on the ED&BC to Peace River Crossing, Alberta, in order to access barge traffic on the Peace River. Construction of the CCR began in 1914 and was completed in 1916.

The CCR was subsequently extended to Berwyn, Alberta, in 1921, then to Whitelaw, Alberta, in 1924, Fairview, Alberta, in 1928 and Hines Creek, Alberta, in 1930.

Pembina Valley Railway

In 1926, the provincial government passed a statute authorizing the government to construct the Pembina Valley Railway from Busby, Alberta, where it connected to the ED&BC line, to Barrhead, Alberta.

Provincial ownership

In 1920, the lines owned by J.D. McArthur entered financial difficulties following the First World War. Coinciding with the problems faced by the McArthur lines (ED&BC, A&GW, and CCR), both the Grand Trunk Pacific Railway (GTPR) and Canadian Northern Railway (CNoR) had fallen victim to similar circumstances brought about by the financial strain of the conflict and falling traffic levels. The Dominion government had nationalized the GTPR and CNoR, along with other previously federally owned lines into the Canadian National Railways.

Following the federal example, and in an attempt to preserve rail service to northern and northwestern Alberta, the provincial government leased the ED&BC and CCR in 1920 for five years. In 1921 the government entered into a five-year agreement with the Canadian Pacific Railway (CPR) to operate the ED&BC and CCR.

In 1920, the provincial government purchased the A&GW outright and chose to operate it separately.[3]

CPR immediately raised freight rates on the ED&BC and CCR lines, charging "mountain prices", claiming that the cost of operating on grades into the Peace and Smoky River valleys of the northwestern prairie was as much as it cost to operate in the Rocky Mountains. Consequently Peace River farmers paid the highest freight charges on the Canadian prairies to reach the lakehead at Port Arthur and Fort William.

The provincial government purchased the ED&BC and CCR from McArthur in 1925, following the expiration of the five-year lease. Dissatisfied with the CPR's operation of the ED&BC and CCR, the provincial government allowed the operating contract for the these railways to expire in 1926, with operations subsequently taken over by the new provincial Department of Railways and Telecommunications, which was also tasked to operate the AG&W and the newly built PVR.

In 1928, the provincial government began to solicit proposals from both the CPR and the Canadian National Railways (CNR) for purchasing the provincial railways. In 1924, CNR president Sir Henry Thornton visited the ED&BC line and in 1928, CPR president Edward Beatty did the same.

Northern Alberta Railways

In 1928 the provincial government grouped the ED&BC, CCR, AG&W, and PVR under the collective name Northern Alberta Railways (NAR), which received a federal charter on March 1929. Under UFA Premier Brownlee, the NAR was sold to both the CNR and CPR in equal portions with both companies agreeing to maintain the NAR as a joint subsidiary. At that time, the NAR was the third-largest railway in Canada. In 1937 the NAR began to show a profit for the first time.

Preserved NAR baggage car.

In summer 1942, following the entry of the United States into the Second World War, the Alaska Highway civil defence project resulted in tremendous growth for the NAR, as the system was the only railway to service Alaska Highway mile 0 at Dawson Creek, British Columbia.

NAR also saw increased traffic from defence spending in both the Peace River and Fort McMurray regions as Royal Canadian Air Force training bases for the British Commonwealth Air Training Plan were established.

In 1958 the Pacific Great Eastern Railway (PGE), owned by the province of British Columbia, built east to Dawson Creek and then north to Fort St. John. Traffic from Dawson Creek which used to run on NAR now mostly ran on PGE.

NAR's locomotive fleet was completely dieselized by October 1960 with EMD GP9's 201–210 (208 was wrecked, rebuilt and renumbered 211 in 1972.), and GMD GMD1's 301–305. NAR also purchased two Canadian National GMD1's, numbers 1072 and 1077, in January 1962, and renumbered them 311 and 312 respectively. A final locomotive purchase was made in December 1975 for EMD SD38-2's 401–404.

Beginning in the 1960s, Alberta's nascent oil and gas industry began to have an impact on the NAR as traffic began to increase on both the Dawson Creek and Fort McMurray branches. In 1964, the federal government built the Great Slave Lake Railway north from the NAR at Grimshaw, Alberta, to Hay River, Northwest Territories, to carry cargo which could then be transferred to barges and continue down the Mackenzie River.

In 1966, the passenger train to Waterways was replaced by Budd Rail Diesel Cars, but the experiment was unsuccessful, and it was replaced in 1967 by a mixed train. On June 1, 1974, the passenger train to Dawson Creek was discontinued.

During the 1970s, significant investments also began in the Fort McMurray region as the Athabasca Oil Sands deposits began to be exploited.

Canadian National Railway

On January 1, 1981, CN (name/initialism change after 1960) bought out CPR's share in the NAR system and incorporated these lines into the CN network, allowing CN to operate unhindered north from Edmonton to Hay River, Northwest Territories, and west to Dawson Creek, British Columbia. NAR disappeared as a corporate entity with the departure of CPR from the joint ownership. NAR shops and Dunvegan Yards in Edmonton were demolished and the new Dunvegan Woods housing development was built on the site.

In 1996, CN identified parts of its former NAR trackage for divestiture, either through sale or abandonment. Several lines were subsequently sold to shortline operators.

References

  1. Parks, Richard (21 September 2011). "Northern Alberta Railways". Passenger Railroads of the 1930's-1940's in North America. Richard Parks. Retrieved 5 January 2013.
  2. Edmonton Bulletin, July 29, 1920
  3. Edmonton Bulletin, July 29, 1920)
  4. CN news release
  5. Cando

External links

This article is issued from Wikipedia - version of the Monday, March 07, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.