SR U class

SR U class[1]

Preserved SR U class number 1638 on the Bluebell Railway
Type and origin
Power type Steam
Designer Richard Maunsell
Builder
Build date 19281931
Total produced 50
Specifications
Configuration 2-6-0
UIC class 1′C h2
Gauge 4 ft 8 12 in (1,435 mm) standard gauge
Leading dia. 3 ft 1 in (0.940 m)
Driver dia. 6 ft 0 in (1.829 m)
Length 57 ft 10 in (17.63 m)
Total weight 110 long tons 14 cwt (248,000 lb or 112.5 t)
Fuel type Coal
Fuel capacity 5 long tons 0 cwt (11,200 lb or 5.1 t)
5 long tons 0 hundredweight (5.1 t; 5.6 short tons)
Water cap
  • 4,000 imp gal (18,200 l; 4,800 US gal)
  • 3,500 imp gal (15,900 l; 4,200 US gal) on earlier tenders
Boiler pressure 200 lbf/in2 (1.38 MPa)
Cylinders Two, outside
Cylinder size 19 in × 28 in (483 mm × 711 mm)
Performance figures
Tractive effort 23,866 lbf (106.16 kN)
Career
Operators
Class SECR / SR: U
Power class
  • LSWR / SR: B
  • BR: 4P3F
Withdrawn 1962–1966
Disposition Four preserved, remainder scrapped

The SR U class were 2-6-0 (mogul) steam locomotives designed by Richard Maunsell for passenger duties on the Southern Railway (SR). The class represented the penultimate stage in the development of the Southern Railway’s mogul "family", which improved upon the basic principles established by GWR Chief Mechanical Engineer (CME) George Jackson Churchward for Great Western Railway (GWR) locomotives.[2] The U class design drew from experience with the GWR 4300 and N classes, improved by applying Midland Railway ideas to the design, enabling the SECR to influence development of the 2-6-0 in Britain.[3]

The U class was designed in the mid-1920s for production at a time when more obsolete 4-4-0 locomotives were withdrawn, and derived from Maunsell’s earlier SECR K (“River”) class 2-6-4 tank locomotives. The first 20 members of the U class were rebuilds of the K class locomotives, one of which was involved in the Sevenoaks railway accident. A further 20 U class locomotives were built in 1928 to fill the gap in cross-country and semi-fast express passenger services after the withdrawal of the K class. The design also continued the standardisation of the Southern Railway locomotive fleet by using parts designed to be interchangeable with other Maunsell-designed classes.

A total of 50 locomotives were built over three batches between 1928 and 1931, and the design formed the basis for the 3-cylinder U1 class of 1928. They were able to operate over most of the Southern Railway network, gaining the nickname "U-Boats" after the submarine warfare of the First World War, and continued to operate with British Railways (BR). The class saw continuous use until 1966, when all members of the U class were withdrawn from service.[4] Four U class locomotives have been preserved on two heritage railways in the south of England.[5]

Background

The history of the U class is complex as it is linked to the fate of the 2-cylinder K ("River") class 2-6-4 tank locomotives. The design work had for a new passenger 2-6-0 with 6 ft (1.83 m) driving wheels was complete by 1927, when the involvement of a K class locomotive in the Sevenoaks rail crash presented an opportunity to bring forward construction of the class.[6] The K class tank engines were the passenger counterpart to the N class 2-6-0 mixed-traffic design, and were noted for rough-riding over the cheaply laid track of the former SECR.[7] The class was withdrawn from service, and the inquiry that followed determined that the rough-riding contributed to the crash.[6] Its recommendation was that the K class should be rebuilt to 2-6-0 tender locomotives, using tried and tested features used by Maunsell and his assistant, the former GWR engineer Harold Holcroft on the N class.[8]

The N class principles applied to the U class design aided mass production, and incorporated several features found on the GWR 4300 Class locomotives designed by Churchward.[7] An order made in 1926 for a second batch of 20 K class locomotives was delayed until 1928, when the specification was revised to construct U class locomotives.[6] It was intended to replace several elderly 4-4-0 classes within the former SECR's running fleet, and attempted to standardise and ease maintenance of locomotives by sharing parts with other Maunsell designs.[3] The style of the new locomotive reflected the Midland Railway influence of another of Maunsell’s assistants, the ex-Midland Railway engineer James Clayton.[9] The addition of a tender increased the operating range of the U class over its K class predecessors, and the wheel arrangement applied to the former K class locomotives improved the locomotive’s stability when operational.[2]

Construction details

The prototype K class No. 790 under SECR ownership. All 20 members of the class were rebuilt to the U class design in 1928

K class rebuilds

The rebuilding programme that followed the derailment of K class No. A800 "River Cray" at Sevenoaks began at Ashford works in June 1928. The work involved in converting a 2-6-4 tank engine to a 2-6-0 tender locomotive included the removal of the side water tanks, rear coal bunker and trailing axles, although the 6 ft (1.83 m) driving wheels, right-hand drive and N class–type boiler were retained.[10] The aesthetic aspects inherited from the K class were the former Midland Railway engineer James Clayton’s contributions to the design, creating a simple, functional locomotive similar to the N class.[7]

The rebuilt locomotives were given a tender and a re-designed cab that bore a strong resemblance to those featured on designs by Henry Fowler.[9] Two designs of Maunsell tender were used, the straight-sided 3,500 imperial gallons (15,911 l) variety, and the larger 4,000-imperial-gallon (18,184 l) design used on later batches of the N class with inward-sloping raves to prevent coal spillage.[7] The first rebuild was No. A805 River Camel, which also became the first U class locomotive into service in March 1928, three months before the first production locomotive under construction at Brighton.[7] The rapid turnaround was achieved as design work was already in place, and the rebuilding of existing locomotives was cheaper than building from scratch.[8]

No. A805 was put on performance trials prior to work commencing on rebuilding of the rest of the class at Brighton and Eastleigh works. The rebuilds lost their names because of the bad publicity attached to the "River" class after the 1927 crash, and the heavily damaged No. A800 was the last member of the K class to be rebuilt to U class configuration in December 1928.[8] The unique 3-cylinder "River" tank, K1 class No. A890 River Frome was also rebuilt to the general U class specification, becoming the prototype of Maunsell's 3-cylinder U1 class derivative in June 1928.[11]

First production batch and differences with rebuilt locomotives

Construction of the delayed 1926 order for 20 K class locomotives began in 1928 after alteration to the U class specification. As a result of Harold Holcroft’s position as one of Maunsell’s assistants, the new-builds also displayed the Churchward GWR 4300 Class influence.[12] The ideas applied to this class were already used on the N, N1 and K class rebuilds, including long-travel valves for fast running, Belpaire firebox and conical boilers, constructed at the North British Locomotive Works in Glasgow.[12] The first of the production batch emerged from Brighton works in August 1928 and featured a tapered chimney and smokebox snifting valves, both of which were used on the K and N class locomotives.[1]

The 20 locomotives of the first production batch were split equally between Brighton and Ashford works, and all were completed by December 1929.[1] The production locomotives had a slightly different profile to the K class rebuilds and featured left-hand drive to improve the visibility of signals from the driver's side of the footplate. They also had higher running plates along the sides of the boiler than the rebuilds, which required smaller wheel splashers to cover the tops of the driving wheels.[8] Another variation was the flatter top to the dome covers, as the rebuilds retained the high N class type used on the K class.[8]

In common with the N, N1 and K class locomotives, the Midland Railway influence of Clayton showed in the placement of locomotive fittings on the production batch, as the water top-feed into the boiler was located inside a dome, whilst the cab area was a modified version of those on the 0-6-0s of Henry Fowler and the K class rebuilds.[9] The rebuilds had Midland Railway-style double spectacle plates (the small windows on the front face of the cab) left over from the K class cabs, whereas the production versions had one each side of the boiler.[1] Such modifications were becoming typical of the Southern Railway’s attempt to produce a fleet of standardised locomotives.[7] However, all members of the U class were to vary from GWR practice, as the superheating surface area was increased, and all were equipped with outside Walschaerts valve gear.[9]

Second production batch and modifications

The second batch of ten new-build U class locomotives was constructed between February and May 1931 when more obsolete locomotives were withdrawn from service. This brought the total of new-build locomotives to 30, and the total number of operational U class engines to 50.[10] The new batch also featured detail differences from the rest of the class, such as the arrangement of the footsteps at the front of the locomotive, though continued to use the standard left-hand drive cab layout to improve the driver’s forward vision from the cab. Smoke deflectors were fitted to the whole class from 1933 to prevent drifting smoke from obscuring forward vision.[7] The smokebox snifting valves applied to the class by Maunsell were removed by his successor Oliver Bulleid, who also fitted U1 class chimneys to improve the draughting.[10]

Operational details

K class rebuild number 31803 at Bournemouth during the British Railways era. Note the double spectacle plates on the left-hand cab front next to the boiler

The U class was a reliable and economical design more than capable of attaining speeds in excess of 70 mph (110 km/h) as a result of being fitted with long-travel valves.[13] They had high capacity, tapered boilers which promoted free steaming, and 6 ft (1.83 m) driving wheels which allowed fast running over long distances.[13] They were distributed more widely than their N class counterparts, although one drawback in operating the class was the size of the cylinders and cab, which meant the U class was out of gauge for the Tonbridge-Hastings line due to inadequate clearances in tunnels along the route.[12] Otherwise, their "go anywhere" nature earned them the nickname of "U-Boats", and crews praised their abilities to achieve what they were designed to do.[1]

The Southern Railway operating department undertook trials to improve fleet efficiency. When built, Eastbourne-based No. A629 was fitted with an experimental pulverised fuel burner of German design; the experiment was terminated when a minor explosion was caused by the powdered coal coming into contact with sparks thrown from the blastpipe. The experiment also proved that pulverised coal was a false economy, as much of the fine dust was sucked through the chimney without combustion taking place. The locomotive was returned to normal coal burning in 1935.[1] In 1947 the class became a test-bed for a government-backed scheme regarding fuelling arrangements in anticipation of a coal shortage.[10] Two of the class, Nos. 1625 and 1797, were converted to oil burning, with more set to follow suit; but the project was abandoned and the two oil burners were reverted to coal-firing before this could take place.[1]

All members of the class entered British Railways service in 1948, and from 1955 23 of the U class received chimneys of the British Railways Standard Class 4 variety and replacement cylinders, which had become worn through intensive use.[13] A few members of the class were given replacement frames at overhaul with a shallower curve between the front buffer beam and smokebox. During the early 1960s, the withdrawal of the ageing T9 class designed by Dugald Drummond saw the U class replacing them on services west of Exeter, though their large wheels offered little advantage on the steeper gradients that characterised this part of the railway network.[1] The favoured form of 2-6-0 motive power west of Exeter was the smaller-wheeled N class, while heavier passenger work was allocated to Bulleid’s Unrebuilt Light Pacifics, which were within the weight restrictions imposed in this area.[1] The U class represented one of the less glamorous classes of passenger locomotive due to the fact that they were used mainly on mixed-traffic and secondary passenger duties.

Withdrawal

The class were withdrawn between 1962 and 1966

Table of withdrawals
Year Quantity in
service at
start of year
Quantity
withdrawn
Locomotive numbers
1962 50 2 31610/30.
1963 48 14 31611/12/14/15/23/31/33–37, 31794/95, 31805.
1964 34 24 31613/16–18/21/22/24–26/28/29/32/38, 31792/93/96–98, 31801/02/04/06–08.
1965 10 6 31619/20/27, 31790/99, 31800.
1966 4 4 31639, 31791, 31803/09.

Accidents and incidents

Preservation

Unusually, all four surviving U Classes have steamed at some point in preservation and of the 4 survivors, 31625 has worked on the mainline.

Details of preserved engines
Number Image Year built Home Status
SR BR
1618 31618 1928 Bluebell Railway, owned by the Maunsell Locomotive Society. On display awaiting overhaul, which is to commence when SR V Class 928 'Stowe' returns to traffic.
1625 31625 1929 Swanage Railway, owned by John Bunch. Stored off site, overhaul due to commence in 2016.
1638 31638 1931 Bluebell Railway, owned by the Bluebell Railway on long-term loan to the Maunsell Locomotive Society. Stored for static display awaiting overhaul.
1806 31806 1928 Swanage Railway, owned by John Bunch. Operational, returned to service in 2010. The only survivor of the K class rebuilds.[5]

Livery and numbering

Southern Railway

From 1928, the entire class was painted in Maunsell’s lined Southern Railway Olive green with yellow markings and "Southern" on the tender.[1] During the Second World War, the U class was painted in wartime black livery with Oliver Bulleid's Sunshine yellow lettering, and some were later painted in lined Malachite green livery. The class was initially numbered in the Southern Railway's post-grouping system from A790A809 for the K class rebuilds, and A610A639 with the production batches. The "A" in the numbering system denotes Ashford, where the locomotive design had originated. Southern numbering policy was eventually rationalised, and final batch of 15 locomotives, built between 1932 and 1934, were numbered 14001414 without the "A" prefix.[16] The other U class locomotives were subsequently renumbered to 17901809, and 16101639 at the same time.[5]

British Railways

The entire class was absorbed by British Railways in 1948, and was given the Power classification 4P3F, denoting a mixed traffic locomotive.[13] Livery was initially similar to the Southern Railway, though with "British Railways" on the tender, and an "S" prefix to the Southern number. This was succeeded by the British Railways mixed-traffic lined black livery with red, cream and grey lining and the British Railways crest on the tender.[13] The British Railways standard numbering system was used to replace the Southern Railway system, and the class was allocated the series 3179031809 for the K class rebuilds, and 3161031639 for the rest.[17]

References

Notes

  1. 1 2 3 4 5 6 7 8 9 10 Herring, Section "U Class", pp. 120121
  2. 1 2 Casserley, H.C.: 'End of the Maunsell moguls—the Southern maids-of-all-work' (Railway World: 1966, 27), pps. 436440)
  3. 1 2 Scott-Morgan, p. 46
  4. Casserley, p. 440
  5. 1 2 3 Langston, p. 112
  6. 1 2 3 Southgate, (Steam World, 2008 (251)), p. 21
  7. 1 2 3 4 5 6 7 Clarke, (Steam World, 2008 (249)), p. 54
  8. 1 2 3 4 5 Clarke, (Steam World, 2008 (249)), p. 55
  9. 1 2 3 4 Clarke (Steam World, 2008 (248)), p. 38
  10. 1 2 3 4 Reynolds, W.J.: 'The Maunsell moguls' (The Southern Railway Magazine: 1943, 89), pps. 155158, 199202 and 279282
  11. Scott-Morgan, p. 50
  12. 1 2 3 Clarke (Steam World, 2008 (248)), p. 40
  13. 1 2 3 4 5 Longworth: Section "U class"
  14. Hoole (1982)
  15. 1 2 Bishop (1984)
  16. Haresnape, "U class"
  17. Ian Allan ABC 195859

Bibliography

  • Bishop, Bill (1984). Off the Rails. Southampton: Kingfisher. pp. 35–36, 80–81. ISBN 0 946184 06 2. 
  • Casserley, H.C.: 'End of the Maunsell moguls—the Southern maids-of-all-work' (Railway World: 1966, 27), pps. 436–440)
  • Clarke, Jeremy: 'The locomotives of R.E.L. Maunsell, Part 3: The 'Mogul' family SECR' (Steam World, 2008 (248)), pp. 3841
  • Clarke, Jeremy: 'The locomotives of R.E.L. Maunsell, Part 4: The 'Mogul' family SR' (Steam World, 2008 (249)), pp. 5457
  • Haresnape, Brian: Maunsell Locomotives a pictorial history (Ian Allan Ltd, 1977), ISBN 0-7110-0743-8
  • Herring, Peter: Classic British Steam Locomotives (Abbeydale Press: London, 2000) Section "U Class" ISBN 1-86147-057-6
  • Hoole, Ken (1982). Trains in Trouble: Vol. 3. Redruth: Atlantic Books. p. 30. ISBN 0-906899-05-2. 
  • Ian Allan ABC of British Railways Locomotives, winter 1958–59 edition
  • Langston, Keith: British Steam Preserved: Illustrated Comprehensive Listing of Ex-British Railways Steam Locomotives (Horncastle: Morton's Media Group Ltd., 2008)
  • Longworth, Hugh: British Railway Steam Locomotives: 1948–1968 (Oxford Publishing Company: Oxford, 2005) ISBN 0-86093-593-0
  • Reynolds, W.J.: The Maunsell moguls (S.R. Railway Magazine, 1943, 89), pps. 1558; 199202; 27982
  • Scott-Morgan, John: Maunsell Locomotives (Ian Allan Publishing: Hinckley, 2002), ISBN 0-7110-2872-9
  • Southgate, Bill: 'Platform: Order amended seven months after Sevenoaks' (Steam World, 2008 (251)), p. 21

Further reading

External links

Wikimedia Commons has media related to SR U class.

This article is issued from Wikipedia - version of the Sunday, March 06, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.