Line 11, Shanghai Metro

Line 11, Shanghai Metro
Line 11
十一号线
Overview
Type Rapid transit
Status Chenxiang Road and Yanyu Road still under construction, other stations operate normally.
Locale Shanghai, China
Kunshan, Jiangsu, China
Termini Jiading North/Huaqiao
Disney Resort
Stations 38
Daily ridership 800,000 (2015 peak)[1]
Operation
Opened December 31, 2009
Operator(s) Shanghai No.2 Metro Operation Co., Ltd.
Character

Underground (from Yuqiao to Taopu Xincun and Shanghai Ciruit Station)

Elevated (from Disney Resort to Luoshan Road and Nanxiang to North Jiading and East Changji Road to Huaqiao)
Technical
Line length 80.6 km (50.08 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification Overhead lines (1500 volts DC)
Operating speed 80 km/h (50 mph)
Route map
Line 11

Line 11 is a northwest-southeast line of the Shanghai Metro network. It has two services: Service A (the Main Line) runs between North Jiading and Disney Resort, while Service B (the Branch Line) runs between Huaqiao and Sanlin. The two services share the same route and stations between Jiading New City and Sanlin and stop at these stations at alternate 5-minute intervals. The line is colored brown on system maps.

Service routes

Stations

Service
routes
Station Name
English
Station Name
Hanzi
Transfer
Location
Disney Resort 迪士尼 Pudong
Kangxin Highway 康新公路
Xiuyan Road 秀沿路
Luoshan Road 罗山路  16 
Yuqiao 御桥
Yanyu Road (not open) 严御路
Pusan Road 浦三路
East Sanlin 三林东
Sanlin 三林
Oriental Sports Center 东方体育中心  6  8 
Longyao Road 龙耀路 Xuhui
Yunjin Road 云锦路
Longhua 龙华  12 
Shanghai Swimming Center 上海游泳馆
Xujiahui 徐家汇  1  9 
Jiaotong University 交通大学  10  Changning
Jiangsu Road 江苏路  2 
Longde Road 隆德路  13  Putuo
Caoyang Road 曹杨路  3  4 
Fengqiao Road 枫桥路
Zhenru 真如
Shanghai West Railway Station 上海西站 China RailwayShanghaixi
Liziyuan 李子园
Qilianshan Road 祁连山路
Wuwei Road 武威路
Taopu Xincun 桃浦新村
Nanxiang 南翔 Jiading
Chenxiang Road (under construction) 陈翔路
Malu 马陆
Jiading Xincheng 嘉定新城
Baiyin Road 白银路
West Jiading 嘉定西
North Jiading 嘉定北
Shanghai Circuit 上海赛车场 Jiading
East Changji Road 昌吉东路
Shanghai Automobile City 上海汽车城
Anting 安亭
Zhaofeng Road 兆丰路 Kunshan, Jiangsu
Guangming Road 光明路
Huaqiao 花桥

Rolling Stock

Type Time of manufacturing Series Sets Assembly Notes
Type A 2008–2013 AC16 72 Tc+Mp+M+M+Mp+Tc Manufactured by CSR Zhuzhou

Overview

The 1st phase of Line 11, which runs from Jiading North to Jiangsu Road, opened on 31 December 2009.[2][3] A branch line from Anting opened on 29 March 2010.[4]

The 2nd phase runs from Jiangsu Road to Luoshan Road. It opened on 31 August 2013.[5]

The 3rd phase connects Luoshan Road and the Shanghai Disney Resort. This section is 9.4 kilometres (5.8 mi) long with 3 stations. All new stations except for the Disney Resort station opened on December 19, 2015.[6] The Disney Resort started to trial operation on April 26, 2016.[7]

References

This article is issued from Wikipedia - version of the Tuesday, April 26, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.