U.S. Route 43
![]() | |||||||
Route information | |||||||
Length: | 410 mi[1] (660 km) | ||||||
Existed: | 1934[1] – present | ||||||
Major junctions | |||||||
South end: |
![]() | ||||||
![]() | |||||||
North end: |
![]() | ||||||
Location | |||||||
States: | Alabama, Tennessee | ||||||
Highway system | |||||||
|
U.S. Route 43 (US-43, US 43) is a north–south United States Highway that runs for 410 miles (660 km) from Mobile, Alabama, to central Tennessee. The highway's southern terminus is in Mobile, at US 90. Its northern terminus is Columbia, Tennessee, at US 31.
Route description
Alabama
Between Mobile and Fayette and again from Killen to the Tennessee state line, US-43 runs concurrently with unsigned State Route 13 (SR-13). Between Fayette and Hamilton, US-43 is concurrent with unsigned SR-171. Between Hamilton and Florence, the unsigned partner for US-43 is SR-17. From its beginning in Mobile US-43 passes through the western part of Alabama. It serves as the principal route connecting Mobile and Tuscaloosa, and from Tuscaloosa to Muscle Shoals and Florence. Prior to the completion of Interstate 65 (I-65), motorists traveling from Mobile to Birmingham followed US-43 to Thomasville; from there, they followed SR-5 until its junction with US-11 near West Blocton.
Except for Mobile, Tuscaloosa, and Muscle Shoals/Florence, US-43 passes through rural areas and small towns.
History
Prior to the completion of Corridor X in western Alabama, US-43 and US-278 shared a concurrency with US-78 between Guin and Hamilton. The route used to extend up to Henderson, Kentucky. It overlapped with Interstate 24 and Interstate 65. It overlapped with the Edward T. Breathitt Pennyrile Parkway and what is now present-day Interstate 69. It was decommisioned when U.S. Route 41 Alternate came into existence.
Future
Preliminary talks have indicated that Alabama state officials support a plan to build future I-63 along US-43's route from Mobile to Muscle Shoals via Tuscaloosa. The plan is estimated to cost roughly $1.5 billion and is being spearheaded by U.S. Senator Richard Shelby, who is chairman of the Senate Transportation Subcommittee. The project is expected to help the economies of cities in the Black Belt by connecting communities western Alabama, the Tombigbee Waterway and the Port of Mobile.[2]
Major intersections
State | County | Location | mi | km | Destinations | Notes | |
---|---|---|---|---|---|---|---|
Alabama | Mobile | Prichard | 0.000 | 0.000 | ![]() ![]() | Southern terminus; south end of concurrency with SR-13; southern terminus of SR-13 | |
Saraland | 4.539 | 7.305 | ![]() | Eastern terminus of SR-158 | |||
6.574 | 10.580 | ![]() | Northern terminus of SR-213 | ||||
Creola | 10.576 | 17.020 | ![]() | I-65 exit 19; parclo interchange. | |||
Washington | Wagarville | 50.406 | 81.121 | ![]() | Eastern terminus of SR-56 | ||
Clarke | Jackson | 59.621 | 95.951 | ![]() | Southern terminus of SR-177 | ||
61.101 | 98.333 | ![]() | Approximately 0.25 miles (400 m) west of the southern terminus of SR-69 | ||||
62.341 | 100.328 | ![]() | Northern terminus of SR-177 | ||||
Grove Hill | 75.760 | 121.924 | ![]() ![]() | Diamond interchange. | |||
Fulton | 82.757 | 133.184 | ![]() | Western terminus of SR-178 | |||
Thomasville | 91.080 | 146.579 | ![]() | Eastern terminus of SR-154 | |||
93.087 | 149.809 | ![]() | Southern terminus of SR-5 | ||||
Marengo | Dixons Mills | 101.572 | 163.464 | ![]() | |||
Linden | 118.131 | 190.113 | ![]() | Southern end of SR-69 concurrency | |||
119.477 | 192.280 | ![]() | Southern end of SR-28 concurrency | ||||
119.890 | 192.944 | ![]() | Northern end of SR-28 concurrency | ||||
Providence | 122.423 | 197.021 | ![]() | Northern end of SR-69 concurrency | |||
Demopolis | 134.323 | 216.172 | ![]() ![]() | Southern end of US-80/SR-8 concurrency | |||
135.275 | 217.704 | ![]() ![]() | Northern end of US-80/SR-8 concurrency | ||||
Greene | Eutaw | 160.423 | 258.176 | ![]() | Southern end of SR-14 concurrency | ||
160.710 | 258.638 | ![]() ![]() | Southern end of US-11/SR-7 concurrency | ||||
160.946 | 259.017 | ![]() | Northern end of SR-14 concurrency | ||||
Knoxville | 173.626 | 279.424 | ![]() ![]() | Diamond interchange; exit 52 | |||
Tuscaloosa | Tuscaloosa | 194.287 | 312.675 | ![]() ![]() ![]() ![]() | Northern end of US-11/SR-7 concurrency; south end of SR-69 concurrency; I-359 exit 2 | ||
Northport | 197.139 | 317.264 | ![]() ![]() ![]() | Southern end of US-82/SR-6 concurrency; northern end of SR-69 concurrency | |||
198.093 | 318.800 | ![]() ![]() | Northern end of US-82/SR-6 concurrency | ||||
200.192 | 322.178 | ![]() | Southern terminus of SR-171 | ||||
Fayette | Bankston | 226.727 | 364.882 | ![]() ![]() | Northern end of SR-13 concurrency; southern end of SR-18 concurrency | ||
Fayette | 240.217 | 386.592 | ![]() ![]() | Northern end of SR-18 concurrency; southern end of SR-171 concurrency | |||
246.256 | 396.311 | ![]() | Southern terminus of SR-129 | ||||
247.233 | 397.883 | ![]() | Western terminus of SR-102 | ||||
Marion | Winfield | 260.526 | 419.276 | ![]() ![]() | Southern end of SR-118 concurrency; southern terminus of SR-253 | ||
Guin | 266.701 | 429.214 | ![]() | Western terminus of SR-44 | |||
267.066 | 429.801 | ![]() ![]() ![]() ![]() | Southern end of US-278 concurrency; northern end of SR-118 concurrency; northern terminus of SR-107; eastern terminus of SR-142 | ||||
Hamilton | 275.428 | 443.258 | ![]() | Diamond interchange; exit 16 | |||
280.185 | 450.914 | ![]() ![]() | Southern end of SR-17 concurrency; northern end of concurrency and northern terminus of SR-171 | ||||
280.517 | 451.448 | ![]() ![]() | Northern end of US-278 concurrency | ||||
285.822 | 459.986 | ![]() | Southern terminus of SR-187 | ||||
Hackleburg | 294.323 | 473.667 | ![]() ![]() | Northern terminus of SR-253 | |||
Franklin | Spruce Pine | 304.307 | 489.735 | ![]() | Southern end of SR-13 concurrency | ||
Russellville | 310.871 | 500.298 | ![]() | Parclo interchange. | |||
Colbert | Tuscumbia | 327.903 | 527.709 | ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() | Southern end of US-72/SR-2/SR-20/SR-157 concurrency | ||
Muscle Shoals | 331.231 | 533.065 | ![]() | Western terminus of SR-184 | |||
Lauderdale | Florence | 333.658 | 536.971 | ![]() | Northern end of SR-20 concurrency | ||
335.496 | 539.928 | ![]() ![]() | Northern end of SR-17/SR-157 concurrency | ||||
337.819 | 543.667 | ![]() | |||||
Killen | 342.215 | 550.742 | ![]() ![]() | Northern end of US-72/SR-2 concurrency | |||
347.747 | 559.645 | ![]() ![]() | Western terminus of SR-64 | ||||
Alabama–Tennessee state line | 353.077 0.000 | 568.222 0.000 | Northern terminus of SR-13 in Alabama Southern terminus of SR 6 in Tennessee | ||||
Tennessee | Lawrence | St. Joseph | ![]() | Southern end of SR 227 concurrency | |||
Loretto | ![]() | Northern end of SR 227 concurrency | |||||
Leoma | ![]() | Northern terminus of SR 98 | |||||
Lawrenceburg | ![]() ![]() | Southern end of US 64/SR 15 concurrency | |||||
![]() ![]() ![]() | Northern end of US 64/SR 15 concurrency | ||||||
Summertown | ![]() | Eastern terminus of SR 240 | |||||
Maury | ![]() | Eastern terminus of SR 20 | |||||
Mount Pleasant | ![]() | Southern terminus of SR 243 | |||||
![]() | |||||||
Columbia | ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() | Southern end of US 412 concurrency | |||||
![]() | |||||||
![]() | |||||||
![]() ![]() ![]() ![]() | Northern terminus; northern end of concurrency with US 412 and SR 6/SR 99 | ||||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
See also
References
- 1 2 Droz, Robert V. "U.S. Highways: From US 1 to (US 830)". Retrieved July 4, 2006.
- ↑ "Future Interstates and Potential Interstate Corridors". Interstate Guide.
|