Dover Priory railway station

Dover Priory National Rail

The station entrance
Location
Place Dover
Local authority District of Dover
Grid reference TR313415
Operations
Station code DVP
Managed by Southeastern
Number of platforms 3
DfT category D
Live arrivals/departures, station information and onward connections
from National Rail Enquiries
Annual rail passenger usage*
2010/11 Increase 0.934 million
2011/12 Decrease 0.915 million
- Interchange  0.195 million
2012/13 Decrease 0.905 million
- Interchange  Decrease 0.177 million
2013/14 Increase 0.943 million
- Interchange  Decrease 0.133 million
2014/15 Increase 0.961 million
- Interchange  Increase 0.138 million
History
Key dates Opened 22 July 1861 (22 July 1861)
National Rail – UK railway stations
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Dover Priory from Office of Rail and Road statistics. Methodology may vary year on year.
UK Railways portal

Railways in Dover

Legend
Chatham Main Line
Ramsgate Branch and Kent Coast Line

to London Victoria
and other London Terminals

Charlton Tunnel
Dover Priory
Dover Harbour Tunnel
Dover Harbour 1861-1927
Mileage Change
↑ 77 mi 76 ch (Victoria)
↓ 76 mi 50 ch (Charing Cross)

Hawkesbury Street Junction
Connection to Train Ferry
Pier Junction
Admiralty Pier 1860-1909
Dover Marine/Western Docks 1909-1994
Dover Town 1844-1914
Archcliffe Junction
South Eastern Main Line
to London Charing Cross
and other London Terminals

Dover Priory railway station is the main station in Dover in Kent, England, with the other open station being Kearsney situated on the outskirts of Dover. (See this list for the other now-closed stations). All train services are provided by Southeastern. It is located in the south-east corner of the UK rail network and is the southern terminal of the South Eastern Main Line.

Services

A high speed service to St Pancras

As of January 2016 the off peak service is:

Services to and from Folkestone Central have been suspended since 24 December 2015 due to major damage to the track and sea wall near Dover harbour caused by strong winds & tidal surges.[1] A replacement bus service is in operation between the two stations, along with a modified timetable whilst repair work is carried out. This is expected to continue throughout 2016, whilst a new £44.5 million viaduct is constructed to replace the present rail embankment & sea wall.[2] The project is scheduled for completion in December 2016.

Preceding station National Rail Following station
Folkestone Central   Southeastern
High Speed 1
London-Sandwich
  Terminus
    Martin Mill
Folkestone Central   Southeastern
South Eastern Main Line
  Terminus
Folkestone Central   Southeastern
Kent Coast Line
  Martin Mill
Terminus   Southeastern
Chatham Main Line - Dover Branch
  Kearsney
    Canterbury East
Disused railways
Kearsney
Line and station open
  British Rail
Southern Region

Chatham Main Line - Dover Branch
  Dover Marine
Line and station closed
  British Rail
Southern Region

Chatham Main Line - Dover Branch
  Dover Harbour
Line open, station closed

History

A 1908 Railway Clearing House map of lines around Dover

Dover Priory opened on 22 July 1861[3] as the temporary terminus of the London, Chatham and Dover Railway (LCDR). It became a through station on 1 November 1861, with the completion of a tunnel though the Western Heights to gain access to the Western Docks area, where LCDR created Dover Harbour station[3] The station was known as Dover Town but was renamed in July 1863 (leading to rival SER to adopt the name for one of its Dover stations).[3]

In 1868 stationmaster Edward Walsh(e) was murdered by 18-year-old Thomas Wells, a porter for the LCDR,[4] after having rebuked him for poor work. Wells was convicted and hanged.[5]

The Southern Railway consolidated passenger services at Priory in 1927 and modernised the station in 1932.[6] The Chatham Main Line into Priory was electrified in 1959 as part of Stage 1 of Kent Coast Electrification, under the BR 1955 Modernisation Plan.[7] The line up to Ramsgate, via Deal, was subsequently electrified under stage two of Kent Coast electrification in January 1961.[7] The line from Folkestone into Priory was electrified in June 1961.[7]

The high-speed service to London St Pancras started in 2009.[8] Special dispensation had to be sought to allow the service to reach Dover as tunnels to the south are too narrow for emergency evacuation from rolling stock without end doors.

See also

References

  1. "Railway between Dover Priory and Folkestone Central closed after damage to sea wall"Network Rail Media Centre 27 December 2015; Retrieved 5 February 2016
  2. "Dover to Folkestone railway expected to reopen in December"Network Rail press release; Retrieved 8 April 2016
  3. 1 2 3 "Dover Priory Station". Dover - Lock and Key of the Kingdom. 2007. Retrieved 2007-02-10.
  4. Charles Hindley (1871). Curiosities of street literature, comprising "cocks," or "catch pennies": a large and curious assortment of street-drolleries, squibs, histories, comic tales in prose and verse, broadsides on the royal family, political litanies, dialogues, catechisms, acts of Parliament, street political papers ... Reeves and Turner. p. 239.
  5. Steve Fielding (1994). Hangman's Record 1868-1899 1. Chancery House. p. 2. ISBN 0-900246-65-0.
  6. David Glasspool (2007). "Dover Priory". Kent Rail. Retrieved 2007-03-29.
  7. 1 2 3 "Electric Railways". 'Stendec Systems'. 2007. Retrieved 2007-02-01.
  8. "Dover gets high-speed CTRL trains". BBC News. 14 July 2006. Retrieved 14 July 2006.

External links

Coordinates: 51°7′34.16″N 1°18′18.43″E / 51.1261556°N 1.3051194°E / 51.1261556; 1.3051194

This article is issued from Wikipedia - version of the Thursday, April 14, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.