Line 6, Shanghai Metro
Line 6, Shanghai Metro |
Legend |
|
Line 6 is an eastern north-south line of the Shanghai Metro network. The entire line is located in the Pudong New Area. A complete trip between the two end terminals, Gangcheng Road and Oriental Sports Center takes approximately 1 hour and 10 minutes. The line is colored magenta on system maps.
Service routes
Stations
Overview
Line 6 opened on December 29, 2007. The trains, with 4 carriages each, are manufactured by Shanghai Electric and Alstom. Like the Lexington Avenue Subway in New York City, passenger traffic has consistently exceeded the designed capacity of the line since its opening and causes severe strain to the services. The line was built to accommodate light metro narrow-bodied "C size" trains, which is not interchangeable with wide-body "A size" trains on other Shanghai Metro lines. This has made it less practical to upgrade the facilities to meet demands.
Line 6 was forecasted to carry 105,000 people/day. However within the first few days of operation the line has exceeded 150,000 people/day.[2] Realizing the sheer miscalculation during construction, the municipal government have pledged to add new trains and shorten wait times starting in June 2008. However, Line 6 still suffers severe crowding and delays especially during rush hours.[3] The busiest section of the line is running at 133% capacity.[4] With the opening of Line 12 the Shanghai Metro advises passengers divert to the new line to relieve crowding.[5]
Interchanges
Rolling Stock
Type | Time of manufacturing | Series | Sets | Assembly | Notes |
Type C | 2007–2008 | AC12 | 21 | Tc+Mp+Mp+Tc | Manufactured by Alstom |
Type C | 2009–2010 | AC14 | 29 | Tc+Mp+Mp+Tc | Manufactured by Alstom and CSR Changchun |
References
- ↑ "上海地铁官方微博". 上海地铁. 2015-05-01. Retrieved 2015-05-06.
- ↑ "客流预测报告做出前内定小型车". Sina. Retrieved 2013-01-27.
- ↑ "轨交拥挤排行榜:"6号线德平路到世纪大道站"最挤". Retrieved 2012-11-22.
- ↑ "地铁限流知识". 文明地铁(安全地铁)宣传. 上海地铁运管中心. 2012-03-30. Retrieved 2013-03-09.
- ↑ "12号线、16号线12月29日起载客试运营". 上海地铁运管中心. 2013-12-27. Retrieved 2013-12-28.
|
---|
| Current lines | |
---|
| Under construction | |
---|
| Under planning |
- 19
- 20
- 21
- 23
- Airport
- Jiamin
- Chongming
|
---|
| Cancelled lines | |
---|
|