Ohio State Route 7

State Route 7 marker

State Route 7

Major highways in Ohio with OH 7 in red.
Route information
Maintained by ODOT
Length: 292.20 mi[1] (470.25 km)
Existed: 1912[2] – present
Major junctions
South end: US 52 near Chesapeake
 

US 35 in Gallipolis
US 33 / SR 833 near Pomeroy
I77 in Marietta
I470 near Bellaire
I70 / US 40 / US 250 in Bridgeport
US 22 in Steubenville
US 30 / SR 11 from E. Liverpool to Rogers
I76 / Ohio Turnpike near Youngstown
I80 near Hubbard

I90 in Conneaut
North end: SR 531 in Conneaut
Location
Counties: Lawrence, Gallia, Meigs, Athens, Washington, Monroe, Belmont, Jefferson, Columbiana, Mahoning, Trumbull, Ashtabula
Highway system
SR 6SR 8

State Route 7 (SR 7) , formerly known as Inter-county Highway 7 until 1921[3] and State Highway 7 in 1922,[4]is a north–south state highway in the southern and eastern portions of the U.S. state of Ohio. At just over 292 miles (470 km) in length, it is the longest state route in Ohio.[1] Its southern terminus is an interchange with U.S. Route 52 (US 52) just west of Chesapeake. Its northern terminus also serves as the eastern terminus of SR 531 in Conneaut. The path of SR 7 stays within five miles (8.0 km) of the Ohio River (Ohio's border with West Virginia) for the southern portion, with the river being visible from much of the route. The road also remains within 10 miles (16 km) of the Pennsylvania state line for the northern portion.

History

In 1912, Intercounty Highway 7 ran from Elizabethtown to East Liverpool along the Ohio River[5]

In 1923, the route was at its greatest extent, the northern terminus of the route was extended from East Liverpool to Conneaut.[6]

In 1927, the southern segment running from Chesapeake to the Indiana state line near Elizabethtown was deleted to make way for US 52 and a small segment of US 50[7]

Chesapeake and Proctorville bypass

Historical map of the Chesapeake Bypass

The Chesapeake bypass was first proposed in 1953.[8]

In 1961, the US 52 expressway opened from Chesapeake westward towards Sheridan. The original eastern terminus of the four-lane divided highway was at the current Chesapeake northbound-only exit ramp east of Tallow Ridge Road.[9] US 52 originally crossed at the present-day Robert C. Byrd Bridge that connects Chesapeake to Huntington, West Virginia. In 1979, the US 52 designation moved to the Nick Joe Rahall II Bridge as tolls on that span were removed that year; the segment east of the Rahall Bridge to the Chesapeake interchange was renumbered to SR 7.

Ten years later, the four-lane expressway was extended eastward to an incomplete trumpet interchange just east of Big Branch Road.[10] A four-lane connector route from the partially complete interchange to the foot of the Robert C. Byrd Bridge at SR  527 was completed. At the same time, the two-lane Chesapeake interchange ramp just east of Tallow Ridge Road was converted to a northbound-only exit ramp. The abrupt terminus at Chesapeake was envisioned to connect to Proctorville.

State Route 7 runs through downtown Gallipolis.

On May 31, 2002,[11] ground was broken for Phase 1-A of the Proctorville bypass.[12] Phase 1-A entailed a two-lane connector road from the East Huntington Bridge to Irene Road, with the original loop ramp from the bridge to State Route 7 being modified into an access road. Phase 1-B was designated from Irene Road to State Route 7 near Fairland East Elementary in Rome. Phase 2 was envisioned from Irene Road west to Chesapeake. The total cost was originally estimated to be at $165 million.[11]

On April 27, 2003, Phase 1-A of the Proctorville bypass opened to traffic.[13] The $6.5 million,[11] one-mile (1.6 km) section of three-lane roadway was opened from the foot of the East Huntington Bridge to Irene Road and signed as SR 607.

On June 3, 2003, bids were opened for Phase 1-B from Irene Road to SR 7 near Fairland East Elementary.[14] The projected cost of the 4.5-mile (7.2 km) segment was originally $27 million, however, when the bids were let, the cost had decreased to $24.3 million. The lowest bid, which was also accepted, came in at $22.1 million.[15] The road was designed as a two-lane limited-access facility on a four-lane right-of-way. Construction began on August 4,[16] with an original estimated completion date of June 30, 2005.

State Route 7 south of Dilles Bottom, Ohio

An unusual amount of rain, blamed on two hurricanes, caused major delays.[17] More than one-dozen major slips along Phase 1-B required an additional $30 million in repairs and the purchase of additional land for highwall excavations. Another change was the design of the roadway; originally projected to be widened in the future when higher traffic counts warrant the expansion, it was designed on wide right-of-way with no grade separation between the opposing lanes. During the repair of the slips, a terraced roadway was constructed to separate the future southbound lanes from the northbound by a highwall when the roadway is expanded to four lanes.

Other cost overruns had pushed the cost of construction to $62 million total, which included Phases 1-A and 1-B, up from the original estimates of $32 million. The primary cause was rapidly increasing land values and "unchecked zoning" along the project's projected right-of-way along with geo-technical problems with rocky soil.[14] Property values along the projected route, for instance, increased 91.5% from 1992 to 2001 alone.

In October 2006, a small 12-mile (0.80 km) segment of the Phase 1-B bypass opened to traffic between SR 607 and Irene Road intersection to SR 775.[18] The remainder, east to SR 7 near Fairland East Elementary, opened on December 8, 2006. It includes intersections with SR 775, Kinley Avenue, and SR 7. Upon completion, phases 1-A and 1-B were signed as SR 7; the bypass from the SR 775 junction to the loop at the East Huntington Bridge was co-numbered with SR 775.

The highway somewhere between Marietta and Pomeroy

Phase 2 of the bypass, from the Chesapeake bypass to Irene Road at Proctorville, has not been funded. Funding which had been previously promised by the Ohio Department of Transportation (ODOT) was later denied.[8] Phase 2 is estimated to cost $76 million to complete.[14] Also due to the construction delays (slips) on the bypass from SR 775 to Fairland East Elementary School (Phase 1-B), the design of Phase 2 may be realigned to prevent slips during construction.

Pomeroy Bypass

The Pomeroy bypass from Middleport east to US 33 was completed in 1968. At the time of completion, the bypass was two lanes but was upgraded to four lanes, divided, in 1976 from SR 143 to US 33 near Rock Springs. The bypass was extended east in 2000 from Rock Springs to a partial diamond interchange with SR 7 as a four-lane divided expressway. It was initially signed just SR 7. The diamond interchange was later completed with all connections, and the highway was extended eastward to Ravenswood, West Virginia as US 33.

Major intersections

CountyLocationmikmExitDestinationsNotes
LawrenceUnion Township0.000.00 US 52 Ohio River Scenic BywayFull-access interchange; southern end of ORSB concurrency
ChesapeakeNorthbound exit
2.283.67 SR 527 Chesapeake Bypass; Proctorville HuntingtonSR 7 exits freeway; western end of SR 527 concurrency; northbound exit; southbound entrance
2.834.55 SR 527Eastern end of SR 527 concurrency
5.098.19 SR 243Western end of SR 243
6.089.78 SR 775 southWestern end of SR 775 concurrency
Proctorville6.7510.86 SR 775 northEastern end of SR 775 concurrency
Rome Township7.5512.15 SR 243Western end of SR 243 concurrency
9.9616.03 SR 243 westEastern terminus of SR 243
15.9725.70 SR 217Eastern terminus of SR 217
GalliaCrown City20.1532.43 SR 553 northSouthern terminus of SR 553
Gallipolis Township38.6862.25 SR 218 southNorthern terminus of SR 218
Gallipolis41.0566.06 SR 141 westEastern terminus of SR 141
41.7867.24 SR 588 westEastern terminus of SR 588
42.3668.17 SR 160 northSouthern terminus of SR 160
Gallipolis Township45.4173.08 US 35 east CharlestonAccess to eastbound and from westbound US 35 only
Addison Township46.0874.16 SR 735 west to US 35 DaytonEastern terminus of SR 735; provides access to westbound and from eastbound US 35
Cheshire53.5086.10 SR 554 westEastern terminus of SR 554
MeigsMiddleport57.4492.44Ohio River Scenic Byway; Hobson DriveNorthern end of ORSB concurrency;[19] Former routing of SR 7
Salisbury Township59.7996.22 SR 124 westWestern end of SR 124 concurrency
60.8297.88 SR 143 northSouthern terminus of SR 143
63.62102.39 US 33
SR 124
SR 833 west
Eastern end of US 33 and SR 124 concurrencies; Eastern terminus of SR 833
66.14106.44 US 33Interchange; US 33 leaves to the east.
SR 733 southAccessible via northbound SR 7
Chester Township69.87112.44 SR 248SR 248 begins to the east (western terminus).
Orange Township77.98125.50 SR 681SR 681 crosses west–east.
AthensTroy Township81.53131.21 US 50 / SR 32US 50/SR 32 join from the west.
Coolville82.99133.56 SR 144SR 144 crosses northwest-southeast.
Troy Township85.99138.39 SR 124 west Ohio River Scenic BywayEastern terminus of SR 124; southern end of ORSB concurrency[20]
WashingtonBelpre Township89.86144.62 SR 555SR 555 begins to the west (southern terminus).
91.23146.82 SR 618Western terminus of SR 618; northbound exit; southbound entrance
92.08148.19 US 50
SR 339
US 50 leaves easterly into West Virginia across the Blennerhassett Island Bridge.
SR 339 crosses south–north; two separate interchanges on southbound side
Belpre96.70155.62 SR 32 to SR 618SR 7 exits SR 32; eastbound exit; westbound entrance
97.14156.33 SR 618 to SR 32Eastern terminus of SR 618; southbound exit; northbound entrance
Warren Township107.62173.20 To SR 550 Virginia StreetInterchange; SR 550 ends to the west (eastern terminus); northbound exit; southbound entrance
107.62173.20 SR 550Eastern terminus of SR 550
Marietta108.64174.84 SR 676SR 676 ends to the northwest (eastern terminus).
109.08175.55 SR 60SR 60 joins from the northwest.
109.94176.93 SR 26SR 26 begins concurrent (southern terminus).
110.12177.22 SR 60SR 60 leaves to the south.
110.28177.48 SR 26SR 26 leaves to the northeast.
Marietta Township111.34179.18 I77I-77 passes over SR 7 south–north; full-access interchange (I-77 exit 1).
Newport Township126.02202.81 SR 807SR 807 passes over SR 7 southeast-northwest to a 180° ramp; SR 807 begins 0.10 mi (0.16 km). later to the northwest (northern terminus).
New Matamoras139.03223.75 SR 260SR 260 begins to the northwest (southern terminus).
MonroeJackson Township143.44230.84 SR 800SR 800 begins to the west (southern terminus).
Lee Township149.98241.37 SR 255SR 255 ends to the north (eastern terminus).
Ohio Township154.31248.34 SR 536SR 536 joins from the east.
154.71248.98 SR 536SR 536 leaves to the west.
Clarington163.00262.32 SR 78SR 78 ends to the west (eastern terminus).
163.54263.19 SR 556SR 556 ends to the west (eastern terminus).
BelmontPowhatan Point170.87274.99 SR 148SR 148 crosses northwest–east.
171.86276.58 SR 148SR 148 ends to the south (eastern terminus).
Mead TownshipSouthern End of Ohio River Scenic Byway (Southern freeway section)
178.03286.51 SR 872SR 872 begins to the southeast (western terminus)
181.41291.95Central AvenueFormer routing of SR 7; northbound exit, southbound entrance
Pultney Township183.48295.28Central AvenueFormer routing of SR 7; southbound exit, northbound entrance
BellairePinch Run / Belmont Street
185.42298.4027th Street to SR 149/SR 147
48th Street / North Guernsey Street
Pultney Township188.19302.86 I-470 Washington, PA / ColumbusInverted SPUI, leading to a trumpet interchange at I-470 (exit 6)
Bridgeport189.64305.20 SR 767 to I70 / US 40 / US 250 Bridgeport / WheelingExit 225 on I-70; northbound exit, southbound entrance (to SR 7A)
189.83305.50 US 40 / US 250 to I70 Wheeling / BridgeportExit 225 on I-70; southbound exit, northbound entrance (to SR 7A and SR 767)
Northern End of Ohio River Scenic Byway (Southern freeway section)
Martins Ferry191.77308.62 SR 647Junction with SR 647 (southern terminus).
Southern End of Ohio River Scenic Byway (Central freeway section)
Pattons Run / Picoma Road
YorkvillePublic Road / Yorkville
JeffersonTiltonsvilleFarm Lane / Tiltonsville
Rayland198.71319.79 Rayland / Dillonvale to SR 150
Wells Township203.26327.12Salt Run Road / Riddles Run RoadFormer routing of SR 7; northbound exit
204.50329.11Brilliant / Riddles Run RoadFormer routing of SR 7
BrilliantBrilliantSouthbound exit and entrance; northbound entrance
Steubenville Township208.18335.03 SR 151 New Alexandria / SmithfieldEastern terminus of SR 151
Commercial Avenue
Murdock Avenue
Logan Avenue
SteubenvilleLincoln AvenueNorthbound exit; southbound entrance
Northern End of Ohio River Scenic Byway (Central freeway section)
212.88342.60 SR 43SR 43 begins to the west (southern terminus).
214.24344.79 SR 822 east Weirton, West VirginiaClosed; former routing of SR 822 across the now-demolished Fort Steuben Bridge; was inverted SPUI.[21][22][23]
213.98344.37 US 22
SR 822
Partial Interchange; US 22 leaves to the east; SR 822 joins from the west here and leaves to the east 0.23 mi (0.37 km). later; southbound exit; northbound SR 7 to US 22 east via University Blvd.
Island Creek Township215.23346.38 US 22
SR 213
Full-access interchange; US 22 joins from the west; SR 213 begins to the northwest (southern terminus).
Southern End of Ohio River Scenic Byway (Northern freeway section)
216.12347.81County Road 44 / Pottery Addition (Kingsdale Road)Northbound exit; southbound entrance; former routing of SR 7
217.17349.50County Road 44 / Pottery Addition (Kingsdale Road)Southbound exit; northbound entrance; former routing of SR 7
County Road 56 / Costonia
TorontoFranklin Street
4th Street
Empire224.96362.04 SR 152 Empire / Richmond
Northern End of Ohio River Scenic Byway (Northern freeway section)
Saline Township230.02370.18 SR 213SR 213 ends to the southwest (northern terminus).
ColumbianaWellsville232.15373.61 SR 39SR 39 joins from the northwest via full-access interchange.
233.64376.01 SR 45SR 45 begins to the northwest (southern terminus) via full-access interchange.
East Liverpool236.86381.19 US 30 / SR 11 / SR 39
SR 267 Ohio River Scenic Byway
US 30/SR 11/SR 39 join from/leave to the south; SR 267 begins to the northwest (southern terminus); full-access interchange except from eastbound US 30/southbound SR 7/southbound SR 11 to SR 267; northern terminus of ORSB concurrency
St. Clair Township240.19386.55 SR 170SR 170 begins to the northeast (southern terminus).
Madison Township242.68390.56 US 30 / SR 11
SR 267
US 30/SR 11 join from/leave to the northwest; SR 267 ends to the south (northern terminus); full-access interchange.
Rogers250.90403.78 SR 154SR 154 crosses west–east.
Fairfield Township253.13407.37 SR 517 / SR 558SR 517 ends to the west (eastern terminus) concurrent with SR 558 which crosses west–east.
256.18412.28 SR 46SR 46 joins from the southeast.
Columbiana257.70414.73 SR 14 / SR 46SR 46 leaves to the west, concurrent with SR 14 which crosses west–east.
MahoningBeaver Township261.89421.47 SR 165SR 165 crosses west–east.
262.19421.95 SR 164SR 164 crosses southwest-northeast.
263.45423.98 I76 / Ohio TurnpikeAccess via ramps here; turnpike passes over SR 7 northwest-southeast 0.30 miles (0.48 km) later; I-76 exit 232.
264.94426.38 SR 626SR 626 ends to the southeast (northern terminus).
Boardman Township267.46430.44 US 224US 224 crosses west–east.
Youngstown270.00434.52 SR 170SR 170 crosses west–east.
270.86435.91 US 62US 62 joins from the west.
271.83437.47Market StreetFormer routing of SR 7
Southern End of Freeway
272.16438.00 I-680I-680 passes under US 62/SR 7 northwest-south; access from southbound US 62/SR 7 to I-680 and from I-680 to northbound US 62/SR 7 only (I-680 exit 6).
273.42440.03 SR 289 to US 422 east Wilson Ave / Himrod RoadSR 289 passes over US 62/SR 7 west–east; northbound exit/southbound entrance only.
US 422 west Warren
Northern End of Freeway
To US 422 east / Albert Street
TrumbullHubbard279.94450.52 SR 304SR 304 joins from the west.
280.78451.87 SR 304
SR 616
SR 304 continues to the east; SR 616 ends to the south (northern terminus).
Hubbard Township282.06453.93Elmwood RoadFormer routing of US 62
282.16454.09 I-80I-80 passes over US 62/SR 7 west–east (I-80 exit 234).
282.92455.32 US 62US 62 leaves to the northeast; northbound split of concurrency; no access from southbound to northbound on either route.
283.35456.01 To US 62Connector provides access from southbound on either route to northbound on the other route.
Brookfield Township285.81459.97 SR 82SR 82 crosses west–east.
Brookfield Center286.19460.58Warren–Sharon RoadFormer routing of SR 82
Hartford Township291.49469.11 SR 305SR 305 crosses west–east.
Vernon Township296.75477.57 SR 88SR 88 crosses west–east.
Kinsman Township300.74483.99 SR 5SR 5 joins from the west.
301.93485.91 SR 87SR 87 ends to the west (eastern terminus).
302.28486.47 SR 5SR 5 leaves to the east.
AshtabulaWilliamsfield Township307.42494.74 US 322US 322 crosses west–east.
Andover312.55503.00 US 6
SR 85
US 6 joins from the west; SR 85 begins to the east (western terminus).
Richmond Township320.00514.99 US 6US 6 leaves to the east.
Pierpont Township322.56519.11 SR 167SR 167 joins from the west.
323.47520.57 SR 167SR 167 leaves to the east.
Monroe Township330.24531.47 SR 84SR 84 crosses west–east.
Conneaut333.95537.44 I-90I-90 passes under SR 7 west–east; full-access interchange (I-90 exit 241).
335.93540.63 US 20US 20 joins from the west.
336.15540.98 US 20US 20 leaves to the east.
337.37542.94 SR 531SR 531 ends to the west (eastern terminus).
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Auxiliary routes

State Route 7 Alternate in Bridgeport


State Route 7 Alternate
Location: Bridgeport
Length: 0.72 mi[24] (1.16 km)
Route of SR 7A in Bridgeport highlighted in red

State Route 7 Alternate (SR 7A) is a short 0.72-mile-long (1.16 km)[24] connecting loop signed as SR 7[25][26] that serves as a link from SR 7, US 40, and US 250 to I-70 in Bridgeport. Its western (southern) terminus is at SR 767, and its eastern (northern) terminus is along US 40 at its intersection with US 250 and the northern terminus of SR 767. SR 7A begins at the intersections of Howard Street and SR 767 (South Lincoln Avenue). SR 7A continues west as Howard Street until it intersects Marion Street. It then runs north as Marion Street, intersects I-70, and then intersects US 40, Main Street. SR 7A continues east on US 40 until it ends at US 250 and SR 767, just 370 feet (110 m) west of the West Virginia state line.

The entire route is in Bridgeport, Belmont County.

mi[24]kmDestinationsNotes
0.000.00 SR 767 (South Lincoln Avenue) to SR 7 southInterchange with SR 7
0.37–
0.42
0.60–
0.68
I70 Wheeling, WV, ColumbusExit 225 (I-70)
0.460.74 US 40 west (Main Street)Western end of US 40 concurrency
0.721.16 US 40 east / US 250 (Main Street) to SR 7 north / SR 767 south (South Lincoln Avenue)Eastern end of US 40 concurrency; northern terminus of SR 767
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

State Route 767

Main article: Ohio State Route 767

State Route 767
Location: Bridgeport
Length: 0.30 mi[24] (0.48 km)

State Route 767 (SR 767) is a northsouth state highway in the eastern portion of the U.S. state of Ohio. Currently, it is signed as an alternate route of SR 7.[27][28][29] Its southern terminus is at an exit ramp on SR 7 in Bridgeport. The route serves as a connector from northbound SR 7 to SR 7 Alternate, US 40, and US 250. The route's northern terminus is where these U.S. routes overlap eastbound to cross the Ohio River into West Virginia. SR 7A serves as a connector for all of these routes to I-70.

Business State Route 7 from Middleport to Pomeroy


State Route 7 Business
Location: Middleport-Pomeroy

Business State Route 7 stretched from 1 34 miles (2.8 km) west of Middleport to about 4 miles (6.4 km) east of Pomeroy. The route followed the former alignment of State Route 7 that was replaced by the Pomeroy Bypass, and ran through the downtown areas of Middleport and Pomeroy. It joined with State Route 833 (the former alignment of U.S. Route 33) from one mile (1.6 km) west of Pomeroy to 1 34 miles (2.8 km) east of Pomeroy, including a brief concurrency with State Route 124, and then headed northeast to the eastern U.S. Route 33/State Route 7 interchange. The route was deleted between 2013 and 2015.[30][31]

Route 7T

State Route 7T
Location: Youngstown
Length: 0.36 mi[32] (0.58 km)

State Route 7T (SR 7T) was a 0.36-mile-long (0.58 km)[32] future route beginning at US 62 in Youngstown. The entire route was concurrent with US 62T. SR 7T and US 62T were removed on May 2, 2007.[33]

See also

List of unused highways in Ohio

References

Route map: Bing / Google

  1. 1 2 Transportation System Development (May 13, 2008). "RI82B: Centerline Miles, Lane Miles, and VMT by Route and County". Ohio Department of Transportation. Retrieved August 4, 2009.
  2. Ohio State Highway Department (1912). Highway Map of Ohio (MrSID) (Map). Columbus: Ohio State Highway Department. OCLC 13716556.
  3. Ohio Department of Highways and Public Works (September 1921). Highway Map of Ohio (Map). Columbus: Ohio Department of Highways and Public Works.
  4. Ohio Department of Highways and Public Works (April 1922). Map of Ohio State Highways (MrSID) (Map). Columbus: Ohio Department of Highways and Public Works.
  5. Ohio State Highway Department (1912). Highway Map of Ohio (MrSID) (Map). Columbus: Ohio State Highway Department. OCLC 13716556.
  6. Ohio Department of Highways and Public Works (July 1923). Map of Ohio Showing State Routes (MrSID) (Map). 1:760,320. Columbus: Ohio Department of Highways and Public Works.
  7. Ohio Department of Highways and Public Works (June 1, 1927). Map of Ohio Showing State Routes (MrSID) (Map). 1:760,320. Columbus: Ohio Department of Highways and Public Works. OCLC 5673562.
  8. 1 2 Malloy, David (2004). "Chesapeake Bypass on hold indefinitely". Herald-Dispatch (Huntington, OH).
  9. Google. "Ohio State Route 7" (Map). Google Maps. Google.
  10. Google. "Ohio State Route 7" (Map). Google Maps. Google.
  11. 1 2 3 Malloy, David (2002). "Chesapeake bypass gets aid from feds". Herald-Dispatch (Huntington, OH).
  12. Blair, Allen (2002). "Bypass construction set in Lawrence, Ohio". Daily Independent (Ashland, OH).
  13. Malloy, David (April 27, 2003). "Traffic eased in Proctorville, but congested elsewhere". Herald-Dispatch (Huntington, OH). Retrieved February 11, 2007.
  14. 1 2 3 Malloy, David (May 23, 2003). "Overruns raise concerns about bypass". Herald-Dispatch (Huntington, OH). Retrieved February 11, 2007.
  15. Malloy, David (June 5, 2003). "Bids opened for Chesapeake Bypass project". Herald-Dispatch (Huntington, OH). Retrieved February 11, 2007.
  16. Malloy, David (July 11, 2003). "Chesapeake Bypass construction to start". Herald-Dispatch (Huntington, OH). Retrieved Feb 11, 2007.
  17. Malloy, David (April 15, 2005). "Bridge work may be bid on in fall". Herald-Dispatch (Huntington, OH). Retrieved February 11, 2007.
  18. Malloy, David (October 21, 2006). "Section of new Chesapeake Bypass could open next week". Herald-Dispatch (Huntington, OH). Retrieved February 11, 2007.
  19. https://www.google.com/maps/@38.9915537,-82.0767103,3a,15y,314.78h,84.99t/data=!3m6!1e1!3m4!1siFmibafUBIkZZKEGFHadLg!2e0!7i13312!8i6656
  20. https://www.google.com/maps/@39.2371957,-81.7452856,3a,41.1y,116.54h,88.28t/data=!3m6!1e1!3m4!1sw2HzEObVADO_xL2xmi2Gnw!2e0!7i13312!8i6656
  21. Scott, Warren (February 25, 2012). "Last of bridge removed". The Herald-Star. Archived from the original on June 15, 2012. Retrieved October 27, 2013.
  22. Technical Services. "Straight Line Diagrams: Jefferson County, SR 7" (PDF) (PDF). Ohio Department of Transportation. Archived (PDF) from the original on October 27, 2013. Retrieved October 27, 2013.
  23. Ohio Department of Transportation (2010). "Jefferson County Traffic Survey Report" (PDF) (PDF). Archived (PDF) from the original on October 27, 2013. Retrieved October 27, 2013.
  24. 1 2 3 4 Staff (July 16, 2013). "Roadway Description Inventory Report - DESTAPE (Belmont County)" (PDF). ODOT. Retrieved February 13, 2014.
  25. "Southbound SR 7A". Google Maps. Retrieved 25 February 2016.
  26. "Northbound SR 7A". Google Maps. Retrieved 25 February 2016.
  27. "Northbound SR 767". Google Maps. Retrieved 2016-02-25.
  28. "Ramp to Northbound SR 7 and SR 767 Southbound". Google Maps. Retrieved 2016-02-25.
  29. "Southbound SR 767". Google Maps. Retrieved 2016-02-25.
  30. "Northern terminus of B. SR 7 in 2013". Google Maps. Retrieved 2016-02-25.
  31. "Western terminus of B. SR 7 in 2015". Google Maps. Retrieved 2016-02-25.
  32. 1 2 Staff. "Traffic Counts (Traffic Survey Reports & Maps): Mahoning County 2005" (PDF). ODOT. Retrieved February 13, 2014.
  33. "County Update Table (Mahoning County)". ODOT. 2008. Retrieved February 13, 2014. SR 0007T - Route Deleted, J.E. 5/2/2007
This article is issued from Wikipedia - version of the Thursday, April 21, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.