Delhi Bus Rapid Transit System

Delhi BRTS
Overview
Number of lines Phase I: 7 (under construction)
Website Delhi BRTS
Operation
Began operation 1st May 2008[1]
Operator(s) Delhi Integrated Multi-Modal Transit System Limited
Technical
System length Phase I: 115.5 km (under construction)

The Delhi Bus Rapid Transit System is a bus rapid transit in Delhi. The first route opened in 2008 ahead of the 2010 Commonwealth Games which were held in the city. The project is well used but has been criticized for the difficulty of access to the bus platforms, which are in the middle of the road, for lack of enforcement and for the effect it has had on other motor traffic. A legal challenge was defeated in 2012.

The Aam Aadmi Party Government has announced the scrapping of bus rapid transit system.[2]

History

Context

Tata Non-AC Bus

The number of vehicles on Delhi’s road increased from 3.3 million in 2000–01 to 7 million in 2010–11; however, less than 10% people in Delhi use private cars, with 33% traveling by bus and 30% walking to work.

The length of roads in Delhi has increased by 17% between 1991 and 2008 with now flyovers and underpasses have been built to improve traffic flow; the Ring Road has been made completely signal-free with the construction of 15 flyovers. The Delhi Metro opened its first section in 2002 and now carries 2.06 million passengers each day (as of 2011).[3]

Pedestrians became marginalized and journey times and air pollution both increased. In 2002, Supreme Court issued an order to convert all diesel buses to compressed natural gas (CNG) to reduce air pollution; however, average total suspended particulate (TSP) level is still considerably higher than World Health Organization’s (WHO) recommendations.[4] There is little opportunity to build new roads or widen existing roads, which already make up 21% of the land area.

Planning and construction

The Delhi BRT system was inspired by a similar systems in Curitiba, Brazil which had been introduced a system in 1975,[5] with similar systems being introduced in Bogotá, Colombia (TransMilenio), Guayaquil, Ecuador (Metrovia) and the Eugene, Oregon (Emerald Express (EmX)).[6]

GNCTD appointed RITES and the Indian Institute of Technology Delhi (IIT Delhi) to design and implement a system for the city in 2004. TRIPP IIT Delhi were appointed as technical and conceptual advisors.

GNCTD create the Delhi Integrated Multi-Modal Transit System (DIMTS) in 2006 to oversee the establishment of public transport systems in Delhi and operate it on a day-to-day basis.

A trial run took place on 21 April 2008.[1]

Operation

The first route, from Dr. Ambedkar Nagar to the south to Delhi Gate in the centre of the city, passes through some of the prime 'colonies' (urban districts) in South Delhi and is also on the main road from Delhi to the large commercial developments in Gurgaon. A trial section of the first route started in operation 20 April 2008 from Dr. Ambedkar Nagar to Moolchand. Construction work for the full length started in October 2008.

Legal challenge and 'mixed-use'

The city delayed implementation of a further 14 fast-track bus corridors in response to the level of controversy created by the first scheme.[7]

The legality of the system was challenged in 2012. During the nine-month-long legal challenge the Delhi High Court initially ruled that private vehicles should be allowed the use the bus lanes on a temporarily basis and ordered the government to review the feasibility of the project.[7] The Delhi government appealed to the Supreme Court of India against the ruling in July 2012, but was unsuccessful.[8] The high court subsequently ruled in favour of the scheme concluding that "a developed country is not one where the poor own cars. It is one where the rich use public transport".[7]

Design and operation

The 14.5 km long corridor from Ambedkar Nagar to Delhi Gate runs along a right of way which varying from 28 meters to 51.5 meters wide. Buses use a bus lane is in the middle of the road which is 3.3 meters wide with general purpose motor vehicle lanes with a width of 6.75 meters to each side. Separate lanes are also provided for non-motorized vehicles, including pedestrians, cycles and rickshaws etc. Buses run at the same level as normal traffic and share the same traffic signals.

Bus passengers need to access the bus platforms in the middle of the road by crossing the busy general purpose traffic lanes. Electronic Passenger information system displays are available in all bus shelters with the new low-floor buses on four routes – 419, 423, 521 and 522 being fitted with GPS tracking.

The first route crosses 6 key intersections, including Chirag Delhi, which is one of the busiest in Delhi and also the congested Moolchand instersection. More than 1.35 million vehicles of all types cross the junction in a typical 16-hour day. Approximately 200-250 buses which cross the junction each peak hour carry some 11,000-12,000 passengers (which is 55-60% of the total people movements). A further some 15-20% of people use private vehicles including cars, two wheelers and auto rickshaws and make up 90% of the traffic. Cars/Jeeps constitute around 35-40% of total motorized vehicles.

180 road marshals are deployed on the corridor to guide bus passengers, help children and old people to cross the road, manage traffic, instruct people to follow traffic rules and perform other corridor management activities. The company employs security guards at the bus platforms on a 24-hour basis.

The Operational Control Centre (OCC) at Kashmere Gate and a camp office at DTC Khan Pur Depot monitor the daily progress. A crane is available to remove disabled vehicles from the corridor. On average there are 3 vehicles break down on the corridor each day. Disabled vehicles including buses are typically removed in about 10 minutes.

Usage and performance

More than 60% of commuters use BRT Corridor mainly for work. Most of the respondents showed their discontent with the previous public transportation system. Respondents preferred to use their private vehicles due to inflexibility and unreliability of the bus system (according to a DIMTS commissioned socio-economic survey at BRT Corridor). More than 50% of respondents desired timeliness of bus service, clean bus and well behaved staff and certainty of bus service. 85% of the respondents, who were currently not using public transport system, showed their willingness to use new BRT system if it is good.

In 2012 it was reported that 70% of users were moving faster and there has been a 32% increase in bus ridership.[7]

Proposed development

A total 26 BRT corridors are planned, covering a total length of 310 km by the year 2020. This will be in addition to more than 400 km of metro train coverage by 2020 and further coverage by Monorail and Light Rail.

Phase Corridors Length (km)
I (2005–2010) 7 115.5
II (2010–2015)7 3 28.0
III (2015–2020) 16 166.0
Total 26 310

Criticism

Lack of enforcement

Frustrated vehicle owners choose to violate rules with impunity by using the bus lane, defeating the very purpose of BRT. With negligible prosecution, the entire concept of a BRT falls flat. "BRT as a concept is good, but the success of the corridor depends on how it is implemented. In its present form, it is congested and a large number of violations occur on the stretch that are not punished. This compromises the sanctity of the corridor. People have to be prosecuted on the spot to discourage violations. We have received complaints of pile-ups on the non-BRT lane and the long signal cycle adds to the delay in smooth crossover on the stretch," says joint commissioner of police (traffic) Satyendra Garg.

Difficulty accessing bus platforms

Not only the private car owners but the bus users too complain about bad planning. Despite the claims of DIMTS, the agency in-charge of the stretch, bus users say they are forced to scamper across the stretch to cross between the bus stands and the pavement. Without proper underpasses from the central median, where passengers get down or board the bus, a passenger does not know how to reach the bus stop as it's in the middle of the road. Not only are there no proper pedestrian crossings for road users on the BRT, the maintenance of the stretch is so poor that most of the safety markers, like bollards and speedbreakers, are broken and in a state of severe disrepair.

Explains KK Kapila, Chairman of International Road Federation (IRF), a Geneva-based global body for road safety: "At present the buses run in the middle of the road with cars and motorised traffic on narrow left lanes. Since the bus stands are in middle of the road, the scurrying passengers have to board or get off the bus in the middle of the road and have to scuttle to safety towards pavements through the regular traffic lane. This is not the full-scale BRT system followed abroad."

Longer traffic signal cycle times

At regular traffic intersections, commuters have to wait for transit of traffic along the three other arms of the intersection before getting a green signal. On BRT, the signal cycle is far more convoluted and, as a result, much longer.

"As opposed to normal traffic intersections, there are six different movements of vehicles along the arms of the intersection. The two extra movements are that of the buses on the BRT lane, which means that all commuters using the BRT or even passing through have to wait much longer. As the waiting time increases, the traffic tail lengthens much more than it normally would and there is a corresponding ripple effect on traffic," points out a senior traffic police officer.

This means that commuters are unable to cross the intersection in one signal cycle. "It takes me at least three green lights to cross each signal of the BRT. Even during non-peak hours, I am stuck in a never-ending jam. Sometimes, I feel like banging my car in frustration. I can walk faster in this corridor," says a much hassled Ratika Dang, an interior designer.

The BRT has created further choke points creating almost half km long backups since 2008.

Road safety

Increasing vehicle population is co-related with road accidents: every year road accidents cost India about 3% of its gross domestic product, which was more than $1 trillion in 2007.[9]

See also

References

  1. 1 2 http://www.expressindia.com/latest-news/brt-corridor-to-be-opened-to-public-on-may-1/297272/ BRT corridor to be opened to public on May 1
  2. http://timesofindia.indiatimes.com/city/delhi/Delhi-government-scraps-BRT-corridor-system/articleshow/48161316.cms
  3. "DMRC opens Sarita Vihar–Badarpur section". Hindustan Times. 2011-01-14. Retrieved 2011-01-14.
  4. Source: Central Pollution Control Board
  5. "Delhi row over bus lane reveals class divide". BBC News. 2012-10-15.
  6. "BBC mentions transit system as landmark of Brazil's south". BBC. Retrieved 18 October 2011.
  7. 1 2 3 4 "Delhi bus corridor stays, for common man's sake". 2010-10-18. The Delhi high court on Thursday dismissed a plea seeking scrapping of the 5.8-km bus rapid transit stretch between Ambedkar Nagar and Moolchand in south Delhi, saying it was "not an irrational decision" but taken with an eye on the future
  8. "Supreme Court rejects govt’s plea on BRT". The Times Of India.
  9. World Bank report (August 2008)

Source

External links

This article is issued from Wikipedia - version of the Saturday, March 26, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.