Gatwick Express
| |
Overview | |
---|---|
Franchise(s): |
Gatwick Trains 28 April 1996 – 22 June 2008 Part of the South Central franchise 22 June 2008 – 19 September 2009 20 September 2009 – 25 July 2015 Part of the Thameslink, Southern and Great Northern franchise 26 July 2015 – September 2021 |
Main Route(s): | London Victoria - Gatwick Airport |
Other Route(s): | Brighton |
Fleet size: |
24 Class 442 Wessex Electric |
Stations called at: | 8 |
Stations operated: | 0 |
Route km operated: | 43.3 |
National Rail abbreviation: | GX |
Parent company: | Govia Thameslink Railway |
Website: | www.gatwickexpress.com |
Gatwick Express Route Map | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Legend | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Gatwick Express is a high-frequency rail passenger service between London Victoria and Gatwick Airport in South East England. It is the brand name used by the Govia Thameslink Railway train operating company on the Gatwick Express route of the Thameslink, Southern and Great Northern franchise.
The service began in May 1984 with air-conditioned InterCity carriages operated by British Rail. When it was privatised in April 1996, National Express took over the franchise. In June 2008, Gatwick Express ceased to exist as a separate franchise, when it was merged into the Southern train operating company, although it continues to maintain its own identity. In July 2015, Southern and Gatwick Express were merged into Govia Thameslink Railway. Alternate off-peak Gatwick Express services now continue non-stop beyond Gatwick Airport to Brighton.
Oyster cards and contactless payment cards have been accepted for travel since January 2016.[1]
History
Gatwick Airport railway station opened in June 1958. Initially the rail service was provided entirely by London to Brighton stopping services, but more trains began to call with the introduction of the summer timetable in June 1958. One of the key elements of this was the extension of Three Bridges to Bognor Regis stopping services to start and terminate at London Victoria. These trains would run through a reversible platform at Gatwick where a portion would detach and wait in the platform for passengers until the next up train from Bognor Regis was attached and the train would depart for Victoria. For this service British Rail used a small batch of seven Class 402 2HALs in order to work with the trains used on the Bognor Regis services, suitable for airport link use because of their larger luggage space.
This situation lasted until the early 1970s, when increased passenger and luggage travel to the station was rendering the old system obsolete. British Rail therefore decided to adapt a number of Class 423 4VEPs with increased luggage capacity (at the expense of fewer second class seats) and were redesignated as Class 427 4VEGs. The service however remained much the same, with the units attaching and detaching from Bognor Regis bound services running via Redhill. This led to somewhat extended journey times which meant the service lacked any real purpose, as the faster services began calling at Gatwick Airport from the early 1970s, and made the option of travelling to Gatwick from London on the service lack appeal to those who knew better.
In 1975 British Airports Authority airport director John Mulkern, British Caledonian Airways chairman Adam Thomson and British Rail's Southern Region regional manager Bob Reid, formed the Gatwick Liaison Group to discuss matters of mutual interest.
As a subsidiary of this, the Gatwick Promotion Group, under the chairmanship of the airport public relations manager David Hurst, was formed to market the airport. One of the first successes of the group was to persuade the British Rail board to redevelop Gatwick station by building a raft over the platforms, and this was opened by British Rail chairman Peter Parker in 1980. It was a long-term aim of the group to have a non-stop service between the airport and central London in order to counter the perceived distance from the capital both to the UK market and to potential passengers at the overseas destinations.
At first the service from Bognor Regis, which by this stage only stopped at East Croydon, was branded Rapid City Link.
Express service
In May 1984 the non-stop Gatwick Express service began, using Mark 2 stock. A 30-minute journey time was advertised, although some journeys would take nearer 35 minutes, especially during peak hours.
The first unit was taken on a promotional tour of the UK introducing it to travel agents in various centres, thought to be the first time a Southern Region train had travelled north.
Privatisation
Gatwick Express was the first portion of British Rail's InterCity sector to be converted into a separate train operating unit, ready for franchising as a private business with the assets transferred to Gatwick Express Limited[2] in March 1994.[3] The Gatwick Express franchise was awarded by the Director of Passenger Rail Franchising to National Express with the franchise starting on 28 April 1996.[4]
Operated by Southern
In April 2007 the Department for Transport announced that the Gatwick Express franchise was to be incorporated into the South Central franchise and the services transferred to Southern[5] on 22 June 2008.
On 20 August 2008 the Department for Transport announced that Abellio, Govia, National Express and Stagecoach had been shortlisted to bid for the new South Central franchise.[6] On 9 June 2009 the Department for Transport announced that Govia[7] had retained the franchise, beginning on 20 September 2009.[8]
Operated by Govia Thameslink Railway
The Department for Transport confirmed prior to the awarding of the new franchise that the Southern franchise would be merged at its conclusion in July 2015 into the proposed Thameslink Southern Great Northern franchise.[9][10]
In March 2012 the Department for Transport announced that Abellio, FirstGroup, Govia, MTR and Stagecoach had been shortlisted to bid for the new franchise.[11] The Invitation to Tender was to have been issued in October 2012, and the successful bidder announced in Spring 2013. However, in the wake of the InterCity West Coast refranchising process collapsing, the Secretary of State for Transport announced in October 2012 that the process would be put on hold pending the results of a review.[12]
With the last franchise expiring on 25 July 2015, the South Central franchise merged with the Thameslink Great Northern franchise to create Thameslink, Southern and Great Northern. This is operated by Govia Thameslink Railway, which is also owned by Southern's parent company, Govia. The Gatwick Express brand identity has been retained.
Services
The main service operates every 15 minutes, taking 30 minutes to cover the 27-mile journey from London Victoria to Gatwick.
In April 2007 the Department for Transport announced that the Gatwick Express franchise was to be incorporated into the South Central franchise.[13][14] This was part of a plan to increase capacity on the Brighton Main Line by extending peak-hour services from Gatwick to Brighton, with some additionally stopping at Haywards Heath, Wivelsfield, Burgess Hill, Hassocks and/or Preston Park, from December 2008. This doubled the number of London-to-Brighton express trains during those periods.
Since December 2015, as part of the timetable change, alternate Gatwick Express services have been extended to Brighton. Stations between Gatwick Airport and Brighton continue to be served at peak times only (off-peak services run non-stop); however, the number of peak-hour stopping services has increased.[15]
Ticketing
London - Gatwick is one of the few journeys on the UK National Rail network for which passengers are required to choose between different operators when buying tickets — on all other flows shared by different National Rail operators tickets for immediate travel are inter-available, although some restrictions may apply on cheaper tickets. Through tickets for which the London-Gatwick line is part of a permitted route are valid on the Gatwick Express, provided they are not endorsed Not Gatwick Express. Tickets from London to stations south of Gatwick generally bear this restriction. Southern tickets to Redhill can be used in emergencies, as the train stops there during such times.
Historically, standard Gatwick Express services did not charge penalty fares and permitted tickets to be purchased on board at no extra charge. Journeys to or from stations south of Gatwick were subject to penalty fares as normal.[16][17] This rule applied to the six weekday services each way that start or end at Brighton. However, in December 2011 electronic ticket gates were installed at Gatwick Airport and London Victoria platforms 13 and 14 (where the Gatwick Express arrives and departs), meaning that tickets can no longer be bought on the train and must be purchased either in advance or at the station before boarding.[18]
London Oyster Cards and contactless cards have been accepted for travel since January 2016.[19]
Performance
In May 2013 the Chairman of Gatwick Airport, Roy McNulty, criticised Gatwick Express for its overcrowding and old rolling stock. He said that the train service sometimes "at times veers towards Third World conditions" and that it gives air passengers arriving in the United Kingdom a bad first impression of the UK, and called for major improvements. Southern responded by stating that it had provided some 20,000 extra peak-hour seats every week on the London-Brighton line.[20]
Rolling stock
Gatwick Express currently operate a fleet made primarily of Class 442 Wessex Electrics, which it received from South West Trains. Gatwick Express received seventeen refurbished Class 442s beginning from December 2008, followed by a further seven through leases in 2009, after Southern retained the South Central franchise. The additional rolling stock allowed the company to provide extra capacity on the services extended to Brighton.
Govia Thameslink Railway placed a £145.2 million order with Bombardier for 27 Class 387/2 sets in November 2014 to replace the Class 442.[21] The type underwent testing in July 2015,[22] and began to enter passenger service in February 2016. The new stock have twelve carriages compared with ten for the Class 442, and also feature additional luggage space, Wi-Fi connectivity and passenger service updates.[23] The new trains are planned to replace the existing Class 442s by June 2016.[24]
In April 2016, drivers belonging to the ASLEF trade union refused to pick up passengers on the new Class 387 trains. The trains are fitted with "Driver-Only Operation" (DOO) capability, meaning that the driver closes the doors using CCTV and decides that it is safe to move off, rather than a guard. This is the system currently used on the 10-car Class 442 used on Gatwick Express, but the union claimed that extending this to 12-car trains put too much pressure on the driver and was unsafe. In response, GTR took legal action against the union, and the case is likely to be heard in the High Court in late April 2016.[25]
Gatwick Express's fleet is maintained at Stewarts Lane depot.
Fleet table
Class | Image | Type | Top speed | Number | Built | Notes | |
---|---|---|---|---|---|---|---|
mph | km/h | ||||||
Class 73 | Electro-diesel locomotive | 90 | 145 | 1 | 1962 | 73202, painted in current Southern livery, used as a Thunderbird (a railway locomotive that provides replacement power in the event of failure of the booked unit) | |
Class 442 formerly Wessex Electric | Electric multiple unit | 100 | 160 | 22 | 1988–1989 | Transferred from South West Trains in exchange for the Class 460s enabling them to be merged with the Class 458s in order to create 10 car trains. Class 442s are also used on Southern Brighton Main Line services. | |
Class 387/2 | Electric multiple unit | 110 | 177 | 2 (further 25 to enter service)[26] | 2015-16 | Due to replace the Class 442 by June 2016.[24] Some of the designated class are on loan to with Thameslink |
Past fleet
Until 1984 the service was operated by Class 423 slam-door stock, coded 4-VEG (G for Gatwick).
From May 1984 Mark 2F stock released from Midland Main Line duties coupled to a Class 489 Goods Luggage Van took over the services, hauled by Class 73 locomotives.[27]
A franchise commitment by National Express was the replacement of these with new stock, and eight Class 460 Junipers started to be delivered from January 1999. Because of reliability problems, some of the old stock remained in service until 2005.
To replace the last of the old stock, a pair of Class 458 Junipers were transferred from South West Trains for use as spares. They remained in their existing livery but with Gatwick Express branding. Their seating was modified from high density 3+2 seating configuration to 2+2 configuration, some seating being replaced with luggage racks. However, these units never entered service and returned to South West Trains.
The Class 460s were withdrawn from service in September 2012 to be merged with the mechanically similar Class 458 units used by South West Trains in order to provide more stock at peak times.[28]
Class | Image | Type | Number | Cars per set | Built | Withdrawn | Notes |
---|---|---|---|---|---|---|---|
Class 488/2 | Converted Mark 2 carriages | 10 | 2 | 1983–1984 | 2005 | ||
Class 488/3 | 19 | 3 | |||||
Class 489 (GLV) | electric multiple unit | 10 | 1 | 1983–1984 | 2005 | ||
Class 460 (8GAT) Juniper | electric multiple unit | 8 | 8 | 2000–2001 | 2012 | These were merged with the Class 458 units used by South West Trains to form Class 458/5. |
See also
References
- ↑ http://www.railtechnologymagazine.com/rail-news/oyster-reaches-gatwick-as-shown-on-major-new-tfl-rail-map
- ↑ Gatwick Express company no 2912338. Companies House.
- ↑ Vincent, Mike (April 2004). The Intercity Story. OPC Railprint. ISBN 978-0-86093-524-7.
- ↑ "Our History". Gatwick Express. Retrieved 21 February 2010.
- ↑ New Southern Railway Limited company no 3010919 Companies House
- ↑ "Bidders for South Central franchise announced" (Press release). Department for Transport. 20 August 2008. Archived from the original on 2 November 2013.
- ↑ Southern Railway Limited company no 6574965.Companies House.
- ↑ "Retention of South Central franchise" (Press release). Go-Ahead. 9 June 2009.
- ↑ Thameslink Franchise. Official Journal of European Union notice. 19 December 2011.
- ↑ Consultation on the Combined Thameslink, Southern and Great Northern franchise Department for Transport May 2012
- ↑ "Bidders to oversee improvements on rail franchises announced" (Press release). Department for Transport. 29 March 2012.
- ↑ "West Coast Main Line franchise competition cancelled" (Press release). Department for Transport. 3 October 2012.
- ↑ "Agreement signed to amend Gatwick Express and Southern franchises" (Press release). Department for Transport. 19 June 2007. Archived from the original on 2 November 2013.
- ↑ "Agreement to Amend Gatwick Express and Southern Franchises" (Press release). Go-Ahead. 19 June 2007.
- ↑ http://www.gatwickexpress.com/en/your-journey/timetable
- ↑ "Gatwick Extension". Southern railway. December 2008. Retrieved 23 December 2008.
- ↑ "Gatwick Express - New Extended Service". Southern. December 2008. Retrieved 3 January 2009.
- ↑ "Ticket gates - Gatwick Express". Southern Railway. Retrieved 14 March 2012.
- ↑ http://www.itv.com/news/meridian/update/2015-11-13/oyster-cards-to-be-used-at-gatwick-and-surrey-stations/
- ↑ Cecil, Nicholas (20 May 2013). "Gatwick Express 'veers towards Third World conditions'". London Evening Standard. Retrieved 23 May 2013.
- ↑ "GTR orders 27 new Class 387-2s to replace Gatwick Express fleet". Rail Technology Magazine. 18 November 2014. Retrieved 14 April 2016.
- ↑ "Gatwick Express Class 387/2 EMU on test". Railway Gazette. 23 July 2015. Retrieved 14 April 2016.
- ↑ "New Gatwick Express trains take off". Rail News. 11 March 2016. Retrieved 14 April 2016.
- 1 2 "First of 27 new trains starts running on Gatwick Express route". BBC News. 29 February 2016. Retrieved 13 April 2016.
- ↑ "Gatwick Express drivers' dispute set for High Court".
- ↑ "Gatwick Express train fleet to start entering service this month : Southern". www.southernrailway.com. Retrieved 13 February 2016.
- ↑ Rail Magazine (520), 17 August 2005: 6 Missing or empty
|title=
(help) - ↑ "SWT to merge Class 458 and Class 460 fleets". Rail Express. 5 January 2012. Retrieved 14 April 2016.
Further reading
- Tait, Geoffrey (1984). The Gatwick Express. G. Tait & Associates Ltd. OCLC 60075526.
- Allen, Geoffrey Freeman (April 1984). "I'm the new Gatwick Express - Fly me!". Rail Enthusiast (EMAP National Publications). pp. 12–14. ISSN 0262-561X. OCLC 49957965.
- "Gatwick Express orders new EMU fleet from GEC". RAIL. No. 303 (EMAP Apex Publications). 23 April – 6 May 1997. pp. 6–7. ISSN 0953-4563. OCLC 49953699.
External links
Wikimedia Commons has media related to Gatwick Express. |
Preceded by InterCity As part of British Rail |
Operator of Gatwick Express franchise 1997–2008 |
Succeeded by Southern South Central franchise |
Preceded by Gatwick Express Gatwick Express franchise |
Sub-brand of South Central franchise 2008 - 2015 |
Succeeded by Govia Thameslink Railway Thameslink, Southern and Great Northern franchise |
Preceded by Southern South Central (incl Gatwick Express) franchise |
Sub-brand of Thameslink Southern Great Northern Franchise 2015 - present |
Incumbent |
|
|
|
|